New offices in Dallas 75201
66 addresses in 75201 have permits or project filings for offices in the last two years. The most recent was filed at 2021 Mckinney Ave.
Latest filings
- 2021 Mckinney Ave · Gpi Hrlp M&o LPNov 13, 2026Remodel of existing office space. the fire sprinkler trade is - minor
- 2200 Ross Ave · Fpg Ct Owner, LPNov 13, 2026Mcr location address: 2200 ross ave, suite 5200 dallas, tx 75201 scope of work:scope will include conference rooms, storage areas, enclosed offices, workstations, idf/mdf rooms with associated mechanical, electrical, plumbing, and structural work, interior storefront walls, new light fixtures, and new finishes
- 1920 Mckinney Ave · 1900 Mckinney Harwood LLCNov 12, 2026Plumbing
- 2001 Ross Ave · Rof V Ross Investment, LLCNov 12, 2026Install new sinks and hub drain
- 3111 N Houston StNov 12, 2026Mcr overflow storage for bike mart finish out (suite 100). add sheetrock to existing metal framed walls
- 2323 N Field StNov 12, 2026Floor 5
- 100 Crescent CtNov 12, 2026Office renovation for hka
- 2501 N Harwood St · Horizon Propco I LPNov 12, 2026This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed
- 100 Crescent Court · Gpif Tc Owner LLCNov 11, 2026Hka — renovation/alteration — tenant improvement
- 200 Crescent Ct · Ascension Coffee Roasters, LLCNov 10, 2026Remodel of an existing spec suite
- 1717 Mckinney Ave · Gaedeke Holdings Xiv LtdNov 9, 2026We are replacing the backflow in the mechanical room of the garage
- 1900 N Pearl St · Strs Ohio TX Real Estate Investment Inc.Nov 9, 2026Plumbing remodel suite 2300
- 2001 Ross Avenue · Rof V Ross Investment, LLCNov 6, 2026Gibson dunn — renovation/alteration — tenant improvement
- 200 Crescent Court · Gpif Tc Owner LLCNov 6, 2026Blank rome — renovation/alteration — tenant improvement
- 2323 Cedar Springs Rd · 23 Springs LPNov 6, 2026Evercore tenant improvement suite 950 — renovation/alteration — first commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep
- 1717 Main StNov 4, 2026Mcr interior office remodel and expansion of existing suite #3030. expanding into existing vacant suite #3075
- 2100 Mckinney Ave · Gpif Tc Owner LLCOct 29, 2026Mcr location address: 2100 mckinney avenue suite 1800 dallas, tx 75201 scope of work: interior renovation
- 1900 N Pearl Street · Strs Ohio TX Real Estate Investments, Inc.Oct 27, 2026Fisher phillips llp - dallas — renovation/alteration — minor pocket construction in 18,844 sq ft office space - new non-structural walls, new finishes throughout, relocated/new lighting, relocated/new power/data
- 1919 Woodall Rodgers FwyOct 26, 2026Mcr demoing section of floor located on floor 13 to open slab between 12-14
- 300 Crescent Ct · Gpif Tc Owner, LLCOct 21, 2026Install light fixtures, install receptacles in remodel area
- 1601 Elm St · 1601 Elm Holdings LPOct 20, 202626.0124 suite 4100spec suite 4100 - reworking existing hvac system
- 2801 N. Harwood St., 25th · Hic Xiv Property Owner, LLCOct 16, 2026Bdo dallas — renovation/alteration — build out of a full floor of office space from shell space
- 2000 Mckinney Ave · Gpif 2000 Mckinney Mezz, LLCOct 15, 2026Relocation of units add ductwork
- 2101 Cedar Springs Rd · Rosewood Court, LLCOct 15, 2026Relocate four existing thermostats to the new location as shown on the plan. confirm that the thermostats are associated with the terminal box as shown on the drawing before relocating and ensure they are in working order.2. provide one acoustically lined return air boot through the wall to the deck as high as possible above the ceiling, with an inlet elbow and an outlet 90° elbow facing upward. size per plans. refer to detail sheet m0.01 for more information.3. relocate two return air grilles and related boots to the new location as indicated on the drawings.4. relocate two return air boots as indicated on the drawings.5. relocate three existing terminal boxes. remove existing medium and low-pressure ductwork as indicated on the drawings.6. install three terminal boxes at the new location. mount the boxes from the structure above. ensure box clearances are maintained at the new location. extend new medium and low-pressure ducts as indicated on the drawings. coordinate relocation with other trades involved.7. provide one access panel for equipment access requirements. refer to architectural plans for additional information and coordinate the exact location with the architect and the installed location of equipment in the field.8. provide one return air opening through the wall to the deck.9. provide two new trane vavs with controls.10. provide ductwork and insulation per plan.11. provide a certified tab report
- 1722 Routh St · Billingsley Arts Partners LtdOct 13, 2026Electrical installation and light installation
