48 addresses in 75201 have permits or project filings for demolitions in the last two years. The most recent was filed at 3001 Maple Ave.
Latest filings
- 3001 Maple Ave · 3001 Maple LPNov 12, 2026Job#26178h bva remodel. furnish and install fan coil unitsexhaust fansupply grilles lay in return grilles slot diffusers sidewall grilles
- 2501 N Harwood St · Horizon Propco I LPNov 12, 2026This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed
- 2615 Routh StNov 9, 2026Install construction fence around property for duration of demolition. provide consulting, specs & final report. demolish burned building & dispose of debris per neshap regulations. remove foundation system down to dirt; remove piers 2' below existing grade. backfill crawl space with common fill dirt up to existing dirt grade & rough grade. install silt fence around disturbed area. existing detached storage building & pavement to remain. load, transport & legally dispose of resultant debris
- 200 Crescent Court · Gpif Tc Owner LLCNov 6, 2026Blank rome — renovation/alteration — tenant improvement
- 2323 Cedar Springs Rd · 23 Springs LPNov 6, 2026Evercore tenant improvement suite 950 — renovation/alteration — first commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep
- 2100 Mckinney Ave · Gpif Tc Owner LLCOct 29, 2026Mcr location address: 2100 mckinney avenue suite 1800 dallas, tx 75201 scope of work: interior renovation
- 2510 Mckinney Ave · Lg Routh LPOct 21, 2026Interior remodel. demolition an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. the current coffee and juice bar location will then be converted to house the wfmao program. project is a two-part relocation that cascades through both spaces
- 1601 Elm St · 1601 Elm Holdings LPOct 20, 202626.0124 suite 4100spec suite 4100 - reworking existing hvac system
- 1933 Main StOct 16, 2026Electrical remodel floor 13
- 2000 Mckinney Ave · Gpif 2000 Mckinney Mezz, LLCOct 15, 2026Relocation of units add ductwork
- 2100 Ross AveOct 15, 2026Mcr combine suite 980 and 990 with cased opening
- 1722 Routh St · Billingsley Arts Partners LtdOct 13, 2026Electrical installation and light installation
- 2323 Cedar Springs Road · 23 Springs LPOct 7, 2026Evercore tenant improvement suite 950 — renovation/alteration — first commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep
- 2808 Fairmount StOct 7, 2026Demolition of building, foundation, associated paving, trees, as shown on demolition plan
- 2911 Routh StOct 5, 2026Demolition of building, foundation, associated paving, trees as shown on demolition plan
- 2907 Routh StOct 5, 2026Demolition of building, foundation, associated paving, trees as shown on demolition plan
- 2816 Fairmount StOct 5, 2026Demolition of structures, foundations, trees, & parking areas as shown on demolition plan
- 2821 Routh StOct 5, 2026Demolition of building, fondation, associated paving, trees as shown on demolition plan
- 300 Crescent Court · Gpif Tc Owner LLCOct 1, 2026Centerpeak — renovation/alteration — tenant finish-out: new partitions, finishes, mechanical, electrical & plumbing
- 750 N St Paul St · Trt Investors 41, LLCSep 14, 202617th floor commercial interior remodel - same use - 14,100sf
- 1707 San Jacinto St · First Baptist DallasSep 8, 2026Install new plumbing
- 2601 Olive StJul 29, 2026Mcr interior white-box renovation of approximately 6,321 sq ft consisting of 4,675 sq ft at level 1 and 1,646 sq ft at the existing mezzanine level. scope includes demolition of existing lobby finishes, glazing systems, stair elements, partitions, ceilings, and associated mep systems; construction of new lobby architectural features, storefront entrance systems, guardrails, ceilings, finishes, and related structural, mechanical, electrical, plumbing, and fire protection work. existing occupancy remains business (group b). no increase in building area, height, or occupant load is proposed
- 2601 Olive St., Dallas, TX 75201 · Cousins 2601 Olive, LLCJul 16, 2026The link level 01 whitebox — renovation/alteration — demolition of an existing ti space, and addition of new windows
- 1515 Young StJun 24, 2026Electrical remodel
- 2828 N Harwood St · 2828 North Harwood Owner LPJun 5, 202650542 - presidum
- 2001 Ross Avenue,suite 4300, Dallas, TX 75201 · Rof V Ross Investment LLCJun 3, 2026Citi - trammel crow — renovation/alteration — renovation of tenants existing space with added square footage, a complete demolition and renovation. total 7,857 sq ft
