101 W. Abram St
Arlington, TX 76010 · Pwsw25002 2026 Miscellaneous Sidewalk And Ada Ramps At Various Locations, Pwst23004: Residential Rebuild Phase 1(carla Ave To Cloudcroft Dr) + 5 more
Arlington registers citywide sidewalk and ADA ramp work
Arlington registered sidewalk and ADA ramp projects serving locations across the city, including Brown Boulevard and the Carla Avenue-to-Cloudcroft Drive area. The registrations were filed from February 24 through July 20, 2026; the latest describes work at various locations, including safe-route-to-school requests.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 20, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Jul 20, 2026
- since Mar 26, 2024
- Largest scope
- 61,650 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
In state plan reviewPWSW25002 2026 Miscellaneous Sidewalk and ADA Ramps at Various Locations
61,650 sq ft · $992K est.
- RegisteredJul 20, 2026
- Plan reviewnow
- ConstructionOct '26 – Oct '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
7 projectsConstruct ada facilities such as sidewalks, handicap ramps, etc., address safe route to school request, and general sidewalk request throughout the city of arlington. — arlington city hall
TDLR project registrationNew ConstructionProject Registered61,650 sq ft$992K est.- Project #
- TABS2026025644
- Tenant / owner
- Pwsw25002 2026 Miscellaneous Sidewalk And Ada Ramps At Various Locations
- Design firm
- Pro
- Contact
- Pro
4-inch thick reinforced concrete sidewalks – 2,760 sy totaling $207,000 ada compliant barrier free ramp (txdot ped-18) – 36 ea totaling $90,000 = 24,842 sq ft — city of arlington hall
TDLR project registrationRenovation/AlterationReview Complete24,840 sq ft$297K est.- Project #
- TABS2026015050
- Tenant / owner
- Pwst23004: Residential Rebuild Phase 1(carla Ave To Cloudcroft Dr)
- Design firm
- Pro
- Contact
- Pro
Installation of sidewalks and ada pedestrian ramps on brown blvd from north collins to approximately 150 feet east of meandering way (see attached miscellaneous for more). — arlington city hall
TDLR project registrationNew ConstructionReview Complete11,790 sq ft$349K est.- Project #
- TABS2026013328
- Tenant / owner
- Pwsw23001: Brown Boulevard Sidewalk Improvements (n. Collins St To Hidden Ridge Drive)
- Design firm
- Pro
- Contact
- Pro
Reconstructing sidewalks and handicap ramps and installation of new sidewalks and ramps to address ada issues, safe route to school request, and general sidewalk request throughout the city of arlington. — arlington city hall
TDLR project registrationRenovation/AlterationProject Closed36,000 sq ft$1.2M est.- Project #
- TABS2024015678
- Tenant / owner
- Pwsw24001: 2024 Miscellaneous Sidewalk & Ada Ramp At Various Location
- Design firm
- Pro
- Contact
- Pro
Replacement and upgrades to security devices; added security intervention materials; added interior partitions and doors. — arlington city hall
TDLR project registrationRenovation/AlterationReview Complete1,100 sq ft$600K est.- Project #
- TABS2024014713
- Tenant / owner
- Coa Security Upgrades
- Design firm
- Pro
- Contact
- Pro
Replacement of interior partitions, doors and finishes. relocation of lighting and air devices. addition of electrical power and switches. — arlington city hall
TDLR project registrationRenovation/AlterationProject Closed3,350 sq ft$400K est.- Project #
- TABS2024014716
- Tenant / owner
- Water Admin Furniture And Office Improvements
- Design firm
- Pro
- Contact
- Pro
Constructing a new roadway including sidewalk, driveway's, curb ramps, streetlights. and traffic signals. — center street row
TDLR project registrationNew ConstructionProject Closed66,276 sq ft$650K est.- Project #
- TABS2023020703
- Tenant / owner
- Pwst19007 - Center Street (bardin Road To Green Oaks Boulevard)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 101 W. Abram St
What is being built at 101 W. Abram St. in Arlington?