- 1818 Corsicana St · City Of DallasOct 12, 2026Add a gas generator and add a new 2 inches gas line outside biulding. underground gas line 350 liner foot
- 2100 Mckinney Avenue · Gpif 2100 Mckinney Office Owner LLCOct 12, 2026Clune dallas — renovation/alteration — interior renovation
- 2323 Cedar Springs Road · 23 Springs LPOct 7, 2026Evercore tenant improvement suite 950 — renovation/alteration — first commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep
- 300 Crescent Court · Gpif Tc Owner LLCOct 1, 2026Centerpeak — renovation/alteration — tenant finish-out: new partitions, finishes, mechanical, electrical & plumbing
- 1217 Patterson StSep 30, 2026An 8 feet tall construction fence and gate are needed around the property for a construction office trailer and for a material laydown area. one side of the lot is on the corner of patterson and n field st.. the other side of the lot faces san jacinto street. the lot is currently used only for parking
- 700 N Pearl Street · Sgp Pota, LLCSep 25, 2026Three oaks hospice — renovation/alteration — renovation/ alteration
- 2401 Mckinney AveSep 23, 2026Lvl6 garage qteam meeting 1.22.2026 (all day) phase i project, below grade garage up to lid of foundation proposed at this time to service future office tower. vertical drawings shown for reference of future phase
- 2601 Victory AveSep 21, 2026400a breaker replacement - we have been instructed this was the correct address selection msa service: esi id: 10443720001020922 meter #: 162965035 service address: 2601 victory ave, dallas msb service: esi id: 10443720002351744 meter #: 162965036 service address: 2601 victory ave, dallas
- 750 N St Paul St · Trt Investors 41, LLCSep 14, 202617th floor commercial interior remodel - same use - 14,100sf
- 2323 Cedar Springs Rd 21st & 22nd · 23 Springs LPSep 10, 2026Crusoe dallas — renovation/alteration — interior office finish-out on the 21st and 22nd floor in an existing 26 story spec office building, totaling 33,276 sq ft
- 1845 Woodall Rodgers Fwy · Wdc Fub Office Owner LLCSep 8, 2026Relocate (1) fpb and (2) vav boxes, new grilles and ductwork
- 1707 San Jacinto St · First Baptist DallasSep 8, 2026Install new plumbing
- 1919 Woodall Rodgers Fwy, Levels 19-27 · Pe Parkside Tower LLCSep 1, 2026Bank of america parkside — renovation/alteration — interior commercial office space including open offices, private offices, breakrooms, meeting spaces and amenity spaces
- 1601 Elm Street · 1601 Elm Holdings, LPAug 31, 2026Maron marvel expansion (2026) — renovation/alteration — tenant improvement
- 1900 N Pearl St, 23rd · Strs Ohio TX Real Estate Investments INCAug 25, 2026Fish & richardson dallas — renovation/alteration — interior alteration of existing commercial office space (approx. 12, 286 sq ft) with no structural work or changes to building envelope
- 700 N Pearl StAug 24, 2026Commercial remodel of existing space
- 2850 N. Harwood Street · Horizon Propco Iii, LPJul 13, 2026Silverhill energy — renovation/alteration — addition of offices in open office space
- 2101 Cedar Springs Road · Rosewood Court, LLCJun 22, 2026Griffin highline — renovation/alteration — tenant improvement
- 3310 Fairmount StJun 17, 2026• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
- 175 Oak Lawn · O & S Realty, LLCJun 17, 2026Melodian jazz lounge — renovation/alteration — interior remodel of an existing office warehouse for a new restaurant, including a new accessible route ramp
- 1900 N Akard StJun 10, 2026Q-team - jpmc dallas level 4 is a 2nd generation tenantimprovement within the existing 1900 n akard huntbuilding in dallas, tx. the project includes revisingworkstations to (2) private offices. allmechanical rms and stairs are existing to remain and outof scope. scope of work includesarchitectural, mechanical, and electrical
- 2828 N Harwood St · 2828 North Harwood Owner LPJun 5, 202650542 - presidum
- 2021 Mckinney Avenue · Gpi Hrlp M&o, LPMay 29, 2026Trive 12th floor expansion - audare — renovation/alteration — remodel of existing interior finish out. 2,775 square feet
- 2121 N Pearl St · Mcpp Park DistrictMay 28, 2026Install new airside equipment (vavs/fpbs) and associated new ductwork and grilles for office space
- 1900 N. Akard Street · Hunt Consolidated Inc.May 22, 2026Hunt 11th floor conrference room remodel — renovation/alteration — 886 sq ft
Questions
What offices are being built in Dallas 75201?
66 addresses in 75201 have permits or project filings for offices in the last two years. The most recent was filed at 2021 Mckinney Ave. Others include 2200 Ross Ave, 1920 Mckinney Ave, 2001 Ross Ave.
How can I find out when a new office is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new office permit is filed.