114 Sebastians Run
Lakeway, TX 78738
Backup battery system permitted at 114 Sebastians Run
A backup battery system and additional meter socket are being installed at the residential property at 114 Sebastians Run. A City of Austin electrical permit was filed on October 28, 2026, and is listed as active.
Summarized from City of Austin records · updated Oct 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2026
- since Oct 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj - base: installing a backup battery system and additional meter socket
- AppliedOct 15, 2026
- IssuedOct 28, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj - base: installing a backup battery system and additional meter socket
Etj - base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-136249 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 114 Sebastians Run
What is being installed at 114 Sebastians Run?
A City of Austin electrical permit describes installation of a backup battery system and an additional meter socket.
When was the permit for 114 Sebastians Run filed?
Permit 2026-136249 EP was filed on October 28, 2026, and is listed as active.
Is 114 Sebastians Run getting rooftop solar panels?
The permit for this address describes a backup battery system and an additional meter socket. It does not mention rooftop solar panels.
Is the work at 114 Sebastians Run for a home?
The record identifies the property as residential and describes electrical work to install a backup battery system and additional meter socket.
How much will the work at 114 Sebastians Run cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 78738- 128 Sebastians RunMay 20, 2026Install new 3.924 kw rooftop solar system for existing residential only · 170 m away
- 108 Hensley CirDec 27, 2023Replace 200a main breaker panel disconnect / reconnect · 187 m away
- 214 Vailco LnSep 5, 202413.53 kw dc roof mount solar system · 274 m away
- 121 Lakota PassOct 3, 2024Install 15.96 kw dc solar with 15.0 kwh ess · 345 m away
- 204 Vailco LnMar 19, 2024Request to disconnect connecting ess gateway. underground service. austin energy. meter can does not require replacement - no espa attached · 357 m away
- 211 Varco DrApr 17, 2025Installing 20.5kw solar system with 22.8kw ac fox-ess hybrid inverter with 39.7kwh of battery storage · 401 m away
- 150 Lakota PassMar 21, 2025Request to disconnect leave existing 200 and meter replace main panel with new 200 amp · 424 m away