The records associated with this address describe sidewalk and ADA ramp projects at various Arlington locations, not construction confined to 101 W. Abram St. The latest registration, TABS2026025644, was filed July 20, 2026.
Are new sidewalks being built in Arlington?
Yes. Arlington registered sidewalk and ADA ramp work, including projects on Brown Boulevard and in the Carla Avenue-to-Cloudcroft Drive area. The registrations were filed February 24 and March 16, 2026.
What is the 2026 sidewalk and ADA ramp project in Arlington?
The July 20, 2026 registration, TABS2026025644, covers sidewalks and ADA facilities at various city locations and mentions safe-route-to-school and general sidewalk requests. The applicant's estimated project cost is $992,000.
Where are the Brown Boulevard sidewalk improvements?
The registered project covers Brown Boulevard from North Collins Street to approximately 150 feet east of Meandering Way. TABS2026013328 was filed February 24, 2026.
What's being built near the City Secretary Office Renovation?
The nearby records include Arlington sidewalk and ADA ramp projects, but their descriptions place the work at various city locations, on Brown Boulevard, and between Carla Avenue and Cloudcroft Drive—not specifically at the City Secretary Office. The office renovation is listed at 101 W. Abram St.
Is the sidewalk work near Game Theory on East Front Street?
The records identify Game Theory at 200 E. Front St. as a nearby landmark, but do not say the sidewalk projects are taking place there. The registered work is described at other Arlington locations, including Brown Boulevard and the Carla Avenue-to-Cloudcroft Drive area.
Also being built nearby
All of 76010- 101 W Abram Street · City Of Arlington, TexasSep 9, 2026City secretary office renovation — renovation/alteration — renovations to the city secretary department creating a small suite of offices
- 100 W Abram St · City Of ArlingtonOct 7, 2026Levitt av security — renovation/alteration — removing existing av screen including structure and replacing with new av screen and structure on both sides of existing pavilion · 13 m away
- 200 E .abram Street · Cd/Park 7 Arlington Owner, LPJul 30, 2025Arwa coffee — renovation/alteration — 3270 sq ft of space to be converted into a new coffee shop · 129 m away
- 105 S Mesquite St · City Of ArlingtonAug 13, 2024The downtown arlington doggie depot construction — new construction — creation of dog park with small and large off-leash areas, and an on-leash seated area. project includes landscaping, fencing, concrete pathway, lighting, and furniture · 165 m away
- 101 S. Mesquite Street · City Of ArlingtonApr 2, 2024Arlington city tower elevator replacement — renovation/alteration — replace three elevators in main lobby · 168 m away
- 101 S. Mesquite St. Arlington TX -76010 · City Of ArlingtonJan 19, 2024City of arlington - city tower interior renovation flrs 1-8 — renovation/alteration — interior remodel to include renovated restroom to meet ada requirements, new interior finishes at elevator lobbies/corridors, typical on all floors level 1-8 and interior office lobby entry modification - level 3 · 168 m away
- 101 S Mesquite St · City Of Arlington TexasApr 1, 2026Phase 2 traffic management center 4th floor city tower — renovation/alteration — this project consists of renovation to a 1,689 square feet portion of the 4th floor of the city tower building to accommodate administrative offices to support the traffic management center (tmc) issued as phase 1 separate from this project · 168 m away
- 400 S. Pecan · University Of Texas At ArlingtonJun 17, 2025Post office relocation to bookstore remodel — renovation/alteration — renovating an area in the building for a post office operation · 260 m away
- 200 East Front Street · 100 East Front LLCMay 28, 2024Sfc whitebox — renovation/alteration — interior tenant improvement including mechanical, electrical, and plumbing. no site work · 266 m away
- 200 E Front StJan 20, 2025Mama cuca's restaurant — renovation/alteration — renovation · 266 m away
- 200 E Front St · 100 East Front LLCDec 10, 2025Game theory — renovation/alteration — interior finish out · 266 m away
- 209 North Pecan St · United Texkam Co.Jul 29, 2024Huckleberry's restaurant construction — new construction — new restaurant tenant finish-out interior construction including: walls, finishes, fixtures, equipment, hvac, lighting, power, plumbing installation · 274 m away