1101 W Airport Freeway
Irving, TX 75062 · 7-Eleven INC
7-Eleven renovation registered at 1101 W Airport Freeway
A 3,100-square-foot renovation at 1101 W Airport Freeway was registered on September 14, 2026, under the project name 34236 7-Eleven Rev1. The scope includes interior remodeling, new equipment, restroom and cabinet work, exterior improvements, parking lot repairs, landscaping, and upgraded signage and lighting. The applicant's estimated project cost is $567,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2026
- since Sep 14, 2026
- Largest scope
- 3,100 sf
- Estimated cost
- $567K
- state registration
Where this project stands
In state plan review34236 7-Eleven Rev1
3,100 sq ft · $567K est.
- RegisteredSep 14, 2026
- Plan reviewnow
- ConstructionDec '26 – Jan '27
- Inspected
- Closed
Construction is scheduled to start Dec 11, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior remodel with some new equipment, remodeled restrooms, new décor, some new cabinets, enhanced building elevation and signage, clean exterior, repair parking lot, enhance landscaping, upgrade site signage and lighting — shell
TDLR project registrationRenovation/AlterationProject Registered3,100 sq ft$567K est.- Project #
- TABS2027001015
- Tenant / owner
- 34236 7-Eleven Rev1
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1101 W Airport Freeway
What is being built at 1101 W Airport Freeway?
A renovation is registered for the site under the name 34236 7-Eleven Rev1. The work includes interior remodeling and exterior and site improvements.
Is a new 7-Eleven being built in Irving?
The September 14, 2026, TDLR registration describes a renovation, not new construction. Its scope includes updated equipment, restrooms, décor, cabinets, signage, and lighting.
When was the 1101 W Airport Freeway project registered?
The project was registered on September 14, 2026. Its TDLR registration number is TABS2027001015.
How much will the 7-Eleven renovation cost?
The applicant estimates the project cost at $567,000. This is an estimate for the project, not a confirmed final cost.
What exterior work is planned at 1101 W Airport Freeway?
The registered scope includes an enhanced building elevation, upgraded site signage and lighting, parking lot repairs, landscaping, and exterior cleanup.
What's being renovated near the electric vehicle charging station on W Airport Freeway?
A 3,100-square-foot renovation is registered at 1101 W Airport Freeway, about 63 meters from the electric vehicle charging station at 1145 W Airport Freeway. The project includes interior remodeling and site improvements.
Also being built nearby
All of 75062- 1145 W Airport Fwy · Macarthur Center Irving LLCAug 10, 2026Electric vehicle charging station — new construction — new installation of electric vehicle charging stations in the exterior parking lot, including associated accessible parking spaces, access aisles, and accessible routes. approximately 2800 square feet of work area · 63 m away
- 1221 W Airport Fwy · Glen Una Management Company, Inc.Jun 11, 2024H&r block - dallas airport — renovation/alteration — interior tenant finish of 1800 sq ft demolition work includes demolition of existing partitions and casework. new work includes new partitions, new/relocated lighting, new/relocated mechanical devices, and new plumbing fixtures · 171 m away
- 1221 W Airport Freeway · Fiesta Center IrvingNov 12, 2024Speed queen irving laundromat — renovation/alteration — interior remodel · 171 m away
- 1025 W Airport Freeway · Taco Bell Of America LLCJun 26, 2025Taco bell airport — renovation/alteration — interior renovation of an existing taco bell. includes a new 250 sq ft beverage station with new equipment, fixtures, finishes and new front counter. other dining and restroom area updates are new furniture, new floor, wall finishes, ceiling, lighting · 192 m away
- 1000 W Airport Fwy · Irving Plaza LLCSep 3, 2026Irving plaza exterior renovation — renovation/alteration — project consists of exteriror renovation to the existing building at irving plaza. scope of work is limited to exterior improvements, including selective demolition of existing exterior wall for new storefront asystems. no interior work · 229 m away
- 2021 North Macarthur Blvd · Hrt Properties Of TX LtdOct 13, 2026Rcg irving, llc — renovation/alteration — renovation of an existing tenant space to provide a new 11,132 sq ft dialysis clinic · 337 m away
- 2021 N. Macarthur Blvd · Hrt Properties Of Texas, LtdJul 1, 2026Msci office space — renovation/alteration — interior office renovation · 337 m away
- 2021 N Macarthur · Hrt Properties Of TX LtdMar 3, 2026Hrt bswi mob expansion — additions to existing building — a 3330 sqf expansion to the bswi mob. the expansion is single story. the interior of the expansion is shell space for this project · 337 m away
- 2005 W Park Dr · Irving Hospital AuthorityAug 24, 2026Irving hospital authority mob 2nd floor spec suite — renovation/alteration — interior tenant improvement project consisting of 2371 s.f. on level 2 of existing business occupancy space · 373 m away
- 2005 West Park Drive · Irving Hospital AuthorityMar 3, 2025Irving mob 2nd floor — renovation/alteration — ti finish out of 5,300 sq ft · 373 m away
- 2001 N. Macarthur Blvd · Irving Hospital AuthorityMar 30, 2026Htpn - bsw surgical institute — renovation/alteration — interior medical office renovation · 393 m away
- 1415 W Airport Freeway · Envoy Holdings, LLCNov 4, 2025Envoy64 — new construction — site & publicly accessible spaces in clubhouse area of multifamily building · 417 m away