705 Duck Lake Dr
Lakeway, TX 78734
Backup battery system permitted at 705 Duck Lake Dr
A permit indicates a backup battery system and additional meter socket are being installed at 705 Duck Lake Dr. The City of Austin electrical permit was filed on November 6, 2026, and is listed as active.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedOct 27, 2026
- IssuedNov 6, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-142075 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 705 Duck Lake Dr
What is being installed at 705 Duck Lake Dr?
A City of Austin electrical permit describes installation of a backup battery system and an additional meter socket.
When was the electrical permit filed for 705 Duck Lake Dr?
The permit was filed on November 6, 2026.
What is the permit number for work at 705 Duck Lake Dr?
The electrical permit number is 2026-142075 EP.
Is the permit for 705 Duck Lake Dr active?
Yes. The City of Austin lists permit 2026-142075 EP as active.
How much will the battery system at 705 Duck Lake Dr cost?
The permit record does not list a project valuation.
Also being built nearby
All of 78734- 1723 Lakeway BlvdAug 1, 2024Replace meter socket and exterior main panel · 302 m away
- 502 Duck Lake DrFeb 7, 2025Install new roof-mounted solar and energy storage system to existing single family residence. ae - underground · 337 m away
- 1906 Lakeway BlvdOct 15, 2024Request to disconnect - installation of 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type ii surge protection · 347 m away
- 101 Fenway CtJun 27, 2025Disconnect/reconnect replace 200a main panel and install 24kw generator · 366 m away
- 904 Palos Verdes DrAug 4, 2026Temp power pole · 371 m away
- 121 Clubhouse DrApr 6, 2026Permanent electrical service for new sfr in etj · 396 m away
- 121 Royal Oak LnApr 23, 2026Request to disconnect and reconnect. trutec will be replacing the sylvania panel in the garage we will be adding a enclosed breaker disconnect on the outside of the home and updating the meter can as well as adding surge protection and a new grounding system · 409 m away
- 101 Tamarac CtFeb 5, 2026Install new 18.705kw rooftop solar system for existing residential only · 451 m away
- 129 Golf Crest CvOct 9, 2025Remounting meter socket and main back on new exterior siding · 559 m away