2300 Lake Stone Cv
Bee Cave, TX 78738
Backup battery system planned at 2300 Lake Stone Cv
An electrical permit indicates a backup battery system and additional meter socket are being installed at 2300 Lake Stone Cv in Bee Cave. The active permit was filed October 9, 2026.
Summarized from City of Austin records · updated Oct 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2026
- since Oct 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj. base: installing a backup battery system and additional meter socket
- AppliedSep 22, 2026
- IssuedOct 9, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj. base: installing a backup battery system and additional meter socket
Etj. base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-124915 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2300 Lake Stone Cv
What is being installed at 2300 Lake Stone Cv?
An active electrical permit describes installing a backup battery system and an additional meter socket.
When was the permit filed for 2300 Lake Stone Cv?
The permit was filed October 9, 2026.
What is the permit number for 2300 Lake Stone Cv?
The permit number is 2026-124915 EP, filed October 9, 2026.
Is a new home being built at 2300 Lake Stone Cv?
The available record is an electrical permit for a backup battery system and additional meter socket. It does not describe new-home construction.
Is the permit for a battery system at 2300 Lake Stone Cv active?
Yes. The City of Austin permit record lists status as Active.
Also being built nearby
All of 78738- 2301 Windswept DrJun 20, 2025Replace feeder wires coming from meter can to panel install surge protector install new grounding system · 266 m away
- 12104 Carlsbad DrJan 24, 2025Full ug service: meter and panel · 317 m away
- 10829 Pointe View DrSep 9, 2025Request to disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required · 359 m away
- 10820 Pointe View DrMay 13, 2025Install new 9.2 kw roof-top solar system to existing residential only · 408 m away
- 2509 Watercrest DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 460 m away
- 12004 Preserve Vista TerMar 9, 2026New construction electrical 6804 sq ft etj · 463 m away
- 2504 Sonoma CvOct 22, 2024Upgrading existing service 150 amps to 200 amps etj · 482 m away
- 10601 Pointe View DrSep 29, 202524kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (will locke) · 484 m away
- 11901 Loomis DrAug 25, 2026Base: installing a backup battery system and additional meter socket · 490 m away
- 2601 Cascade Falls DrJul 17, 2025Replacement of an existing water heater installing like/like e water heater · 509 m away
- 12015 Pleasant Panorama VwOct 16, 2026Base: installing a backup battery system and additional meter socket · 516 m away
- 12032 Tulare DrOct 16, 202510.375 kw solar panel installation on an existing residential roof · 580 m away