10325 N Central Expy
Dallas, TX 75230
Hotel room renovations and rooftop solar at 10325 N Central Expy
City of Dallas permits indicate interior renovations to guest rooms and the lobby of an existing six-story hotel at 10325 N Central Expy. Permits filed April 13 and May 15, 2026, describe work on guest rooms on floors 1 through 6 and lobby areas, including new shower pans and replacement finishes. A separate permit filed November 5, 2026, covers rooftop solar panels on the existing commercial building.
Summarized from City of Dallas records · updated Nov 5, 2026
- Projects
- 22
- 22 filings
- Latest filing
- Nov 5, 2026
- since Dec 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
22 projectsInspecting the project to confirm any work done will be done correctly. the work will be inspected, estimated, and completed by mize man electrical
Inspecting the project to confirm any work done will be done correctly. the work will be inspected, estimated, and completed by mize man electrical
City of Dallas permitCommercial Electrical PermitPlease see revised/ updated scope of work (notarized) in documents interior remodel of existing hotel guest rooms on floor 1 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout. please see revised/ updated scope of work (notarized) in documents
Please see revised/ updated scope of work (notarized) in documents interior remodel of existing hotel guest rooms on floor 1 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout. please see revised/ updated scope of work (notarized) in documents
City of Dallas permitCommercial Alteration Addition PermitMcr interior alteration of existing hotel guest rooms on floor 3 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Mcr interior alteration of existing hotel guest rooms on floor 3 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitMcr interior alteration of existing hotel guest rooms on floor 6 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Mcr interior alteration of existing hotel guest rooms on floor 6 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitMcr interior alteration of existing hotel guest rooms on floor 5 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Mcr interior alteration of existing hotel guest rooms on floor 5 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitMcr interior alteration of existing hotel guest rooms on floor 4 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Mcr interior alteration of existing hotel guest rooms on floor 4 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitMcr nterior alteration of existing hotel guest rooms on floor 2 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Mcr nterior alteration of existing hotel guest rooms on floor 2 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior alteration of existing hotel guest rooms on floor 4 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Qteam interior alteration of existing hotel guest rooms on floor 4 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior alteration of existing hotel guest rooms on floor 2 as part of a phased renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Qteam interior alteration of existing hotel guest rooms on floor 2 as part of a phased renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior alteration of existing hotel guest rooms on floor 3 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Qteam interior alteration of existing hotel guest rooms on floor 3 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior remodel of existing hotel guest rooms on floor 1 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout
Qteam interior remodel of existing hotel guest rooms on floor 1 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior alteration of existing hotel guest rooms on floor 6 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
Qteam interior alteration of existing hotel guest rooms on floor 6 as part of a renovation of floors 2–6 at an existing 6-story, r-1 occupancy hotel.scope of work includes:installation of new shower pans within existing guest room bathrooms at existing plumbing locationsminor adjustment of existing vanity lighting location within the same wall to align with updated mirror installationextension of power from existing electrical receptacle to accommodate new wall-mounted television locationreplacement of existing switches and cover platesminor framing repairs performed in-kind to match existing constructionreplacement of finishes and fixtures within guest rooms.no changes to building footprint, structural system, occupancy classification, or means of egress.no changes to electrical service or plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitInterior remodel of existing hotel guest rooms on floor 1-6 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout
Interior remodel of existing hotel guest rooms on floor 1-6 and lobby area at an existing 6-story, r-1 occupancy hotel.scope of work includes:* installation of new shower pans within existing guest room bathrooms at existing plumbing locations* minor adjustment of existing vanity lighting within the same wall to align with updated mirror installation* extension of power from existing electrical receptacles to accommodate updated wall-mounted television locations* replacement of existing switches and cover plates.* reconfiguration of select first floor areas to accommodate guest laundry and storage functions within existing spaces utilizing existing plumbing and building systems* minor partition modifications and installation of doors within existing kitchen area* ceiling adjustments and minor framing modifications performed in-kind to match existing construction* replacement of finishes and fixtures throughout guest rooms and lobby areasno changes to building footprint, structural system, occupancy classification, or means of egress.?no changes to electrical service or overall plumbing system layout
City of Dallas permitCommercial Alteration Addition PermitQteam interior remodel of the first floor of an existing 6-story hotel due to prior water damage and mitigation. scope includes replacement of damaged gypsum board, finishes, lighting fixtures, and electrical devices in kind. electrical work consists of replacement of existing devices and lighting with similar configuration. plumbing work consists of repair and replacement of damaged fixtures and piping serving the first floor. no structural modifications, no change in occupancy, and no change in building footprint
Qteam interior remodel of the first floor of an existing 6-story hotel due to prior water damage and mitigation. scope includes replacement of damaged gypsum board, finishes, lighting fixtures, and electrical devices in kind. electrical work consists of replacement of existing devices and lighting with similar configuration. plumbing work consists of repair and replacement of damaged fixtures and piping serving the first floor. no structural modifications, no change in occupancy, and no change in building footprint
City of Dallas permitCommercial Alteration Addition PermitMcr lobby remodel- removing bay windows from south side lobby and making store front at existing location. removing bay windows on north side and installing store front on outer pillars under current roofing structure
Mcr lobby remodel- removing bay windows from south side lobby and making store front at existing location. removing bay windows on north side and installing store front on outer pillars under current roofing structure
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 10325 N Central Expy
What is being built at 10325 N Central Expy in Dallas?
