2800 West 15th Street
Plano, TX 75075 · Bulk O2 System For Encompass Health Of Plano, Ehc Rehabilitation Hospital Of Plano Dumpster Enclosure
New bulk oxygen system planned at Encompass Health of Plano
A new 1,500-gallon bulk oxygen system is planned at Encompass Health Rehab Hospital of Plano, including a concrete equipment pad and underground piping to an existing manifold. The TDLR project registration was filed September 16, 2026, and lists an estimated project cost of $600,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2026
- since Sep 16, 2026
- Largest scope
- 10,000 sf
- Estimated cost
- $600K
- state registration
Where this project stands
Approved · construction starts Feb 1, 2027Bulk O2 System for Encompass Health of Plano
10,000 sq ft · $600K est.
- RegisteredSep 16, 2026
- Plan review
- ConstructionFeb '27 – May '27
- Inspected
- Closed
A 4-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInstallation of new 1500 gallon bulk oxygen system on new concrete equipment pad, including underground gas storage gas piping into existing manifold — encompass health rehab hospital of plano texas
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$600K est.- Project #
- TABS2027001192
- Tenant / owner
- Bulk O2 System For Encompass Health Of Plano
- Design firm
- Pro
- Contact
- Pro
Replacing existing dumpster enclosure with a new double container enclosure. — encompass health rehabilitation hospital of plano
TDLR project registrationRenovation/AlterationProject Closed350 sq ft$250K est.- Project #
- TABS2024003637
- Tenant / owner
- Ehc Rehabilitation Hospital Of Plano Dumpster Enclosure
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2800 West 15th Street
What is being built at 2800 West 15th Street in Plano?
A new 1,500-gallon bulk oxygen system is planned for Encompass Health Rehab Hospital of Plano. The scope includes a concrete equipment pad and underground gas piping to an existing manifold.
Is Encompass Health of Plano getting a new oxygen system?
Yes. A TDLR registration filed September 16, 2026, describes installation of a new bulk oxygen system at the hospital.
When was the bulk oxygen project at 2800 West 15th Street filed?
The TDLR project registration was filed September 16, 2026. The record lists its status as Review Complete.
How much will the Encompass Health oxygen system project cost?
The TDLR registration lists an applicant-estimated project cost of $600,000.
What's planned near Carter Kings Court on West 15th Street?
A new 1,500-gallon bulk oxygen system is planned at Encompass Health Rehab Hospital of Plano, about 32 meters from Carter Kings Court. The registration includes a concrete equipment pad and underground piping.
Is a new business opening at 2800 West 15th Street?
The TDLR record describes an oxygen system installation at Encompass Health Rehab Hospital of Plano, not a new business opening.
Also being built nearby
All of 75075- 2800 W 15th Street · Encompass Rehabilitation Hospital Of Plano Llc.Aug 6, 2024Encompass health plano — renovation/alteration — hvac support steel hvac mechanical change out
- 2819 W 15th Street · Mdt Plano LtdMay 28, 2026Carter kings court — renovation/alteration — interior renovation and tenant finish-out of existing retail space for basketball training facility, including restroom modifications, plumbing, electrical, accessibility, life safety, and interior improvements · 32 m away
- 2830 W 15th St · United City CenterMay 7, 2026Stoner's pizza plano — renovation/alteration — renovation finish out for a restaurant · 46 m away
- 2700 W. 15th Street · Plano ISDApr 23, 2024Plano admin building and compliance — renovation/alteration — renovation of ceilings, mep systems and small changes to walls in the office areas · 151 m away
- 1501 Independence Parkway · Samurai Solomon 2 LLCMay 5, 2026Murphy usa plano — new construction — gas station and convenience store · 180 m away
- 2967 W 15th St · Mdt Prairie Creek LtdMar 19, 2026Tenant improvement — renovation/alteration — the remodel of the existing interior layout, including existing conditions, items to be removed, and the proposed revised layout. the scope of work is limited to non-structural interior modifications intended to remodel the space to fit the new tenan · 267 m away
- 2991 W 15th St · Prairie Creek Estates Section IIJul 30, 2026Zenith tcg — renovation/alteration — interior finish out · 298 m away
- 1421 Gables Ct · Raymond J Adams Co.Mar 28, 2025Raymond j adams co. — new construction — office building (3,769 sq ft) and parking lot (10,700 sq ft) · 441 m away
- 1401 Highedge Drive · Plano ISDSep 20, 2024Pisd - w.a. vines hs renovation — renovation/alteration — security film at exterior glazing, security system, flooring finishes, new wall finishes for gym, athletic equipment, bleachers and toilet stall partitions, structural modifications for mech equipment, roof repair and new hvac controls and rtu's · 492 m away