DFW Cargo Center 1 gets panel and elevator work

Two projects are registered for the multi-tenant DFW Cargo Center 1 at 1639 W 23rd Street: structural reinforcement of tilt panels and modifications to an elevator and equipment in suite 400. TDLR records show the suite work was filed September 24, 2026, and the panel project was registered September 30, 2026.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 30, 2026

Projects
2
2 filings
Latest filing
Sep 30, 2026
since Sep 24, 2026
Largest scope
100,000 sf
Estimated cost
$437K
state registration

Where this project stands

In state plan review

Prologis Tilt Wall Panel Strengthe

100,000 sq ft · $437K est.

  1. RegisteredSep 30, 2026
  2. Plan reviewnow
  3. ConstructionOct '26 – Dec '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Strengthening of tilt panels with structural reinforcement — dfw cargo center 1

    TDLR project registrationRenovation/AlterationProject Registered100,000 sq ft$437K est.
    Tenant / owner
    Prologis Tilt Wall Panel Strengthe
    Design firm
    Pro
    Contact
    Pro
  2. The project consists of modifications to the existing elevator and equipment inside the existing cargo center 1 shell building suite #400 at dfw airport. — 23023 - cargo center 1 ti - #400

    TDLR project registrationNew ConstructionReview Complete4,136 sq ft$123K est.
    Tenant / owner
    23023 - Cargo Center 1 Ti - #400
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1639 W 23rd Street

What is being built at 1639 W 23rd Street?

TDLR records describe work at the multi-tenant DFW Cargo Center 1: tilt-panel structural reinforcement, plus elevator and equipment modifications in suite 400. The records do not describe a new tenant.

What is happening at DFW Cargo Center 1?

Two projects are listed: reinforcement of the cargo center's tilt panels and modifications to an existing elevator and equipment in suite 400. The suite project was filed September 24, 2026, and the panel project was registered September 30, 2026.

Is a new cargo center being built at 1639 W 23rd Street?

The records describe work at an existing cargo center, including panel reinforcement and modifications inside its existing shell building. They do not indicate that a new cargo center is being built.

What work is planned for suite 400 at DFW Cargo Center 1?

A TDLR registration describes modifications to the existing elevator and equipment inside suite 400. The project is 4,136 square feet and was filed September 24, 2026 under record TABS2027001842.

Why are the tilt panels at DFW Cargo Center 1 being reinforced?

The TDLR description says the project involves strengthening tilt panels with structural reinforcement. It does not state the reason for the work.

How much will the DFW Cargo Center 1 projects cost?

The TDLR record for the 100,000-square-foot tilt-panel project lists an estimated cost of $437,000. That is an applicant estimate for that project, not a total cost for all work at the address.

Also being built nearby

All of 75261
Email me when plan review is complete