Rooftop solar and battery permitted at 10829 Pointe View Dr
Austin permits dated September 9, 2025, cover a 13.05-kW rooftop solar system and an 11.5-kW energy storage system at this residence. A second permit covers disconnecting service for a new 200-amp automatic transfer switch on the existing 200-amp panel.
Summarized from City of Austin records · updated Sep 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 9, 2025
- since Sep 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required
- AppliedSep 5, 2025
- IssuedSep 9, 2025
- WorkSep '25 – Nov '25
- Final inspectionNov 19, 2025
Passed final inspection Nov 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required
Request to disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required
City of Austin permitElectrical PermitFinal- Record
- 2025-113300 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install a new 13.05 kw rooftop solar system and 11.5 kw energy storage system to existing residential only
Install a new 13.05 kw rooftop solar system and 11.5 kw energy storage system to existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-113268 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10829 Pointe View Dr
What is being installed at 10829 Pointe View Dr?
Permits indicate a 13.05-kW rooftop solar system, an 11.5-kW energy storage system and a new 200-amp automatic transfer switch.
When were the permits for 10829 Pointe View Dr filed?
Both Austin electrical permits were filed on September 9, 2025.
Is a battery system part of the project at 10829 Pointe View Dr?
Yes. Permit 2025-113268 EP covers an 11.5-kW energy storage system alongside the rooftop solar installation.
How large is the rooftop solar system at 10829 Pointe View Dr?
Permit 2025-113268 EP describes a 13.05-kW rooftop solar system for the existing residence.
What electrical work is permitted at 10829 Pointe View Dr?
Permit 2025-113300 EP covers a service disconnect for a new 200-amp automatic transfer switch on the existing 200-amp panel. The permit says no new meter can is required.
Are the permits for 10829 Pointe View Dr final?
Both permits are listed with final status: 2025-113268 EP for solar and energy storage, and 2025-113300 EP for the transfer switch work.
Also being built nearby
All of 78738- 10820 Pointe View DrMay 13, 2025Install new 9.2 kw roof-top solar system to existing residential only · 64 m away
- 2301 Windswept DrJun 20, 2025Replace feeder wires coming from meter can to panel install surge protector install new grounding system · 105 m away
- 10601 Pointe View DrSep 29, 202524kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (will locke) · 198 m away
- 2509 Watercrest DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 238 m away
- 11533 Lake Stone DrJul 30, 2025Roof mount solar installation · 342 m away
- 2300 Lake Stone CvOct 9, 2026Etj. base: installing a backup battery system and additional meter socket · 359 m away
- 2308 Chloes Bloom BndJul 11, 2025Emergency ae pulled the meter replacing meter · 366 m away
- 2504 Sonoma CvOct 22, 2024Upgrading existing service 150 amps to 200 amps etj · 385 m away
- 2601 Cascade Falls DrJul 17, 2025Replacement of an existing water heater installing like/like e water heater · 424 m away
- 1809 Sea Eagle VwSep 7, 2026Base: installing a backup battery system and additional meter socket · 436 m away
- 12004 Preserve Vista TerMar 9, 2026New construction electrical 6804 sq ft etj · 451 m away
- 2200 Cades Spirit BndSep 19, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 455 m away
More warehouses & industrial in 78738, solar installs in 78738.