AV screens and structures to be replaced at Levitt Pavilion
Existing AV screens and supporting structures on both sides of Levitt Pavilion are slated for replacement. The project was registered with the Texas Department of Licensing and Regulation on October 7, 2026; the applicant estimated its cost at $2.3 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2026
- since Oct 7, 2026
- Largest scope
- 400 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
In state plan reviewLevitt AV Security
400 sq ft · $2.3M est.
- RegisteredOct 7, 2026
- Plan reviewnow
- ConstructionNov '26 – Jan '27
- Inspected
- Closed
Construction is scheduled to start Nov 30, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemoving existing av screen including structure and replacing with new av screen and structure on both sides of existing pavilion — levitt pavilion
TDLR project registrationRenovation/AlterationProject Registered400 sq ft$2.3M est.- Project #
- TABS2027003028
- Tenant / owner
- Levitt Av Security
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 100 W Abram St
What is being built at 100 W Abram St in Arlington?
A TDLR registration describes replacing the existing AV screens and supporting structures on both sides of Levitt Pavilion. The project was registered October 7, 2026.
Is Levitt Pavilion getting new AV screens?
Yes. The registered scope calls for removing the existing AV screens and structures and replacing them with new ones on both sides of the pavilion.
When was the Levitt Pavilion AV project registered?
The project was registered with the Texas Department of Licensing and Regulation on October 7, 2026.
How much will the Levitt Pavilion screen project cost?
The applicant's estimated cost in the TDLR registration is $2.3 million. This is an estimate, not a reported final project cost.
What's being built near the City Secretary Office Renovation at 101 W Abram Street?
The nearby Levitt Pavilion project at 100 W Abram St is a replacement of AV screens and supporting structures on both sides of the pavilion. It was registered October 7, 2026.
What's happening near Game Theory on East Front Street?
A TDLR registration for Levitt Pavilion, about 277 meters away at 100 W Abram St, describes replacing AV screens and supporting structures. The registration date is October 7, 2026.
Also being built nearby
All of 76010- 101 W Abram Street · City Of Arlington, TexasSep 9, 2026City secretary office renovation — renovation/alteration — renovations to the city secretary department creating a small suite of offices · 13 m away
- 101 W. Abram St · City Of ArlingtonJul 20, 2026Pwsw25002 2026 miscellaneous sidewalk and ada ramps at various locations — new construction — construct ada facilities such as sidewalks, handicap ramps, etc., address safe route to school request, and general sidewalk request throughout the city of arlington · 13 m away
- 200 E .abram Street · Cd/Park 7 Arlington Owner, LPJul 30, 2025Arwa coffee — renovation/alteration — 3270 sq ft of space to be converted into a new coffee shop · 129 m away
- 105 S Mesquite St · City Of ArlingtonAug 13, 2024The downtown arlington doggie depot construction — new construction — creation of dog park with small and large off-leash areas, and an on-leash seated area. project includes landscaping, fencing, concrete pathway, lighting, and furniture · 173 m away
- 101 S. Mesquite Street · City Of ArlingtonApr 2, 2024Arlington city tower elevator replacement — renovation/alteration — replace three elevators in main lobby · 176 m away
- 101 S. Mesquite St. Arlington TX -76010 · City Of ArlingtonJan 19, 2024City of arlington - city tower interior renovation flrs 1-8 — renovation/alteration — interior remodel to include renovated restroom to meet ada requirements, new interior finishes at elevator lobbies/corridors, typical on all floors level 1-8 and interior office lobby entry modification - level 3 · 176 m away
- 101 S Mesquite St · City Of Arlington TexasApr 1, 2026Phase 2 traffic management center 4th floor city tower — renovation/alteration — this project consists of renovation to a 1,689 square feet portion of the 4th floor of the city tower building to accommodate administrative offices to support the traffic management center (tmc) issued as phase 1 separate from this project · 176 m away
- 400 S. Pecan · University Of Texas At ArlingtonJun 17, 2025Post office relocation to bookstore remodel — renovation/alteration — renovating an area in the building for a post office operation · 249 m away
- 200 E Front St · 100 East Front LLCDec 10, 2025Game theory — renovation/alteration — interior finish out · 277 m away
- 200 East Front Street · 100 East Front LLCMay 28, 2024Sfc whitebox — renovation/alteration — interior tenant improvement including mechanical, electrical, and plumbing. no site work · 277 m away
- 200 E Front StJan 20, 2025Mama cuca's restaurant — renovation/alteration — renovation · 277 m away
- 209 North Pecan St · United Texkam Co.Jul 29, 2024Huckleberry's restaurant construction — new construction — new restaurant tenant finish-out interior construction including: walls, finishes, fixtures, equipment, hvac, lighting, power, plumbing installation · 285 m away