groundranger
Active · latest filing Oct 2026Commercial

8420 N Expressway 281

Edinburg, TX 78542 · Love's Travel Stops & Country Stores Inc.

Four EV charging stations planned at Love’s in Edinburg

A project at Love’s Travel Stop #284 includes four single electric vehicle charging stations, a power cabinet and 2,000-amp electrical switchgear. The TDLR project registration was filed October 22, 2026, and lists the review as complete. The applicant’s estimated project cost is $600,000.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 22, 2026

Projects
2
2 filings
Latest filing
Oct 22, 2026
since Oct 22, 2026
Largest scope
2,859 sf
Estimated cost
$3.0M
state registration

Where this project stands

Approved · construction starts Mar 1, 2027

Love's 284 EV Charging Station Edinburg, TX

2,859 sq ft · $600K est.

  1. RegisteredOct 22, 2026
  2. Plan review
  3. ConstructionMar '27 – Apr '27
  4. Inspected
  5. Closed

A 2-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Installation of four single electric vehicle charging stations, one power cabinet, one 2000a electrical switchgear. — loves travel stop #284

    TDLR project registrationRenovation/AlterationReview Complete2,859 sq ft$600K est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro
  2. Loves 284 Remodel

    702 sq ft addition with complete interior remodel — loves travel stop 284

    TDLR project registrationAdditions to Existing BuildingProject Closed7,660 sq ft$3.0M est.
    Tenant / owner
    Loves 284 Remodel
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 8420 N Expressway 281

What is being built at 8420 N Expressway 281 in Edinburg?

A TDLR project registration describes installation of four single EV charging stations, a power cabinet and electrical switchgear at Love’s Travel Stop #284. The registration, TABS2027004178, was filed October 22, 2026.

Is Love’s adding EV chargers in Edinburg?

A project registered for Love’s Travel Stop #284 lists four single electric vehicle charging stations. The TDLR registration was filed October 22, 2026.

How many EV charging stations are planned at Love’s Travel Stop #284?

The project registration lists four single electric vehicle charging stations, along with a power cabinet and 2,000-amp electrical switchgear.

What is the status of the EV charging project at 8420 N Expressway 281?

The TDLR registration lists the project status as “Review Complete.” It was filed October 22, 2026, under project number TABS2027004178.

How much will the Love’s EV charging project in Edinburg cost?

The applicant’s estimated cost for the project is $600,000, according to the TDLR registration filed October 22, 2026.

When were the EV chargers at Love’s in Edinburg permitted?

The available record is a TDLR project registration filed October 22, 2026. It describes the charging-station installation at Love’s Travel Stop #284.

Email me when construction starts