1025 W Loop 820 N
Fort Worth, TX 76108 · White Settlement ISD
Brewer High School HVAC replacement registered in Fort Worth
A partial HVAC replacement is planned at White Settlement ISD’s Brewer High School at 1025 W Loop 820 N in Fort Worth. The project was registered with the Texas Department of Licensing and Regulation on November 10, 2026, and calls for replacing geothermal heat pump air-conditioning units and adding two closed-circuit fluid cooler machines.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2026
- since Nov 10, 2026
- Largest scope
- 10,000 sf
- Estimated cost
- $5.2M
- state registration
Where this project stands
In state plan reviewWhite Settlement ISD Brewer High School Partial HVAC Replacement
10,000 sq ft · $5.2M est.
- RegisteredNov 10, 2026
- Plan reviewnow
- ConstructionMar '27 – Dec '27
- Inspected
- Closed
Construction is scheduled to start Mar 15, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectReplacement of geothermal heat pump air conditioning units and addition of two closed circuit fluid cooler machines for geothermal well field temperature management. — brewer high school
TDLR project registrationRenovation/AlterationProject Registered10,000 sq ft$5.2M est.- Project #
- TABS2027005577
- Tenant / owner
- White Settlement ISD Brewer High School Partial Hvac Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1025 W Loop 820 N
What is being built at 1025 W Loop 820 N in Fort Worth?
The project is a partial HVAC replacement at Brewer High School, including replacement geothermal heat pump air-conditioning units and two closed-circuit fluid cooler machines. It was registered on November 10, 2026, under TDLR number TABS2027005577.
Is a new school being built at Brewer High School?
The registration describes a renovation and alteration for partial HVAC replacement, not a new school building. The work includes equipment for the geothermal well field.
What HVAC work is planned at Brewer High School?
The project calls for replacing geothermal heat pump air-conditioning units and adding two closed-circuit fluid cooler machines to manage geothermal well field temperatures.
When was the Brewer High School HVAC project registered?
The Texas Department of Licensing and Regulation project registration is dated November 10, 2026. Its project number is TABS2027005577.
How much is the Brewer High School HVAC project expected to cost?
The TDLR registration lists an estimated project cost of $5.24 million. This is the applicant’s estimate for the project.
What is being renovated near West Loop Varsity Sports?
Brewer High School, at 1025 W Loop 820 N, has a registered partial HVAC replacement project. West Loop Varsity Sports is listed about 477 meters away.
Also being built nearby
All of 76108- 700 N Jim Wright Freeway · West Loop Bp, LLCMay 30, 2025Foundation dynamics — renovation/alteration — finishout of office and warehouse spaces · 477 m away
- 700 North Jim Wright Fwy · West Loop Bp LLCJul 28, 2026West loop varsity sports — renovation/alteration — tenant finish out of offices, restrooms & break room. new lighting and finishes · 477 m away