Permits indicate renovations to guest rooms and lobby areas in an existing six-story hotel, plus rooftop solar panels. They do not describe a new building.
Is a new hotel being built at 10325 N Central Expy?
The permits describe work at an existing six-story hotel, with no changes to its footprint or occupancy classification. The records do not indicate a new hotel is being built.
What hotel renovation work is permitted at 10325 N Central Expy?
Permits include new shower pans, updated finishes and fixtures, and adjustments to lighting and power in guest rooms. A May 15, 2026, permit also describes work in the lobby and first-floor areas.
Which hotel floors are being renovated at 10325 N Central Expy?
Permits filed April 13, 2026, cover guest rooms on floors 2 through 6. A May 15, 2026, permit describes guest-room and lobby work on the first floor.
Are solar panels being installed at 10325 N Central Expy?
Yes. City of Dallas permit COM-ELC-26-005456, filed November 5, 2026, describes rooftop solar panels on the existing commercial building.
When were the hotel renovation permits filed for 10325 N Central Expy?
Several room renovation permits were filed April 13, 2026, including COM-ALT-ADD-26-000872 through COM-ALT-ADD-26-000876. A separate permit for first-floor and lobby work was filed May 15, 2026.
Also being built nearby
All of 75230- 10325 N Central Expressway 10325 N Central Expressway · Trafalgar Square Hospitality LLCSep 15, 2026Dallas courtyard renovation — renovation/alteration — lobby and guest amenity spaces renovation and interior finishes upgrades
- 10260 N Central ExpyMay 14, 2026Install lav sink and washer box · 88 m away
- 10300 N Central Expy · Meadow CentralJul 30, 2026Replace the backflow on the potable on the water line in mechanical room · 92 m away
- 10210 N Central ExpyMar 5, 2026Mcr demolition of one wall 4'8" long to ceiliing, construction of one temporary wall for future expansion 5'4" long to ceiling · 118 m away
- 10350 N Central ExpyJul 22, 2026Commercial fence with gated access surrounding the conjoining properties of 10350 and 10370 n central expy · 129 m away
- 10370 N Central ExpyOct 10, 2025Scheduled maintenance on main (2500 amp 120/208) service equipment · 148 m away
- 10232 Regal Oaks DrNov 5, 2020Remodel existing plumbing · 159 m away
- 10238 Regal Oaks DrDec 16, 2025Existing location · 161 m away
- 10252 Regal Oaks DrJun 25, 2026Replacing 2.5 on air handler with condneser · 168 m away
- 10100 Regal Park LnJun 2, 2026It is recommended at the home to install 5 remedial piers and reshim throughout the units shown on the plan view · 178 m away
- 7818 Meadow Park DrNov 6, 2025Replace (1) 1200amp and (1) 1600amp main fpe switchgears · 183 m away
- 7816 Meadow Park DrJun 2, 2026It is recommended at the home to reshim throughout the unit as shown on the plan view · 190 m away
More hotels in 75230, warehouses & industrial in 75230, restaurants in 75230.