8687 N Central Expy
Dallas, TX 75225 · Luca Faloni Tenant Improvement, Swarovski- Northpark Center + 7 more
Retail tenant renovations and build-outs at NorthPark Center
Interior retail tenant work is underway at NorthPark Center, a multi-tenant mall at 8687 N Central Expy. City permits dated November 13–18, 2026, cover tenant improvements, including a 1,190-square-foot retail space and a 2,002-square-foot Luca Faloni store build-out. The Luca Faloni project also has a TDLR registration with an applicant-estimated cost of $1.5 million.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 18, 2026
- Projects
- 213
- 213 filings
- Latest filing
- Nov 18, 2026
- since Nov 13, 2026
- Largest scope
- —
- Estimated cost
- $1.5M
- state registration
Permit & project history
213 projectsMcr tenant improvement of an existing 1190 square foot (gross area) retail space within the northpark center shopping mall. work includes soft interior demolition of the existing tenant space, new partition walls, finishes, fixtures, furniture. mechanical, electrical, plumbing and structural coordination. tenant is interior facing within (inside) the northpark center shopping mall. no change in use, no change in building area, no exterior/site work, and no change to existing shopping mall parking
Mcr tenant improvement of an existing 1190 square foot (gross area) retail space within the northpark center shopping mall. work includes soft interior demolition of the existing tenant space, new partition walls, finishes, fixtures, furniture. mechanical, electrical, plumbing and structural coordination. tenant is interior facing within (inside) the northpark center shopping mall. no change in use, no change in building area, no exterior/site work, and no change to existing shopping mall parking
City of Dallas permitCommercial Alteration Addition Permit2,002 sq ft interior tenant finish out for a luca faloni retail store. existing condition is a cold dark shell
2,002 sq ft interior tenant finish out for a luca faloni retail store. existing condition is a cold dark shell
City of Dallas permitCommercial Alteration Addition PermitTenant improvement pf an existing tenant space on the second level of an enclosed mall for use as an active wear and shore store
Tenant improvement pf an existing tenant space on the second level of an enclosed mall for use as an active wear and shore store
City of Dallas permitCommercial Alteration Addition Permit2,002 sq ft interior tenant finish out for a luca faloni retail store. existing condition is a cold dark shell. — northpark center
TDLR project registrationRenovation/AlterationReview Complete2,002 sq ft$1.5M est.- Project #
- TABS2027004110
- Tenant / owner
- Luca Faloni Tenant Improvement
- Design firm
- Pro
- Contact
- Pro
Improvement of of tenant spacing install lights switches outlets panels and service to remain as existing
Improvement of of tenant spacing install lights switches outlets panels and service to remain as existing
City of Dallas permitCommercial Electrical PermitProviding labor, materials, and fixtures on plumbing pages p-000, p-001, p-100, p-200, p-400. sanitary line to be pvc, vents to be cast iron, condensate line to be copper with armaflex, and domestic water to be copper with fiberglass insulation. fixtures provided: ms-1, ps-1, iwh-1, iwh-2, iwh-3
Providing labor, materials, and fixtures on plumbing pages p-000, p-001, p-100, p-200, p-400. sanitary line to be pvc, vents to be cast iron, condensate line to be copper with armaflex, and domestic water to be copper with fiberglass insulation. fixtures provided: ms-1, ps-1, iwh-1, iwh-2, iwh-3
City of Dallas permitCommercial Plumbing PermitInterior commercial tenant improvement of an existing retail space. no change in building area, no exterior work and no structural work. — northpark center
TDLR project registrationRenovation/AlterationProject Registered1,190 sq ft$300K est.- Project #
- TABS2027002640
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
- replace 2 already existing 3- ton heat pump rtus. with new roof curbs per the site roof curb requirements- connect new 110 cfm exhaust air device to central toilet exhaust system- full duct work revork from the plenums for return and supply (spiral duct)- front of store will have linear slot fixtures for supply and return- back of store will be open conditioned air-air balance for test and balance report
- replace 2 already existing 3- ton heat pump rtus. with new roof curbs per the site roof curb requirements- connect new 110 cfm exhaust air device to central toilet exhaust system- full duct work revork from the plenums for return and supply (spiral duct)- front of store will have linear slot fixtures for supply and return- back of store will be open conditioned air-air balance for test and balance report
City of Dallas permitCommercial Mechanical PermitProvide and install new rtu per plans. provide and install all associated duct work. provide and install exhaust fans, thermostats, hvac controls
