groundranger
Recent · latest filing Dec 2025Commercial

1077 Cr 118

Round Rock, TX 78665 · Central Texas Refuse, LLC

Republic Services waste transfer station planned in Round Rock

A Republic Services waste transfer station is planned at 1077 CR 118 in Round Rock, with a 17,240-square-foot station and a 750-square-foot weigh station office. The project was registered with the Texas Department of Licensing and Regulation on December 17, 2025; the applicant's estimated project cost is $8.5 million.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 17, 2025

Projects
1
1 filings
Latest filing
Dec 17, 2025
since Dec 17, 2025
Largest scope
17,240 sf
Estimated cost
$8.5M
state registration

Where this project stands

Under construction

Republic Services Waste Transfer Station

17,240 sq ft · $8.5M est.

  1. RegisteredDec 17, 2025
  2. Plan review
  3. ConstructionMar '26 – Mar '27
  4. Inspected
  5. Closed
72% through of a 12-month buildMar 1, 2026 → Mar 1, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Will include a waste transfer station +/- 17,240 sq ft, a small weigh station office building 750 sq ft, utilities, paving, grading, detention pond, storm sewer system, etc.. — republic services waste transfer station

    TDLR project registrationNew ConstructionReview Complete17,240 sq ft$8.5M est.
    Tenant / owner
    Republic Services Waste Transfer Station
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1077 Cr 118

What is being built at 1077 CR 118 in Round Rock?

A Republic Services waste transfer station is planned, along with a small weigh station office, utilities, paving, grading, a detention pond and storm sewer system. The project is listed in TDLR registration TABS2026008306, filed December 17, 2025.

How big will the Republic Services waste transfer station be?

The registered project lists a waste transfer station of about 17,240 square feet and a 750-square-foot weigh station office.

When was the Round Rock waste transfer station project filed?

The project was registered with the Texas Department of Licensing and Regulation on December 17, 2025. Its TDLR status is Review Complete.

How much is the 1077 CR 118 project estimated to cost?

The applicant's estimated cost for the project is $8.5 million, according to the TDLR registration.

Is the project at 1077 CR 118 a new construction project?

Yes. TDLR lists the Republic Services Waste Transfer Station project as new construction.

More offices in 78665.

Email me when it passes inspection