1320 South 7th St
Waco, TX 76706 · Baylor University
Baylor plans Pat Neff Hall office renovation
A 1,951-square-foot renovation is planned for Baylor University's Office of General Counsel in Suite 213 on the second floor of Pat Neff Hall. The TDLR project registration was filed March 4, 2026, and describes a cosmetic alternate scope. The applicant's estimated project cost is $250,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2026
- since Mar 4, 2026
- Largest scope
- 1,951 sf
- Estimated cost
- $250K
- state registration
Where this project stands
Finishing up · inspection nextBaylor University Pat Neff 2nd Floor Suite 213 Renovation
1,951 sq ft · $250K est.
- RegisteredMar 4, 2026
- Plan review
- ConstructionMar '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of existing baylor university office of general council office space - base bid: 1951 sq ft; additinal alternate scope is cosmetic. — patt neff hall
TDLR project registrationRenovation/AlterationReview Complete1,951 sq ft$250K est.- Project #
- TABS2026014186
- Tenant / owner
- Baylor University Pat Neff 2nd Floor Suite 213 Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1320 South 7th St
What is being renovated at 1320 South 7th St in Waco?
A TDLR registration describes a renovation of Baylor University's Office of General Counsel in Pat Neff Hall, Suite 213. The base scope covers 1,951 square feet.
When was the Pat Neff Hall renovation filed?
The TDLR registration was filed March 4, 2026. The project is listed as TABS2026014186.
Is Baylor building a new office at Pat Neff Hall?
No new building is described. The registration is for renovation of existing Baylor office space on the second floor.
How much is the Pat Neff Hall office renovation expected to cost?
The applicant's estimated cost for the project is $250,000.
How large is the Baylor Office of General Counsel renovation?
The base bid covers 1,951 square feet. The registration also mentions an additional cosmetic alternate scope.
What's being renovated near Baylor University 1845 Memorial Remodel?
The Pat Neff Hall Office of General Counsel is slated for renovation at 1320 South 7th St. The nearby Baylor University 1845 Memorial Remodel is listed about 125 meters away.
Also being built nearby
All of 76706- 1320 S 7th Street · Baylor UniversityNov 11, 2024Baylor pat neff 2nd floor suite 225 renovations — renovation/alteration — renovations to 2890 sq ft of office space. some wall changes within the suite to create larger offices and finish updates
- 1420 South 7th St · Baylor UniversityApr 3, 2024Bu draper classrooms 140, 143, 341, 347, 349, 351, & 353 renovations — renovation/alteration — renovations totaling 4,674 square feet (1st floor 1,191 & 3rd floor 3,483) generally including updates to finishes, lighting, and equipment in existing classrooms · 120 m away
- 1420 S. 7th St · Baylor UniversityMay 5, 2025Baylor draper 1st floor classroom 147 renovations — renovation/alteration — renovations of approximately 2,215 sq ft to classroom 147 · 120 m away
- 1425 S 7th St, Waco TX · Baylor UniversityJan 13, 2026Baylor univeristy 1845 memorial remodel — renovation/alteration — interior renovation of an existing dining hall on the 1st floor of an existing 3-story building · 125 m away
- 1311 South 5th Street · Baylor UniversityApr 13, 2026Bu bill daniel student center 3rd floor va one stop renovation — renovation/alteration — renovations of approximately 572 square feet on the 3rd floor of bdsc to create a 2 offices and a conference room for the va one stop program · 219 m away
- 1110 South 7th Street · Baylor UniversityApr 15, 2025Baylor university kokernot hall renovation — renovation/alteration — interior renovations with new plan configurations for residence hall needs; all new mepfp systems; existing elevator will be modernized; minor building. enclosure upgrades; site includes accessibility upgrades · 220 m away
- 1410 S 5th Street · Baylor UniversityMay 18, 2026Bu morrison hall classroom updates — renovation/alteration — classroom renovations of approximately 15,000 square feet to the 1st floor of morrison hall, as well as approximately 1,000 square feet of office updates on the 2nd floor to accommodate the 1st floor construction scope · 255 m away
- 600 Speight Ave · Baylor UniversityApr 8, 2026Bu tidwell - garden level, 1st floor, & 2nd floor office renovations — renovation/alteration — renovations to the garden level of 1,148 square feet, renovations to the 1st floor of 215 square feet, and renovations to the 2nd floor of 242 square feet to create a classroom and offices · 337 m away
- 1214 S 4th St · Baylor UniversitySep 22, 2026Baylor- marrs mclean science building- stair tower decommission — renovation/alteration — removal of existing stair tower totaling approximately 225 square feet · 367 m away
- 500 Speight Ave · Baylor UniversityNov 9, 2026Baylor bobo spiritual life center- interior renovations — renovation/alteration — minor interior renovations totaling 5,460 sq ft · 387 m away
- 1410 South 4th St · Baylor UniversityApr 9, 2024Bu sid richardson garden level testing center renovations — renovation/alteration — renovations totaling 2,732 square feet converting two existing classrooms into 8 testing rooms along with 3 offices, a computer area, and a cubbies area · 402 m away
- 919 S 6th Street · Crest Six LLCNov 17, 2026Proposed remodel of existing drive-thru qsr to drive thru qsr · 466 m away