1639 W 23rd Street
Dfw Airport, TX 75261 · Prologis Tilt Wall Panel Strengthe, 23023 - Cargo Center 1 Ti - #400
DFW Cargo Center 1 gets panel and elevator work
Two projects are registered for the multi-tenant DFW Cargo Center 1 at 1639 W 23rd Street: structural reinforcement of tilt panels and modifications to an elevator and equipment in suite 400. TDLR records show the suite work was filed September 24, 2026, and the panel project was registered September 30, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 30, 2026
- since Sep 24, 2026
- Largest scope
- 100,000 sf
- Estimated cost
- $437K
- state registration
Where this project stands
In state plan reviewPrologis Tilt Wall Panel Strengthe
100,000 sq ft · $437K est.
- RegisteredSep 30, 2026
- Plan reviewnow
- ConstructionOct '26 – Dec '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsStrengthening of tilt panels with structural reinforcement — dfw cargo center 1
TDLR project registrationRenovation/AlterationProject Registered100,000 sq ft$437K est.- Project #
- TABS2027002413
- Tenant / owner
- Prologis Tilt Wall Panel Strengthe
- Design firm
- Pro
- Contact
- Pro
The project consists of modifications to the existing elevator and equipment inside the existing cargo center 1 shell building suite #400 at dfw airport. — 23023 - cargo center 1 ti - #400
TDLR project registrationNew ConstructionReview Complete4,136 sq ft$123K est.- Project #
- TABS2027001842
- Tenant / owner
- 23023 - Cargo Center 1 Ti - #400
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1639 W 23rd Street
What is being built at 1639 W 23rd Street?
TDLR records describe work at the multi-tenant DFW Cargo Center 1: tilt-panel structural reinforcement, plus elevator and equipment modifications in suite 400. The records do not describe a new tenant.
What is happening at DFW Cargo Center 1?
Two projects are listed: reinforcement of the cargo center's tilt panels and modifications to an existing elevator and equipment in suite 400. The suite project was filed September 24, 2026, and the panel project was registered September 30, 2026.
Is a new cargo center being built at 1639 W 23rd Street?
The records describe work at an existing cargo center, including panel reinforcement and modifications inside its existing shell building. They do not indicate that a new cargo center is being built.
What work is planned for suite 400 at DFW Cargo Center 1?
A TDLR registration describes modifications to the existing elevator and equipment inside suite 400. The project is 4,136 square feet and was filed September 24, 2026 under record TABS2027001842.
Why are the tilt panels at DFW Cargo Center 1 being reinforced?
The TDLR description says the project involves strengthening tilt panels with structural reinforcement. It does not state the reason for the work.
How much will the DFW Cargo Center 1 projects cost?
The TDLR record for the 100,000-square-foot tilt-panel project lists an estimated cost of $437,000. That is an applicant estimate for that project, not a total cost for all work at the address.
Also being built nearby
All of 75261- 1639 W 23rd St · Prologis LPFeb 5, 2025Cargo center 1 ti - elevator modifications — new construction — the project consists of modifications to the existing elevator equipment and control room inside the existing dfw cargo center 1 shell building
- 1640 W 23rd St · Prologis LPJun 25, 2025Cc #2 ti – elevator modification — new construction — the project consists of modifications to the existing elevator and equipment inside the existing cargo center 2 shell building at dfw airport · 17 m away