groundranger
Active · latest filing Nov 2026Commercial

6720 Bertner Avenue

Houston, TX 77030 · Csh Bslmc Cath Labs 11(b13) Reno, Csh TX Bslmc Cath Labs 4 (a09) And 9 (e09) + 3 more

Cath lab renovations registered at Baylor St. Luke’s

Two cath lab renovation projects are registered at the multi-tenant medical site at 6720 Bertner Avenue. The work includes equipment swaps and updated finishes in existing labs; the registrations were filed January 26 and November 11, 2026.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 11, 2026

Projects
5
5 filings
Latest filing
Nov 11, 2026
since Sep 16, 2024
Largest scope
2,124 sf
Estimated cost
$2.0M
state registration

Where this project stands

In state plan review

CSH BSLMC CATH LABS 11(B13) RENO

710 sq ft · $1.0M est.

  1. RegisteredNov 11, 2026
  2. Plan reviewnow
  3. ConstructionDec '26 – May '27
  4. Inspected
  5. Closed

Construction is scheduled to start Dec 7, 2026. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 3 phone numbers

Permit & project history

5 projects
  1. Renovation of existing cath lab to include an equipment swap and updated finishes — baylor st. luke's medical center

    TDLR project registrationRenovation/AlterationProject Registered710 sq ft$1.0M est.
    Tenant / owner
    Csh Bslmc Cath Labs 11(b13) Reno
    Design firm
    Pro
    Contact
    Pro
  2. Renovation of existing cath labs to include an equipment swap and updated finishes — baylor st luke's medical center

    TDLR project registrationRenovation/AlterationReview Complete2,124 sq ft$2.0M est.
    Tenant / owner
    Csh TX Bslmc Cath Labs 4 (a09) And 9 (e09)
    Design firm
    Pro
    Contact
    Pro
  3. Medical equipment replacement to the hybrid or #11 (cvor) room. the project includes modifications to the existing room to accommodate the new equipment, which includes new finishes and infrastructure modifications. — csh - baylor st. luke's medical center

    TDLR project registrationRenovation/AlterationInspection Complete1,120 sq ft$1.5M est.
    Tenant / owner
    Bslmc Fy25 Med Eq Upgrades - Hybrid Or
    Design firm
    Pro
    Contact
    Pro
  4. The intent of the project is to renovate the existing nuclear medicine spet ct department on level 3. the work is to include a cosmetic refresh to the entire suite, installation of new spect equip within a newly enclosed room. — csh - baylor st. luke's medical center

    TDLR project registrationRenovation/AlterationProject Closed1,913 sq ft$1.0M est.
    Tenant / owner
    Bslmc Fy25 Med Eq Upgrades - Spect Ct
    Design firm
    Pro
    Contact
    Pro
  5. MRI#3 Replacement

    Medical equipment replacement and interior renovation of existing mri room #3 — csh - baylor st. luke's medical center

    TDLR project registrationRenovation/AlterationProject Closed550 sq ft$465K est.
    Tenant / owner
    Mri#3 Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 6720 Bertner Avenue

What is being built at 6720 Bertner Avenue?

Two existing cath labs are being renovated, with equipment swaps and updated finishes. The work is registered at the multi-tenant medical site associated with Baylor St. Luke’s Medical Center.

When were the cath lab projects filed?

The registrations were filed January 26, 2026, and November 11, 2026. They are TDLR project registrations TABS2026010819 and TABS2027005668.

Is a new hospital being built at 6720 Bertner Avenue?

The registrations describe renovations of existing cath labs, not a new hospital. The work includes equipment swaps and updated finishes.

What work is planned at Baylor St. Luke’s Medical Center?

The registered projects cover renovations to existing cath labs, including equipment swaps and updated finishes. One project covers labs 4 and 9, and the other covers lab 11.

What is being renovated near Houston Methodist Hospital on Bertner Avenue?

Two cath lab renovation projects are registered at 6720 Bertner Avenue, about 58 meters from Houston Methodist Hospital. The work involves existing labs, equipment swaps and updated finishes.

Are the projects at 6720 Bertner Avenue new construction?

No. The TDLR records classify both projects as renovation or alteration of existing cath labs.

Also being built nearby

All of 77030

More medical facilities in 77030.

Email me when plan review is complete