groundranger
Recent · latest filing Apr 2026Residential

2034 Elmwood Blvd

Dallas, TX 75224

Electrical service replacement permitted at 2034 Elmwood Blvd

A City of Dallas permit filed April 20, 2026, covers replacing the home’s fire-damaged electrical service with a new 200-amp service and outdoor main breaker panel. The scope also includes a service mast, whole-home surge protection, grounding work, and three interconnected smoke detectors.

Summarized from City of Dallas records · updated Apr 20, 2026

Projects
1
1 filings
Latest filing
Apr 20, 2026
since Apr 20, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. This recommended option includes a complete upgrade of the home’s electrical service to restore power in a safe, reliable, and fully code-compliant manner following fire damage to the existing overhead service.work to be performed includes removal of the damaged and non-compliant existing service equipment, including the current seu service conductors and zinsco panel.installation of a new 200-amp electrical service will be performed in accordance with current code and utility requirements. this includes installation of a rigid, through-the-roof service mast as required by oncor’s most recent service standards to allow for reconnection of power.a new 200-amp outdoor-rated main breaker panel will be installed to replace the existing zinsco panel, bringing the system up to current safety standards and meeting city of dallas requirements.this option includes installation of a 36ka whole-home surge protector, providing protection for the home’s electrical system and appliances against common voltage spikes and surges.a full grounding system will be installed to meet current nec requirements. this includes proper grounding electrode installation and bonding of the electrical system to ensure safety and compliance.additionally, we will install three wireless interconnected smoke detectors to improve life safety within the home. these units will communicate with each other to provide full-home notification in the event of smoke or fire detection.all work will be performed under a city of dallas electrical permit. the installation will be inspected and must pass inspection before the utility provider (oncor) will reconnect power to the home.applicable nec code references:nec 230.50 – protection against physical damagenec 230.54 – overhead service locations (service mast requirements)nec 230.70 – service disconnect requirementsnec 250.50 – grounding electrode systemnec 250.53 – grounding electrode installationnec 285 – surge protective devicesnec 408.36 – overcurrent protectionnec 110.12 – mechanical execution of worknec 210.12 / 210.52 – general circuit & safety requirements (as applicable)additional notes:existing seu service and zinsco panel will be removed and replaced as required for compliance.rigid mast service is required by oncor for reconnection.all work must pass city of dallas inspection prior to utility reconnection.coordination with oncor will be required for final re-energization.power will remain off until all work is completed, inspected, and approved.change order and scope addendum:any changes to the outlined scope of work, including unforeseen conditions, limited or restricted access, or scheduling constraints, may require a change order. any additional work will be discussed and approved by the customer prior to proceeding

    This recommended option includes a complete upgrade of the home’s electrical service to restore power in a safe, reliable, and fully code-compliant manner following fire damage to the existing overhead service.work to be performed includes removal of the damaged and non-compliant existing service equipment, including the current seu service conductors and zinsco panel.installation of a new 200-amp electrical service will be performed in accordance with current code and utility requirements. this includes installation of a rigid, through-the-roof service mast as required by oncor’s most recent service standards to allow for reconnection of power.a new 200-amp outdoor-rated main breaker panel will be installed to replace the existing zinsco panel, bringing the system up to current safety standards and meeting city of dallas requirements.this option includes installation of a 36ka whole-home surge protector, providing protection for the home’s electrical system and appliances against common voltage spikes and surges.a full grounding system will be installed to meet current nec requirements. this includes proper grounding electrode installation and bonding of the electrical system to ensure safety and compliance.additionally, we will install three wireless interconnected smoke detectors to improve life safety within the home. these units will communicate with each other to provide full-home notification in the event of smoke or fire detection.all work will be performed under a city of dallas electrical permit. the installation will be inspected and must pass inspection before the utility provider (oncor) will reconnect power to the home.applicable nec code references:nec 230.50 – protection against physical damagenec 230.54 – overhead service locations (service mast requirements)nec 230.70 – service disconnect requirementsnec 250.50 – grounding electrode systemnec 250.53 – grounding electrode installationnec 285 – surge protective devicesnec 408.36 – overcurrent protectionnec 110.12 – mechanical execution of worknec 210.12 / 210.52 – general circuit & safety requirements (as applicable)additional notes:existing seu service and zinsco panel will be removed and replaced as required for compliance.rigid mast service is required by oncor for reconnection.all work must pass city of dallas inspection prior to utility reconnection.coordination with oncor will be required for final re-energization.power will remain off until all work is completed, inspected, and approved.change order and scope addendum:any changes to the outlined scope of work, including unforeseen conditions, limited or restricted access, or scheduling constraints, may require a change order. any additional work will be discussed and approved by the customer prior to proceeding

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-002209
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2034 Elmwood Blvd

What work is planned at 2034 Elmwood Blvd?

A City of Dallas electrical permit covers replacing the home’s electrical service and panel after fire damage. The work also includes grounding, surge protection, and three interconnected smoke detectors.

When was the electrical permit filed for 2034 Elmwood Blvd?

The permit was filed on April 20, 2026. Its number is RES-ELC-26-002209.

Is a new home being built at 2034 Elmwood Blvd?

The permit record describes electrical service replacement and safety upgrades at an existing home, not construction of a new home.

What kind of electrical panel is planned at 2034 Elmwood Blvd?

The permit scope calls for a new outdoor-rated 200-amp main breaker panel to replace the existing panel.

Will power be restored at 2034 Elmwood Blvd?

The permit description says the work must pass City of Dallas inspection before Oncor reconnects power. It states that power will remain off until the work is completed, inspected, and approved.

What safety upgrades are included in the 2034 Elmwood Blvd permit?

The scope includes a whole-home surge protector, a new grounding system, and three wireless interconnected smoke detectors, along with replacement electrical service equipment.

Also being built nearby

All of 75224

More cell towers & telecom in 75224.

Get alerts for 2034 Elmwood Blvd