groundranger
Active · latest filing Nov 2026Commercial

10455 N Central Expy

Dallas, TX 75231

Retail suite work includes a 24-hour ATM vestibule

City of Dallas permits show interior work in retail suites at 10455 N Central Expy, including a fit-out for a walk-up ATM and 24-hour vestibule permitted Nov. 9, 2026. That permit says the building footprint will not change. Other permits filed between November 2025 and November 2026 describe retail remodels, a salon finish-out and building-system work.

Summarized from City of Dallas records · updated Nov 13, 2026

Projects
11
11 filings
Latest filing
Nov 13, 2026
since Nov 13, 2026
Largest scope
—
Listed value
—

Permit & project history

11 projects
  1. Service change

    Service change

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005482
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. The project scope consists in an interior fit out of a tenant suite. the intent is to provide a through the wall walk-up atm with a 24 hr vestibule. the interior of the suite will include a 24 hr vestibule, the atm equipment room and the rest of the suite will remain unused space.mcr the access to the suite will be through the main entry door and access to the atm room will be by the bank'smaintenance/ vendor team when atm service is required.there will be no change to the building footprint

    The project scope consists in an interior fit out of a tenant suite. the intent is to provide a through the wall walk-up atm with a 24 hr vestibule. the interior of the suite will include a 24 hr vestibule, the atm equipment room and the rest of the suite will remain unused space.mcr the access to the suite will be through the main entry door and access to the atm room will be by the bank'smaintenance/ vendor team when atm service is required.there will be no change to the building footprint

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002729
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Commercial remodel and tenant improvement of existing retail space

    Commercial remodel and tenant improvement of existing retail space

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-004243
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Commercial retail remodel. tenant finish

    Commercial retail remodel. tenant finish

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-004242
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Diffusers, rtu start up, controls

    Diffusers, rtu start up, controls

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-002206
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Medplumb llc will supply and install the following plumbing fixtures and equipment as a finish-out / trim phase only:supply and install: - (1) mop sink- (1) hi / low electric water cooler with bottle filler- (1) hand sink - (1) - urinal with flush valve - (3) water closets - (2) wall-hung lavatory sinks - (1) 120-gallon water heaters (including circulating pump and main line thermostatic mixing valve)install only (customer-supplied): - (1) tankless water heater - (4) hand sinks - (42) spa sinks with shampoo bowls (all cabinetry built by others) - perform system flushing, testing, hot water temperature balancing at the main thermostatic mixing valve, and verification at fixtures.- provide final cleanup of work areas and participate in final walkthrough/punch list

    Medplumb llc will supply and install the following plumbing fixtures and equipment as a finish-out / trim phase only:supply and install: - (1) mop sink- (1) hi / low electric water cooler with bottle filler- (1) hand sink - (1) - urinal with flush valve - (3) water closets - (2) wall-hung lavatory sinks - (1) 120-gallon water heaters (including circulating pump and main line thermostatic mixing valve)install only (customer-supplied): - (1) tankless water heater - (4) hand sinks - (42) spa sinks with shampoo bowls (all cabinetry built by others) - perform system flushing, testing, hot water temperature balancing at the main thermostatic mixing valve, and verification at fixtures.- provide final cleanup of work areas and participate in final walkthrough/punch list

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-002418
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Install and set 3 rtus, install ductwork, install 4 exhasut fans, grilles, install condensate drains, and insulate

    Install and set 3 rtus, install ductwork, install 4 exhasut fans, grilles, install condensate drains, and insulate

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000810
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. New tenant electrical remodel

    New tenant electrical remodel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000079
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Qteam qr commercial remodel for salon finish out / mep upgrades

    Qteam qr commercial remodel for salon finish out / mep upgrades

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001813
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Replace old panel for new panel (200amp, 3p, 42-spaces, 240/120v)

    Replace old panel for new panel (200amp, 3p, 42-spaces, 240/120v)

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002933
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Replace old panel for new panel

    Replace old panel for new panel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003073
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 10455 N Central Expy

What is being built at 10455 N Central Expy?

A Nov. 9, 2026 permit describes an interior fit-out for a walk-up ATM and 24-hour vestibule in a tenant suite. Other permits at the address cover retail remodels and building-system work.

Is a new building being built at 10455 N Central Expy?

The ATM fit-out permit says there will be no change to the building footprint. The listed work is primarily interior remodeling and tenant improvements.

Will the ATM be open 24 hours?

The Nov. 9, 2026 permit describes a 24-hour vestibule for a through-the-wall walk-up ATM. It does not identify the bank or give an opening date.

What business is moving into 10455 N Central Expy?

The available permits do not name a business moving in. One permit describes an ATM fit-out, and a Dec. 22, 2025 permit describes a salon finish-out.

Is a salon planned at 10455 N Central Expy?

A Dec. 22, 2025 City of Dallas permit describes a commercial remodel for a salon finish-out and mechanical, electrical and plumbing upgrades. The record does not name the salon.

When were permits filed for work at 10455 N Central Expy?

The records span Nov. 10, 2025, through Nov. 13, 2026. The latest listed permit, COM-ELC-26-005482, was filed Nov. 13, 2026, for an electrical service change.

Also being built nearby

All of 75231
Get alerts for 10455 N Central Expy