Provide and install new rtu per plans. provide and install all associated duct work. provide and install exhaust fans, thermostats, hvac controls
City of Dallas permitCommercial Mechanical PermitInstall landlord provided hvac equipment. provide and install ductwork, exhaust fans, air devices, thermostats, hvac controls etc. complete all mechanical work per plans
Install landlord provided hvac equipment. provide and install ductwork, exhaust fans, air devices, thermostats, hvac controls etc. complete all mechanical work per plans
City of Dallas permitCommercial Mechanical PermitInstall 2 rtu per plans. provide and install all associated ductwork. provide and install exhaust fans, thermostats, hvac controls
Install 2 rtu per plans. provide and install all associated ductwork. provide and install exhaust fans, thermostats, hvac controls
City of Dallas permitCommercial Mechanical PermitBuild-out of an existing retail space on ground floor of a 2-story interior mall -approximately 610 sq ft new ceiling and light fixtures to be installed throughout
Build-out of an existing retail space on ground floor of a 2-story interior mall -approximately 610 sq ft new ceiling and light fixtures to be installed throughout
City of Dallas permitCommercial Electrical PermitBuild-out of an exisiting retail space on ground floor of an 2-story interior mall approximately 610 s.f. new ceiling and light fixtures to be installed throughout
Build-out of an exisiting retail space on ground floor of an 2-story interior mall approximately 610 s.f. new ceiling and light fixtures to be installed throughout
City of Dallas permitCommercial Electrical PermitRetail tenant finish out. new plumbing sewer & water for the following fixtures: (1) lav, (1) floor drain, (1) water closet, (1) mop sink & (1) water heater
Retail tenant finish out. new plumbing sewer & water for the following fixtures: (1) lav, (1) floor drain, (1) water closet, (1) mop sink & (1) water heater
City of Dallas permitCommercial Plumbing PermitBuild-out of an existing retail space on ground floor of a 2-story interior mall – approximately 610 sfkiehl’s northpark center
Build-out of an existing retail space on ground floor of a 2-story interior mall – approximately 610 sfkiehl’s northpark center
City of Dallas permitCommercial Alteration Addition PermitExpediated permit requested (express or q-team - whichever is faster?). this is for a tenant improvement on an existing commercial space: 8687 north central expressway, suite #1332, dallas, tx, 75225. proposed scope of new tenant improvement work (tiw) for suite 1332 includes new retail storefront, new partitions, finishes, fixtures, furnishings, interior doors, millwork, equipments and mep/fls systems
Expediated permit requested (express or q-team - whichever is faster?). this is for a tenant improvement on an existing commercial space: 8687 north central expressway, suite #1332, dallas, tx, 75225. proposed scope of new tenant improvement work (tiw) for suite 1332 includes new retail storefront, new partitions, finishes, fixtures, furnishings, interior doors, millwork, equipments and mep/fls systems
City of Dallas permitCommercial Alteration Addition PermitRemodel existing plumbing:providing labor, materials, and fixtures on plumbing pages p0.0, p1.0, p2.0. sanitary line to be pvc, vents to be cast iron, condensate to be copper with armaflex insulation, and domestic water to be copper with fiberglass insulation
Remodel existing plumbing:providing labor, materials, and fixtures on plumbing pages p0.0, p1.0, p2.0. sanitary line to be pvc, vents to be cast iron, condensate to be copper with armaflex insulation, and domestic water to be copper with fiberglass insulation
City of Dallas permitCommercial Plumbing PermitA 1,488-square-foot frozen yogurt shop located as an interior tenant space within northpark center. the shop includes a self-service frozen yogurt area, a toppings bar, customer seating, point-of-sale checkout/service counter, and limited retail merchandising. the space is designed for the preparation, service, and sale of frozen yogurt and related toppings, with customer circulation, seating, and checkout functions contained within the leased tenant area
A 1,488-square-foot frozen yogurt shop located as an interior tenant space within northpark center. the shop includes a self-service frozen yogurt area, a toppings bar, customer seating, point-of-sale checkout/service counter, and limited retail merchandising. the space is designed for the preparation, service, and sale of frozen yogurt and related toppings, with customer circulation, seating, and checkout functions contained within the leased tenant area
City of Dallas permitCommercial Alteration Addition Permit
+ 173 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 8687 N Central Expy
What is being built at 8687 N Central Expy?
