groundranger
Recent · latest filing Dec 2025Commercial

24835 Cathedral Lakes Parkway

Spring, TX 77386 · Iqct Houston Properties LLC

Engineered Air Balance proposes a 57,867-square-foot facility

A proposed 57,867-square-foot Engineered Air Balance facility with associated site work is registered for 24835 Cathedral Lakes Parkway in Spring. The TDLR registration was filed December 23, 2025, and lists an estimated project cost of $11 million.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 23, 2025

Projects
1
1 filings
Latest filing
Dec 23, 2025
since Dec 23, 2025
Largest scope
57,867 sf
Estimated cost
$11M
state registration

Where this project stands

Under construction

ENGINEERED AIR BALANCE

57,867 sq ft · $11M est.

  1. RegisteredDec 23, 2025
  2. Plan review
  3. ConstructionFeb '26 – Jan '28
  4. Inspected
  5. Closed
40% through of a 24-month buildFeb 1, 2026 → Jan 31, 2028

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. ENGINEERED AIR BALANCE

    New building and associated site work. — engineered air balance - proposed new facility

    TDLR project registrationNew ConstructionReview Complete57,867 sq ft$11M est.
    Tenant / owner
    Engineered Air Balance
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 24835 Cathedral Lakes Parkway

What is being built at 24835 Cathedral Lakes Parkway?

A proposed 57,867-square-foot facility for Engineered Air Balance, with associated site work, is listed in TDLR registration TABS2026008859, filed December 23, 2025.

Is Engineered Air Balance building a new facility in Spring?

A TDLR project registration describes a proposed new Engineered Air Balance facility at 24835 Cathedral Lakes Parkway. It was filed December 23, 2025.

How large is the proposed Engineered Air Balance facility?

The TDLR registration lists the proposed building at 57,867 square feet.

How much will the Engineered Air Balance project cost?

The TDLR registration lists an estimated project cost of $11 million. This is the applicant's estimate for the project.

When was the project registered?

The TDLR registration for the proposed facility was filed on December 23, 2025. Its listed status is Review Complete.

Is the new Engineered Air Balance facility already open?

The record describes a proposed new facility and associated site work. It does not state that construction is complete or that the facility is open.

Email me when it passes inspection