2501 N Harwood St
Dallas, TX 75201 · Bcg Dallas Renovation, Capital Improvements Harwood No 6 + 2 more
Office renovations and amenity upgrades at 2501 N Harwood
Permits filed in November 2026 show renovations underway in the existing multi-tenant office building at 2501 N Harwood St. The work includes a lobby renovation, elevator cab refresh, a redesigned 12th-floor amenity area and patio landscaping; a separate registration covers interior renovations on levels 21, 22 and 23.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 12, 2026
- Projects
- 43
- 43 filings
- Latest filing
- Nov 12, 2026
- since Jun 3, 2026
- Largest scope
- 25,000 sf
- Estimated cost
- $4.0M
- state registration
Permit & project history
43 projectsThis is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed
This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed
City of Dallas permitCommercial Electrical PermitMcr location address: 2501 n harwood st 2nd and 12th floors dallas tx 75201scope of work: building reposting and capital improvements lobby renovation, elevator, cab refresh, level 12 amenity floor plan with multi-tenant corridor, and landscape ground level and 12th floor patio
Mcr location address: 2501 n harwood st 2nd and 12th floors dallas tx 75201scope of work: building reposting and capital improvements lobby renovation, elevator, cab refresh, level 12 amenity floor plan with multi-tenant corridor, and landscape ground level and 12th floor patio
City of Dallas permitCommercial Electrical PermitInterior renovation on levels 21, 22 & 23 of an existing office building. selective demolition, open office areas, focus rooms, and reception renovation. — saint ann court
TDLR project registrationRenovation/AlterationProject Registered25,000 sq ft$2.8M est.- Project #
- TABS2027004955
- Tenant / owner
- Bcg Dallas Renovation
- Design firm
- Pro
- Contact
- Pro
Electrical renovations in break room and lobby- relocation of outlets and replacement of light fixtures
Electrical renovations in break room and lobby- relocation of outlets and replacement of light fixtures
City of Dallas permitCommercial Electrical PermitMcr location address:2501 n harwood st. 2nd and 12th floorsdallas, tx 75201 scope of work:building repositing & capital improvements lobby renovation, elevator cab refresh, level 12 amenity floor plan with multi-tenant corridor, and landscape ground level and 12th floor patio
Mcr location address:2501 n harwood st. 2nd and 12th floorsdallas, tx 75201 scope of work:building repositing & capital improvements lobby renovation, elevator cab refresh, level 12 amenity floor plan with multi-tenant corridor, and landscape ground level and 12th floor patio
City of Dallas permitCommercial Alteration Addition PermitBuilding repositing & capital improvements for harwood no. 6. scope includes: lobby renovation, elevator cab refresh, level 12 amenity floor plan with multi-tenant corridor, and landscape ground level and 12th floor patio. — saint ann court
TDLR project registrationRenovation/AlterationReview Complete12,000 sq ft$4.0M est.- Project #
- TABS2026027478
- Tenant / owner
- Capital Improvements Harwood No 6
- Design firm
- Pro
- Contact
- Pro
Mcr harwood building 3 - suite 300 - demolition of existing stairs and structural slab infill
Mcr harwood building 3 - suite 300 - demolition of existing stairs and structural slab infill
City of Dallas permitCommercial Alteration Addition PermitInterior renovation of existing office space. — saint ann court
TDLR project registrationRenovation/AlterationProject Registered1,343 sq ft$181K est.- Project #
- TABS2026024745
- Tenant / owner
- Amegy - Dallas - 1600
- Design firm
- Pro
- Contact
- Pro
Interior renovation of existing office space — saint ann court
TDLR project registrationRenovation/AlterationProject Registered5,626 sq ft$623K est.- Project #
- TABS2026023241
- Tenant / owner
- Amegy - Dallas
- Design firm
- Pro
- Contact
- Pro
Install rough-in, raceways, and power connections to new security devices at doorways throughout space
Install rough-in, raceways, and power connections to new security devices at doorways throughout space
City of Dallas permitCommercial Electrical PermitMcr remodelcertificate of occupancy required prior to occupancyall work subject to field inspector approvalnon-load bearing walls only
Mcr remodelcertificate of occupancy required prior to occupancyall work subject to field inspector approvalnon-load bearing walls only
City of Dallas permitCommercial Alteration Addition Permit
+ 3 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2501 N Harwood St
What is being built at 2501 N Harwood St?