Recent permits indicate interior retail tenant build-outs and renovations at NorthPark Center, rather than a new standalone building. The mall is a multi-tenant site.
What work was permitted at NorthPark Center in November 2026?
A November 18 city permit, COM-ALT-ADD-26-002720, describes improvements to an existing 1,190-square-foot retail space, including demolition, new partitions, finishes and fixtures. A November 16 permit, COM-ALT-ADD-26-002665, covers a 2,002-square-foot Luca Faloni retail finish-out.
Is a Luca Faloni store being built at NorthPark Center?
A city permit dated November 16, 2026, describes a 2,002-square-foot interior finish-out for a Luca Faloni retail store. Its TDLR registration, TABS2027004110, lists an applicant-estimated project cost of $1.5 million.
Is NorthPark Center near North Central Expressway?
Yes. NorthPark Center is at 8687 N Central Expy in Dallas, Texas, 75225.
Are the recent NorthPark Center permits for one store?
No. The address is a multi-tenant mall, and recent records describe work in multiple tenant spaces. Some permits do not identify the tenant.
When will the NorthPark Center renovations be finished?
The records provided do not give a completion date.
Also being built nearby
All of 75225- 8687 North Central Expressway Space · Northpark Management CompanyAug 27, 2024Away northpark — renovation/alteration — new tenant build-out in an existing commercial space on the 1st floor of an existing indoor mall building
- 8687 North Central Expressway, Space 1014 · Northpark Management CompanyApr 15, 2024Wilson sporting goods northpark — renovation/alteration — storefront: new storefront, new entrance, new exterior signage (under separate permit) interior: installation of new partitions, installation of new finishes and fixtures, installation of new additional lighting and electrical outlets
- 8687 North Central Expressway · Northpark Land PartnersNov 19, 2026Interior renovation of an existing retail store within a mall. scope includes interior partitions, finishes, fixtures, and associated electrical modifications
- 8687 N Central ExwyNov 13, 2020Installation of fire alarm devices 2 monitor modules 1 relay module 1 stobe only
- 8687 N CentralApr 24, 2025Interior tenant improvement project for a patio seating at the shops at northpark center. scope of work includes building non load bearing walls, installation new hood, and makeup air system, mechanical, plumbing, electrical, & structural work required for full tenant improvement build-out
- 8687 North Central Expressway Space M2-1124 · Northpark Management CompanyApr 10, 2024Diptyque — renovation/alteration — interior tenant improvement -mercantile, new interior storefront, new mep, new interior partitions, finishes and fixtures
- 8687 North Central Expressway, Space 919 · Northpark Management CompanyMar 26, 2025Skims northpark — renovation/alteration — interior tenant improvement of existing 6,350 sq ft retail space within a covered shopping mall. remodel to include storefront, signage (under separate permit), interior partitions, new ceiling, interior finishes, lighting, millwork, mep and structural
- 8687 N. Central Expressway Space 632 · Northpark Management CompanyJan 9, 2024Swatch store rebuild — renovation/alteration — existing store consisting of new tenant exterior and interior improvement, new construction including store finishes, select mech and elect works
- 8687 North Central Parkway · Northpark Land PartnersJan 9, 2026Sezane dallas — renovation/alteration — interior tenant improvement, including interior partitions, finishes, millwork, and lighting. no changes to hvac or plumbing, no change in use
- 8687 N Central Expy · Northpark Land PartnersJan 26, 2026North park food court canopy suite 2388 — renovation/alteration — renovation of existing canopy for food court tenant
- 8687 Northcentral Expressway · Northpark Management CompanyDec 10, 2024Prada dallas northpark remote stockroom — renovation/alteration — tenant interior improvement work for the use as a stockroom
- 8687 North Central Expwy · Northpark Land PartnersJul 23, 2026Auntie anne's — renovation/alteration — complete gut of an existing auntie anne's for new prototypical standards including meps scope