8928 Palisade Dr
Dallas, TX 75217 · Dallas ISD
Dallas ISD plans new 310,000-square-foot W.W. Samuell High School
A new 310,000-square-foot W.W. Samuell High School is planned at 8928 Palisade Dr, with a TDLR project registration filed September 17, 2026. The school is planned to accommodate 2,000 students, with classrooms, science, special education, career and technical education, visual and performing arts, and athletics facilities. A Dallas demolition permit filed September 3, 2026, covers removal of the existing school buildings and related structures. The applicant estimates the project cost at $168 million.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Sep 17, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Sep 17, 2026
- since Jun 4, 2025
- Largest scope
- 310,000 sf
- Estimated cost
- $168M
- state registration
Where this project stands
In state plan reviewDALLAS ISD - W.W. SAMUELL HIGH SCHOOL
310,000 sq ft · $168M est.
- RegisteredSep 17, 2026
- Plan reviewnow
- ConstructionJan '27 – Jan '29
- Inspected
- Closed
Construction is scheduled to start Jan 11, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
7 projectsNew construction of high school to accomodate 2,000 students. school to house classrooms, science, sped, cte, visual / performaning arts, and athletics. — w.w. samuell high school
TDLR project registrationNew ConstructionProject Registered310,000 sq ft$168M est.- Project #
- TABS2027001370
- Tenant / owner
- Dallas ISD - W.w. Samuell High School
- Design firm
- Pro
- Contact
- Pro
Remove existing 1 & 2 story school building in it's entiretyremove existing portable buildings in their entiretyremove existing awnings and gazeboremove existing basement walls. assuming up to 12" thickremove existing foundation concrete - slab & beam up to 2' below existing graderemove existing piers to 10' below existing gradehaul off of all generated debris
Remove existing 1 & 2 story school building in it's entiretyremove existing portable buildings in their entiretyremove existing awnings and gazeboremove existing basement walls. assuming up to 12" thickremove existing foundation concrete - slab & beam up to 2' below existing graderemove existing piers to 10' below existing gradehaul off of all generated debris
City of Dallas permitCommercial Demolition PermitRoof replacement. roof drain installation and relocation. replacement of gas line on roof. replacing chilled and hot water lines on roof
Roof replacement. roof drain installation and relocation. replacement of gas line on roof. replacing chilled and hot water lines on roof
City of Dallas permitCommercial Plumbing Permit
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 8928 Palisade Dr
What is being built at 8928 Palisade Dr in Dallas?
Dallas ISD has registered a new W.W. Samuell High School project at the address. The TDLR registration, filed September 17, 2026, describes a 310,000-square-foot school planned for 2,000 students.
Is a new high school planned on Palisade Drive?
Yes. The TDLR registration identifies the project as new construction of W.W. Samuell High School at 8928 Palisade Dr.
What will the new W.W. Samuell High School include?
The project description lists classrooms, science, special education, career and technical education, visual and performing arts, and athletics facilities.
Is the existing school being demolished at 8928 Palisade Dr?
A City of Dallas commercial demolition permit filed September 3, 2026, covers removal of the existing one- and two-story school building, portable buildings, and related structures. The permit number is COM-DEM-26-000112.
How much is the new W.W. Samuell High School project estimated to cost?
The TDLR registration lists an applicant-estimated project cost of $168 million. This is the applicant’s estimate for the project.
What is being built near the Walia Addition on Bruton Road?
A new W.W. Samuell High School is planned at 8928 Palisade Dr, about 451 meters from the Walia Addition at 9214 Bruton Rd, according to the supplied location records.
Also being built nearby
All of 75217- 8926 Donnybrook LnNov 11, 2020Sewer relay · 104 m away
- 8915 Donnybrook LnSep 2, 2025Storm damage: relocating main electric panel from the closet to the outside of the home and replacing over head service. 200a · 115 m away
- 8943 Donnybrook CirNov 6, 2025Gas test · 140 m away
- 1931 Greendale DrMay 20, 2025Gas test with release. installed dirt leg @ water heater & new ball valve at stove · 141 m away
- 1921 Greendale DrJun 2, 2025Foundation repair-install 16 pilings · 159 m away
- 8822 Palisade DrSep 4, 2025Meter baserepair and restore service · 165 m away
- 8851 Donnybrook LnNov 12, 2020Upgrade existing electrical service · 204 m away
- 9000 Bruton RdOct 21, 2026Install 3.5 ton air handler, condensing unit, supply and return ductwork and bathroom exhaust ductwork · 215 m away
- 9000 Bruton RdOct 12, 2026Install plumbing for rest room-mop sink-break room sink-small elec. water heater · 215 m away
- 8838 Donnybrook LnMay 21, 2025Gas pressure test · 222 m away
- 9128 Donnybrook LnJul 9, 2025Re roof only, no redeck. tear off 1 layer, install 30 yr laminated shingles · 231 m away
- 9140 Donnybrook LnSep 18, 202522 piers100 lf of beamrest and shim194 lf of joist15 block and padsreplacing 576 sq ft of sub-floor · 252 m away