groundranger
Plat 2026-0475Water Treatment, Production or Repressurization

El Dorado Utility District Water Plant No 2

Houston · 77396 · Harris County

Replat filed for El Dorado Utility District Water Plant No. 2

A 0.699-acre Class 2 subdivision replat is proposed for a site designated for water treatment, production or repressurization in Harris County. The application, filed as 2026-0475, lists a planning commission date of April 16, 2026; it does not by itself confirm that construction is planned.

Lots
—
Acres
0.70
Next / last hearing
Apr 16, 2026
School district
Humble ISD

Application

TypeClass 2 subdivision replat (C2R)
DeveloperEl Dorado Utility District of Harris County Texas
Engineer / surveyorA & S Engineers
SubmittedApril 3, 2026

Planning Commission history

  1. April 16, 2026Listed

Questions about El Dorado Utility District Water Plant No 2

What is being built at El Dorado Utility District Water Plant No. 2?

The records show a Class 2 subdivision replat for a site designated for water treatment, production or repressurization. They do not confirm that a new facility is being built.

What does application 2026-0475 cover?

It is a Class 2 subdivision replat for El Dorado Utility District Water Plant No. 2, covering about 0.699 acres in Harris County.

When was the replat considered?

The planning record lists April 16, 2026, as the planning commission date. It does not provide a decision or current status.

Who is behind the El Dorado Utility District Water Plant No. 2 replat?

The developer listed in the record is El Dorado Utility District of Harris County Texas. A & S Engineers is listed as the engineer or surveyor.

Where is the El Dorado Utility District Water Plant No. 2 project?

The record places the site in Harris County, ZIP code 77396, and lists Humble ISD. It does not provide a street address.

Other plats in 77396

Commercial construction in 77396