Records show renovations to the existing multi-tenant office building, including lobby and elevator updates, a 12th-floor amenity area and interior office work on levels 21–23. City permits for capital improvements were filed October 15 and November 10, 2026.
Is a new office building going up at 2501 N Harwood?
The records describe renovations to an existing office building, not construction of a new building. The listed work includes tenant-space remodels and shared building improvements.
What changes are planned for the 12th floor at 2501 N Harwood?
The permit scope describes a 12th-floor amenity area with a multi-tenant corridor, along with landscaping on the 12th-floor patio. The scope also includes a lobby renovation and elevator cab refresh.
What is being renovated on levels 21, 22 and 23?
A TDLR project registration dated November 2, 2026, describes interior renovations across those floors, including selective demolition, open office areas, focus rooms and reception work. The registration lists 25,000 square feet.
What's being renovated near Griffin Highline?
At 2501 N Harwood St, about 63 meters from Griffin Highline, permits describe office-building improvements and tenant-space renovations. A capital-improvements permit was filed November 10, 2026.
What work is happening near The Link at 2601 Olive Street?
The nearby 2501 N Harwood office building has permits for shared-area upgrades and interior tenant renovations. Records describe this as work in an existing multi-tenant building, not a named new business opening.
Also being built nearby
All of 75201- 2501 N Harwood · Saint Ann Court (harwood District No. 6)Sep 2, 202612th floor restrooms — renovation/alteration — capital improvement
- 2501 North Hardwood St · Horizon Propco I LPApr 17, 2026Confidential — renovation/alteration — interior renovation on level 19 of existing building. renovation includes the addition of secure doors
- 2101 Cedar Springs Road · Rosewood Court, LLCJun 22, 2026Griffin highline — renovation/alteration — tenant improvement · 63 m away
- 2101 Cedar Sprigns Road · Rosewood Court, LLCMar 9, 2026Rosewood court - conference center — renovation/alteration — tenant improvement renovation · 63 m away
- 2101 Cedar Springs RdNov 16, 2026Replacement of 1/2" rpz device located at the dish machine inside of flower child · 63 m away
- 2514 Harry Hines BlvdJan 6, 2021Renovation · 68 m away
- 2525 Mckinnon Street 6th · Cio 2525 Mckinnon, LPOct 13, 20256th floor elevator lobby — renovation/alteration — capital improvement · 79 m away
- 2525 Mckinnon Street · Cio 2525 Mckinnon, LPDec 9, 2024Crowe & dunlevy — renovation/alteration — tenant improvement · 79 m away
- 2525 Mckinnon St · Cio 2525 Mckinnon, LPJan 15, 2026Electrical remodel · 79 m away
- 2601 Olive St., Dallas, TX 75201 · Cousins 2601 Olive, LLCJul 16, 2026The link level 01 whitebox — renovation/alteration — demolition of an existing ti space, and addition of new windows · 80 m away
- 2601 Olive Street, 23rd · The Link At Uptown, LLCMay 21, 2024Houlihan lokey - level 23 stair — new construction — subleasing the level 23, so houlihan lokey is walling in the monumental stair on level 23 · 80 m away
- 2601 Olive StJul 29, 2026Mcr interior white-box renovation of approximately 6,321 sq ft consisting of 4,675 sq ft at level 1 and 1,646 sq ft at the existing mezzanine level. scope includes demolition of existing lobby finishes, glazing systems, stair elements, partitions, ceilings, and associated mep systems; construction of new lobby architectural features, storefront entrance systems, guardrails, ceilings, finishes, and related structural, mechanical, electrical, plumbing, and fire protection work. existing occupancy remains business (group b). no increase in building area, height, or occupant load is proposed · 80 m away