2117 S, 10th St
McAllen, TX 78577 · Ral Properties
2117 S 10th St renovation adds four rooms
A renovation at 2117 S 10th St is registered to remove a swimming pool and add four rooms, a new reception area and lighting. The TDLR filing was dated June 9, 2026, and lists 36,051 square feet with an applicant-estimated project cost of $750,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 9, 2026
- since Jun 9, 2026
- Largest scope
- 36,051 sf
- Estimated cost
- $750K
- state registration
Where this project stands
Under constructionFairfield To Spark Conversion
36,051 sq ft · $750K est.
- RegisteredJun 9, 2026
- Plan review
- ConstructionJul '26 – Jul '27
- Inspected
- Closed
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemove swimming pool, add 4 new rooms, new receptionist area and lighting. — fairfield inn and suites laredo
TDLR project registrationRenovation/AlterationReview Complete36,051 sq ft$750K est.- Project #
- TABS2026022351
- Tenant / owner
- Fairfield To Spark Conversion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2117 S, 10th St
What is being built at 2117 S 10th St in McAllen?
A TDLR registration describes a renovation that removes a swimming pool and adds four rooms, a new reception area and lighting.
When was the renovation at 2117 S 10th St filed?
The TDLR project registration, TABS2026022351, was dated June 9, 2026. Its status is listed as Review Complete.
How much will the 2117 S 10th St project cost?
The TDLR registration lists an applicant-estimated project cost of $750,000.
How large is the renovation at 2117 S 10th St?
The TDLR registration lists the project at 36,051 square feet.
Is construction planned near Starbucks at Macy's La Plaza?
The registered renovation is at 2117 S 10th St, about 24 meters from Starbucks at Macy's La Plaza at 2100 S 10th Street.
What work is included in the Fairfield To Spark Conversion?
The registration describes removing the swimming pool and adding four rooms, a new reception area and lighting.
Also being built nearby
All of 78577- 2131 S. Tenth St · Castillo DevelopmentMay 20, 2024Courtyard to fairfield inn & suites — renovation/alteration — dem interior finishes, and pool finishes and providing new finishes · 18 m away
- 2100 S. 10th StJan 30, 2025Macy's la plaza starbucks — renovation/alteration — new construction of a starbucks cafe in an existing macy's department store. work shall include demolition, new wall construction, casework, furniture, interior finishes, equipment and lighting · 24 m away
- 2100 S 10th Street · Macy's Inc.Jul 30, 2026Starbucks at macy's la plaza — renovation/alteration — interior improvements for a new starbucks cafe including mep. no exterior or structural scope · 24 m away
- 2200 S. 10th St · Dillard Texas South LLCMar 2, 2026Dillard's department store - 2026 cosmetics remodel — renovation/alteration — revised in-floor outlets in cosmetics area as required (3,485 square feet) · 106 m away
- 2200 S. 10 St. Spacea01b · Simon Property Group- La Plaza MallFeb 13, 2025Sephora remodel — renovation/alteration — remodel of an existing tenant space · 106 m away
- 2200 South 10th Street Mcallen, TX 78 · Simon Property GroupFeb 19, 2025Candeeland texas la plaza — additions to existing building — renovate existing space inside la plaza mall for indoor playground for children. (9,700 sq ft) · 106 m away
- 2200 S. Tenth St., F12 & F13 · La Plaza MallJun 25, 2024Miss a — renovation/alteration — interior finish out of a leased space · 106 m away
- 2200 South 10th St · Simon Property GroupMar 13, 2024Marc jacobs la plaza mall, tx — renovation/alteration — new partitions, finish ceiling, flooring, installation of new retail fixtures, interior finishes, lighting, misc. millwork and replacement of existing storefront finishes · 106 m away
- 2200 S. 10th St · Simon Property Group- (texas) LPMay 13, 2025Hollister — renovation/alteration — interior improvement of existing building, recolor to existing hollister, convert stockroom to new fitting room · 106 m away
- 2200 S. 10th St, Space G5 · Simon Property Group (texas), L.p.Oct 20, 2025Portillo jewelers cosmetic facelift for sales floor — renovation/alteration — 1,000 square feet will be resurfaced (new floor) and ceiling will be raised along with new light fixtures and new showcases as well as new reception desk and sit down counters for point of sale service to customers · 106 m away
- 2200 S. Tenth St. S · Simon Property Group- La Plaza MallMar 16, 2025Garage store — renovation/alteration — interior commercial renovation · 106 m away
- 2200 S.10th Street, Space#0q01g · Simon Propety Group Mcallen No 1Jun 20, 2025The baked bear-la plaza mall — new construction — interior finish out for a new business with prep area and restroom · 106 m away
More pools in 78577.