1575 Airport Blvd. Road
Mesquite, TX 75181 · Dg Mesquite III Property Owner LP
Mesquite industrial facility to be divided into 220,206-square-foot space
A demising wall will subdivide an existing 342,196-square-foot industrial facility at 1575 Airport Blvd. Road into a 220,206-square-foot space. The TDLR project registration, filed October 22, 2026, also lists 14 dock levelers and 10 high-volume, low-speed fans.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 22, 2026
- since Oct 22, 2026
- Largest scope
- 220,206 sf
- Estimated cost
- $600K
- state registration
Where this project stands
In state plan reviewMesquite Airport Logistics Center - Building 4 - Demising Wall
220,206 sq ft · $600K est.
- RegisteredOct 22, 2026
- Plan reviewnow
- ConstructionNov '26 – Dec '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstallation of 14 dock levelers, 10 hvls fans, and new demising wall to subdivide an existing 342,196 sq ft industrial facility in mesquite, tx into a 220,206 sq ft space. — mesquite airport logistics center - building 4
TDLR project registrationRenovation/AlterationProject Registered220,206 sq ft$600K est.- Project #
- TABS2027004201
- Tenant / owner
- Mesquite Airport Logistics Center - Building 4 - Demising Wall
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1575 Airport Blvd. Road
What is happening at 1575 Airport Blvd. Road in Mesquite?
A demising wall will divide the existing industrial facility into a 220,206-square-foot space. The registered work also includes 14 dock levelers and 10 fans.
Is a new industrial building being built at 1575 Airport Blvd. Road?
The TDLR description identifies this as a renovation or alteration to an existing 342,196-square-foot industrial facility, not a new building.
How large will the space at Mesquite Airport Logistics Center Building 4 be?
The TDLR registration describes a 220,206-square-foot space created by subdividing the existing facility.
What improvements are planned for Mesquite Airport Logistics Center Building 4?
The registered work includes a new demising wall, 14 dock levelers and 10 high-volume, low-speed fans.
When was the Mesquite Airport Logistics Center Building 4 project registered?
The TDLR project registration was filed October 22, 2026. Its project number is TABS2027004201.
What is the estimated cost of the work at 1575 Airport Blvd. Road?
The TDLR registration lists an estimated project cost of $600,000.
Also being built nearby
All of 75181- 1525 Airport Blvd · Dg Mesquite III Property Owner LLCJul 11, 2025Rwc texas — renovation/alteration — interior renovation · 52 m away
- 1755 Airport Blvd · Dalfen IndustrialJun 13, 2024Rjw tenant improvements — new construction — new tennant improvements of an existing office as well as a new shipping and receiving office. warehouse improvements included dock packages · 188 m away
- 1240 Airport Blvd · Marcus Air LLCApr 8, 2024Mesquite flying school — renovation/alteration — finish out of an existing space for use as a flying school. b occupancy · 388 m away