- 2121 N Pearl St · Mcpp Park DistrictMay 28, 2026Install new airside equipment (vavs/fpbs) and associated new ductwork and grilles for office space
- 2425 Mckinney AveMay 18, 2026Demolish and haul away noted gold's gym structure and associated foundation
- 401 N Ervay StMay 5, 20261. demolition existing ductwork not shown to stay on mechanical plans.2. install filter media.3. install new ductwork as shown.4. insulation for new ductwork.5. 50 supply grilles.6. 50 return grilles.7. 10 sidewall supply grilles.8. 72 supply slots.9. 1 sidewall return grille.10. 11 metal cooling only single duct vavs11 16 metal industries fpbs
- 500 N Akard St · Ross Tower Schpi.lpApr 21, 2026Q-team interior renovation of an office space on the 14thfloor of an existing 45-story office tower. therenovation scope of work includes selective demolition,construction of interior non-structural partitions, andfinish updates
- 1700 Pacific Ave · Olymbec Usa, LLCApr 7, 2026Electrical remodel
- 2927 Maple AveApr 1, 2026Electrical work at awning near the pool area. removing, replacing and installing fixtures
- 2639 Main StJan 26, 2026Scope of work consists of selective interior demolition within an existing second-generation restaurant tenant space. demolition is limited to the existing office/storage area as shown on the selective interior demolition plan. no restroom demolition or modification is included. no structural demolition or exterior work is proposed. all abandoned utilities will be capped per code by licensed trades
- 650 N Pearl StDec 22, 2025Boiler removal in mechanical room. install water softner system and rpza“
- 2200 Main St · Ghost Design DevelopmentNov 18, 202525.0366 red bull ste 400mcr remodel for suite 400
- 2200 Ross Avenue · Fortis Property GroupNov 7, 2025Spencer fane — renovation/alteration — tenant improvement
- 1900 Main StOct 15, 2025Water heater replacement
- 1505 Federal StSep 16, 2025Qteam meeting 10.9.2025 this is a mixed use project of type iib construction. there will be a renovation of existing 3.5 story building and basement. demolition penthouse (roof) to add a 4th, 5th, and 6th level additions. renovation and addition will be apartments. basement will include a public rentable storage facility, fitness center (tenants only) and boh spaces. level 01 retail tenants to remain
- 300 S Pearl ExpySep 15, 2025Suite 3751. install filter media on fpbs and ahu2. demolition ductwork as shown.3. demolition 1 fpb4. new ductwork as shown5. insulation for new duct6. 2 cable-operated dampers7. 14 new supply grilles8. 24 new return grilles9. 28 supply slots10. 1 return air slot11. 2 sidewall return grilles
- 3000 Harry Hines BlvdSep 11, 2025Install power to temp location
- 500 N. Akard, 38th · Ross Tower Schpi LPJul 10, 202538th floor demolition & restroooms — renovation/alteration — demolition of existing conditions in preparation for new full-floor tenant and renovation of multi-tenant restrooms
- 2110 Mckinney AveJul 7, 2025Demolish and haul away building and foundation
- 2719 Routh StJul 2, 2025Rear concrete parking area will remain. demolish two story structure and foundation. remove adjacent private sidewalk and flatwork. basement (appx: 35; x 16' x 8'): break up/remove concrete and backfill and compact
- 650 North Pearl Street · Marriott Dallas DowntownJun 19, 2025Marriott dallas downtown m-club — renovation/alteration — interior renovation of 16th floor hotel concierge lounge (3200 sq ft) and adjacent areas to include minimal demolition and installation of new walls, fixtures, finishes and case goods
- 411 N Akard StMay 28, 2025Furnishing of labor, materials, equipment and services in connection with the construction of the hvac project
- 904 S Ervay StMay 23, 2025Demolition the existing building at 904 s ervay st. all restructures to be removed. no trees will be removed.**all structures to be removed. all debris removed. no tree removal. parking lot to remain until 5-16-26. dbax
Questions
What demolitions are being built in Dallas 75201?
48 addresses in 75201 have permits or project filings for demolitions in the last two years. The most recent was filed at 3001 Maple Ave. Others include 2501 N Harwood St, 2615 Routh St, 200 Crescent Court.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.