1400 Westherford Highway
Granbury, TX 76048 · Paducah Self Storage, LLC
Guardbox registers two storage buildings in Granbury
A Guardbox Storage expansion at 1400 Westherford Highway calls for two single-story climate-controlled buildings added to the existing facility. The project was registered with TDLR on September 23, 2026, and includes site utilities and paving.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2026
- since Sep 23, 2026
- Largest scope
- 33,136 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
In state plan reviewGuardbox Storage Expansion
33,136 sq ft · $2.3M est.
- RegisteredSep 23, 2026
- Plan reviewnow
- ConstructionJan '27 – Jan '28
- Inspected
- Closed
Construction is scheduled to start Jan 4, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project(2) single story climatized buildings added onto existing facility. sog foundation, metal studs, metal roof, and mep work. site to include utilities and paving. — guardbox storage
TDLR project registrationNew ConstructionProject Registered33,136 sq ft$2.3M est.- Project #
- TABS2027001752
- Tenant / owner
- Guardbox Storage Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1400 Westherford Highway
What is being built at 1400 Westherford Highway in Granbury?
The Guardbox Storage expansion includes two single-story climate-controlled buildings added to the existing facility. TDLR project registration TABS2027001752 was filed September 23, 2026.
How large is the Guardbox Storage expansion?
The registered project covers 33,136 square feet.
How much is the Guardbox Storage project expected to cost?
The TDLR registration lists an estimated project cost of $2.3 million. This is the applicant's estimate.
When was the Guardbox Storage expansion registered?
The project was registered with TDLR on September 23, 2026, under project number TABS2027001752.
What's being built near the Granbury VA Clinic on Weatherford Highway?
A Guardbox Storage expansion is planned about 453 meters from the Granbury VA Clinic at 1301 Weatherford Highway. The registration describes two single-story climate-controlled buildings added to an existing facility.
Does the Guardbox Storage expansion include site work?
Yes. The project description includes utilities and paving, along with foundation, metal framing, metal roofing, and mechanical, electrical, and plumbing work.