1153 US-377 N/A
Pilot Point, TX 76208 · Bw Gas And Retail, LLC
Allsup's gas station renovation in Pilot Point
An existing Allsup's gas station at 1153 US-377 N is being renovated, with work limited to the sales floor, storefront and walk-in cooler. The project was registered with TDLR on May 14, 2026, and the existing building and site are to remain.
Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2026
- since May 14, 2026
- Largest scope
- 2,457 sf
- Estimated cost
- $200K
- state registration
Where this project stands
Inspected · closing outAllsups Gast Station Renovation
2,457 sq ft · $200K est.
- RegisteredMay 14, 2026
- Plan review
- ConstructionJun '26 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectExisting building and site to remain. scope of work is limited improvement of the interior sale floor area including flooring replacement and new paint; replacement of storefront; and replacement of walk-in cooler — allsups gas station
TDLR project registrationRenovation/AlterationInspection Complete2,457 sq ft$200K est.- Project #
- TABS2026020322
- Tenant / owner
- Allsups Gast Station Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1153 US-377 N/A
What is being built at 1153 US-377 N in Pilot Point?
The project is a renovation of an existing Allsup's gas station, not a new building. The TDLR registration says the existing building and site will remain.
What work is planned at the Allsup's gas station?
The scope includes replacing flooring and painting the interior sales floor, replacing the storefront, and replacing the walk-in cooler. The project covers 2,457 square feet.
When was the Allsup's renovation registered?
The TDLR project registration was filed May 14, 2026. Its project number is TABS2026020322.
How much will the Allsup's renovation cost?
The TDLR registration lists an estimated project cost of $200,000. This is the applicant's estimate.
Is the Allsup's renovation near La Crema House?
Yes. The project is at 1153 US-377 N, about 27 meters from La Crema House at 1137 US 377.
What is the status of the Allsup's gas station renovation?
The TDLR record lists the project status as Inspection Complete.
Also being built nearby
All of 76208- 1137 US 377 · La Crema HouseJan 26, 2026La crema house — renovation/alteration — interior renovation for restaurant · 27 m away
- 1301 US-377 · Four Horseman HotelApr 3, 2025Four horseman hotel - addition/remodel — renovation/alteration — four horseman hotel - main kitchen remodel of 534 sq ft with addtion of 202sqft, event hall remodel of 387 sq ft, and coffee shop remodel of 343 sq ft with addition of 78 sq ft · 249 m away
- 1013 US-377 · Palm And Banyan LLCAug 24, 2026Prevhealth primary care — renovation/alteration — provide ada compliant bathroom. finish out interior. rework electrical fixtures · 510 m away