2403 Rayford Road
Spring, TX 77386 · Faith United Methodist Church
Faith United Methodist Church interior remodel in Spring
An interior remodel is planned for the existing main church building and children's building at 2403 Rayford Road. The TDLR project registration was filed May 14, 2026, for 22,251 square feet; its status is listed as Review Complete. The applicant's estimated project cost is $900,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2026
- since May 14, 2026
- Largest scope
- 22,251 sf
- Estimated cost
- $900K
- state registration
Where this project stands
Finishing up · inspection nextFaith United Methodist Church - Interior Remodel
22,251 sq ft · $900K est.
- RegisteredMay 14, 2026
- Plan review
- ConstructionJun '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 10, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior remodel of existing main church building and children's building — faith united methodist church
TDLR project registrationRenovation/AlterationReview Complete22,251 sq ft$900K est.- Project #
- TABS2026020361
- Tenant / owner
- Faith United Methodist Church - Interior Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2403 Rayford Road
What is being built at 2403 Rayford Road in Spring?
A TDLR registration describes an interior remodel of the existing Faith United Methodist Church main building and children's building. It was filed May 14, 2026, under project number TABS2026020361.
Is Faith United Methodist Church building a new church in Spring?
The registration describes an interior remodel of existing church buildings, not new construction. It covers 22,251 square feet.
When was the Faith United Methodist Church remodel filed?
The TDLR project registration was filed May 14, 2026. Its status is listed as Review Complete.
How much will the church remodel at 2403 Rayford Road cost?
The applicant's estimated cost for the project is $900,000.
What is the project number for the church remodel at 2403 Rayford Road?
The TDLR project number is TABS2026020361. The registration describes an interior remodel of the main church building and children's building.
What's being remodeled near Mavis Tire on Rayford Road?
Faith United Methodist Church, at 2403 Rayford Road, has a registered interior remodel of its existing main church building and children's building. The church is about 179 meters from Mavis Tire at 2301 Rayford Road.
Also being built nearby
All of 77386- 2331 Rayford Rd · Allstate Bk Real Estate Holdings, Ltd.Nov 12, 2024Burger king — renovation/alteration — upgrade to the burger king new style. replace the existing siding to nichiha panels on main entrance. repaint the existing stucco wall, updating the interior with a new layout without changing the building area. also, add another dt lane on the site · 126 m away
- 2306 Rayford Dr · Medical Village Of Cypress Creek, LPMar 4, 2025Stemlyft lease space buildout — renovation/alteration — lease space buildout - first gen · 146 m away
- 2301 Rayford RdOct 15, 2026Mavis tire - 2301 rayford rd, spring, tx 77386 — new construction — project involves the ground-up construction of a new retail facility designed to accommodate mavis tire shop · 179 m away
- 2115 Rayford Road · Roel HoldingsApr 16, 2025Bohemian bull - spring, tx — renovation/alteration — tenant build-out of an existing ±4,500sf space to include a ±1,200sf outdoor covered patio · 498 m away
- 2106 Rayford Rd · Lhb Spring, LLCJul 25, 2025Dollar tree deal 45651 — renovation/alteration — interior renovation - removing existing fixtures, partition walls and finishes. extend pre-sales partitions, build office, replace storefront doors nad exterior doors, install new finishes and led lighting. replace plumbing fixtures. 13,038 sq ft · 540 m away