5509 Champions Dr
Midland, TX 79706 · Eog Rockshop And Control Room, Eog Building 3
EOG office building and control-room remodel in Midland
TDLR registrations show an 85,092-square-foot office building and two elevated circulation bridges planned at this multi-tenant site, registered August 12, 2025. A separate registration dated October 26, 2026, describes a 2,400-square-foot interior remodel to expand an existing control room. The applicant's estimated cost for the office-building project is $33 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 26, 2026
- since Aug 12, 2025
- Largest scope
- 85,092 sf
- Estimated cost
- $33M
- state registration
Where this project stands
Approved · construction starts Feb 1, 2027EOG Rockshop and Control Room
2,400 sq ft · $1.4M est.
- RegisteredOct 26, 2026
- Plan review
- ConstructionFeb '27 – Apr '27
- Inspected
- Closed
A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThis is a 2,400 sq ft interior remodel of existing space for eog resources to expand the footprint of their current control room. — eog resources inc
TDLR project registrationRenovation/AlterationReview Complete2,400 sq ft$1.4M est.- Project #
- TABS2027004392
- Tenant / owner
- Eog Rockshop And Control Room
- Design firm
- Pro
- Contact
- Pro
This new construction project for eog resources inc. includes the addition of a new 85,092 sq ft office building and (2) elevated circulation bridges that connect this new building to the existing office buildings on site. — building 3
TDLR project registrationNew ConstructionReview Complete85,092 sq ft$33M est.- Project #
- TABS2025025715
- Tenant / owner
- Eog Building 3
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5509 Champions Dr
What is being built at 5509 Champions Dr in Midland?
A TDLR registration describes a new 85,092-square-foot office building and two elevated circulation bridges connecting it to existing office buildings. The project, named EOG Building 3, was registered August 12, 2025.
Is there also a remodel planned at 5509 Champions Dr?
Yes. A separate TDLR registration dated October 26, 2026, describes a 2,400-square-foot interior remodel to expand an existing control room.
How much will the EOG Building 3 project cost?
The applicant's estimated cost for EOG Building 3 is $33 million. This is an estimate for that project, not a confirmed final cost for the site.
How large is the new office building at 5509 Champions Dr?
The TDLR registration lists the EOG Building 3 office building at 85,092 square feet, plus two elevated circulation bridges.
What's being planned near The Aesthetics Bar Build-Out on Tradewinds Boulevard?
At 5509 Champions Dr, about 391 meters away, TDLR records describe an 85,092-square-foot office building and two elevated circulation bridges, registered August 12, 2025.
What is happening near Galliant Care in Midland?
At 5509 Champions Dr, about 446 meters from Galliant Care, TDLR records describe a new office building and a separate control-room remodel. Their registrations are dated August 12, 2025, and October 26, 2026, respectively.
Also being built nearby
All of 79706- 607 Tradewinds Blvd · Triple Healthcare Services LLCAug 28, 2026The aesthetics bar build-out — renovation/alteration — build-out (hvac, flooring, plumbing, lighting, framing, paiting, etc.) · 391 m away
- 707 Tradewinds Blvd · Tradewinds Units Blvd LLCJul 7, 2026Galliant care — renovation/alteration — 2 offices to have one wall removed each, 4 offices to have 5 walls removed to create 1 large work area · 446 m away
- 907 Tradewinds Blvd · Txct Investments, LLCApr 17, 2024Action behavior center midland — renovation/alteration — a 6,144 square-foot tenant improvement project in an existing suite for action behavior centers office and therapy clinic · 597 m away
More offices in 79706.