New parking structures in Katy 77449
3 addresses in 77449 have permits or project filings for parking structures in the last two years. The most recent was filed at 20720 Clay Center Drive.
Latest filings
- 20720 Clay Center Drive · District713 INCMay 6, 2026Iroiro2 - 59k — new construction — build a 59,280 sq ft tilt-wall construction building, with a small 2252 sq ft ti office space, with parking lot
- 20724 Clay Center Drive · District713 INCMay 6, 2026Iroiro2 - 10k — new construction — build a 9,960 sq ft tilt-wall construction building with a small 1260 sq ft ti office space, and parking lot
- 1019 Westside Parkway · Electrify America EvcsDec 2, 2025Tx219030 westside pointe — new construction — construct/install new parking lot with ev charging facility to include dispenser and power unit equipment
- 21501 Park Row · Mapletree InvestmentsNov 12, 2024Johnson supply — renovation/alteration — project is 14,870 sq ft total with 4,722 sq ft of interior remodel in an existing building. there is no exterior work. all buildings , parking, and site work are existing
- 2715 Mason Road · Jamms Real Estate LLCMar 15, 2024Dr. sosa — renovation/alteration — interior build out for a clinic approx. 8,670 sq ft within a existing building. all exterior conditions, including site parking, is to remain as is, no changes to building envelope
- 21401 Park Row Dr · Mapletree InvestmentsFeb 8, 2024Nanotech materials — renovation/alteration — project is 42,603 sq ft total with 4,464 sq ft of interior remodel in an existing shell building. there is no exterior work. all buildings , parking, and site work are existing
Questions
What parking structures are being built in Katy 77449?
3 addresses in 77449 have permits or project filings for parking structures in the last two years. The most recent was filed at 20720 Clay Center Drive. Others include 20724 Clay Center Drive, 1019 Westside Parkway, 21501 Park Row.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.