New apartments & multifamily in Dallas 75201
11 addresses in 75201 have permits or project filings for apartments & multifamily in the last two years. The most recent was filed at 1999 Mckinney Ave.
Latest filings
- 1999 Mckinney AveOct 30, 2026Exhaust fans and duct work
- 400 S St Paul StOct 5, 2026Providing power to motors and motor control for grease trap
- 2114 Aylesport DrSep 1, 2026Saw cut and remove approximately 60 lf of existing concrete.excavate approximately 90 lf of trench, approximately 2 feet deep, from the garage to the gas meter.install approximately 90 lf of new 1-inch polyethylene gas piping.install two new gas risers, one at the meter and one at the garage.make necessary connections to the existing gas piping.pressure test the newly installed gas service line.pressure test the existing gas line feeding the apartment at the garage
- 2013 Jackson StJul 27, 2026Generator mechanical
- 1918 Olive St · Museum TowerJul 6, 2026Terrace lounge kitchen remodel
- 3310 Fairmount StJun 17, 2026• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
- 400 N St Paul StNov 6, 2025Gas leak atmos locked the meter out we have made the repairs on the gas line and there is no more leaks
- 1401 Commerce StSep 29, 2025Qteam meeting 11.13.2025 1401 commerce starchitectural renovation of a historic landmark building. interior design includes new main lobby, guestroom tower, guest amenities, multifamily units and amenities
- 1505 Federal StSep 16, 2025Qteam meeting 10.9.2025 this is a mixed use project of type iib construction. there will be a renovation of existing 3.5 story building and basement. demolition penthouse (roof) to add a 4th, 5th, and 6th level additions. renovation and addition will be apartments. basement will include a public rentable storage facility, fitness center (tenants only) and boh spaces. level 01 retail tenants to remain
- 1401 Commerce Street · Magnolia BuildingAug 14, 2025Magnolia — renovation/alteration — architectural renovation of a historic landmark building. interior design includes new main lobby, guestroom tower, guest amenities, multifamily units and amenities
- 3031 N Harwood St · Kdp Ch Investors, Lp.Jul 21, 2025Qteam meeting 9.4.2025 3131 n harwood for office and 3031 n harwood for hotel 29 story hotel/condo tower, core/shell & interiors (1 lobby level/amenity level/8 levels hotel/13 levels condo)17 level office building, core & shell (level 1 lobby, 16 levels office)4 above grade parking 3 stories of basement level
- 2588 N Houston StJul 18, 2025Qteam qr water leaks into the penthouse apartment. we will be deconstructing part of the decorative glass structure on the roof over the corner of houston & payne to find and fix the leaks. we will build a scaffolding structure for the swing stage to rest on. this will cover and protect the sidewalk, and/or pedestrians. once all is mitigated and fixed, we will re-install the cladding and roof glass. this process could take up to 60 days
- 400 N. Saint Paul Street · Hartford Living, LLCJun 9, 2025The hartford — renovation/alteration — historic renovation of a 15 story masonry office building into a multi-family development with 217 residential apartments on floors 2-13. the 14th floor will be transformed into the residential amenity space
- 400 S Ervay StMay 13, 2025Rn199in - tankless water heater in
- 2250 Connector DrMar 1, 20242250 connector drive. a project with 11 apartment buildings, a clubhouse, and a cabana
Questions
What apartments & multifamily are being built in Dallas 75201?
11 addresses in 75201 have permits or project filings for apartments & multifamily in the last two years. The most recent was filed at 1999 Mckinney Ave. Others include 400 S St Paul St, 2114 Aylesport Dr, 2013 Jackson St.
How can I find out when a new apartment project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new apartment project permit is filed.