155 Riveredge Dr
Dallas, TX 75207 · Project Meridian Ph4, Project Meridian Ph2 + 2 more
Office tenant improvements planned at 155 Riveredge Dr
Permits indicate interior office tenant improvements at 155 Riveredge Dr, including a roughly 27,500-square-foot first-generation build-out on part of the third floor. The City of Dallas issued the latest listed alteration permit on November 11, 2026; the scope includes new partitions, ceilings, finishes and building-system modifications.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 11, 2026
- Projects
- 24
- 24 filings
- Latest filing
- Nov 11, 2026
- since Dec 23, 2024
- Largest scope
- 27,500 sf
- Estimated cost
- $5.7M
- state registration
Where this project stands
In state plan reviewProject Meridian PH4
27,500 sq ft · $5.7M est.
- RegisteredNov 3, 2026
- Plan reviewnow
- ConstructionJan '27 – Jul '27
- Inspected
- Closed
Construction is scheduled to start Jan 22, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 4 phone numbers
Permit & project history
24 projectsMcr location address: 155 riveredge dr dallas, tx 75207 level 3 scope of work:1 st gen ti within a portion of the 3rd floor, approx 27,500 sq ft scope includes minor demolition, new partitions, ceilings, millwork, finishes, and modifications to the mechanical, electrical, and plumbing systems to support the new space
Mcr location address: 155 riveredge dr dallas, tx 75207 level 3 scope of work:1 st gen ti within a portion of the 3rd floor, approx 27,500 sq ft scope includes minor demolition, new partitions, ceilings, millwork, finishes, and modifications to the mechanical, electrical, and plumbing systems to support the new space
City of Dallas permitCommercial Alteration Addition Permit1 st gen ti within a portion of the 3rd floor, approx 27,500 sq ft scope includes minor demolition, new partitions, ceilings, millwork, finishes, and modifications to the mechanical, electrical, and plumbing systems to support the new space — river edge
TDLR project registrationRenovation/AlterationProject Registered27,500 sq ft$5.7M est.- Project #
- TABS2027005032
- Tenant / owner
- Project Meridian Ph4
- Design firm
- Pro
- Contact
- Pro
Mcr scope of work:ti within an existing lvl 2 spec suite of an office building. approx 7,900 sq ft, new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition
Mcr scope of work:ti within an existing lvl 2 spec suite of an office building. approx 7,900 sq ft, new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition
City of Dallas permitCommercial Alteration Addition PermitTi within an existing lvl 2 spec suite of an office building. approx 7,900 sq ft, new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition. — river edge
TDLR project registrationRenovation/AlterationProject Registered7,900 sq ft$4.8M est.- Project #
- TABS2027004033
- Tenant / owner
- Project Meridian Ph2
- Design firm
- Pro
- Contact
- Pro
Mcr address: 155 riveredge - suite 155scope: interior: remodel ti within an existing lvl 2 spec suite of an office building, approx 7,900 sq ft scope includes new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition
Mcr address: 155 riveredge - suite 155scope: interior: remodel ti within an existing lvl 2 spec suite of an office building, approx 7,900 sq ft scope includes new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition
City of Dallas permitCommercial Alteration Addition PermitTi within an existing lvl 2 spec suite of an office building, approx 7,900 sq ft scope includes new furniture installation with associated elec, mech updates, limited wall modifications for relocation of an existing door, and minimal demolition. — river edge
TDLR project registrationRenovation/AlterationProject Registered7,900 sq ft$200K est.- Project #
- TABS2026028665
- Tenant / owner
- Project Meridian Ph1
- Design firm
- Pro
- Contact
- Pro
2 split systems, duct, grills, 1 louver, 3 exhaust fans, 1 air curtain, kitchen exhaust fan and hoods
2 split systems, duct, grills, 1 louver, 3 exhaust fans, 1 air curtain, kitchen exhaust fan and hoods
City of Dallas permitCommercial Mechanical PermitNew electrical lighting receptacles, installing new kitchen equipment, installing new electrical panel out of existing service
New electrical lighting receptacles, installing new kitchen equipment, installing new electrical panel out of existing service
City of Dallas permitCommercial Electrical PermitRepull wiring in (1) conduit feeding existing main building switchboard to extend neutral wiring
Repull wiring in (1) conduit feeding existing main building switchboard to extend neutral wiring
City of Dallas permitCommercial Electrical PermitThe scope of this project is a non-structural interior finish out in an existing shell single floor suite. scope includes hvac, electrical, and plumbing. — river edge
TDLR project registrationRenovation/AlterationProject Closed1,763 sq ft$320K est.- Project #
- TABS2025008411
- Tenant / owner
- Rhythm Section Salon
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 155 Riveredge Dr
What is being built at 155 Riveredge Dr in Dallas?
Permits indicate interior office tenant improvements in the existing building, including a roughly 27,500-square-foot build-out on part of the third floor. The City of Dallas issued permit COM-ALT-ADD-26-002772 on November 11, 2026.
Is a new office building being built at 155 Riveredge Dr?
The records describe interior work in an existing office building, not construction of a new building. The latest listed permit covers tenant improvements on part of the third floor.
How large is the 155 Riveredge Dr office renovation?
The third-floor scope is approximately 27,500 square feet. Separate permits and registrations also describe two approximately 7,900-square-foot tenant-improvement scopes on the second floor.
When was the latest permit for 155 Riveredge Dr issued?
The latest listed City of Dallas permit is COM-ALT-ADD-26-002772, dated November 11, 2026. It covers the third-floor tenant-improvement scope.
How much will the 155 Riveredge Dr project cost?
The TDLR registration for Project Meridian PH4 lists an applicant-estimated cost of $5.7 million for that project. This is an estimate for that registered project, not a stated cost for all work at the address.
What work is included in the 155 Riveredge Dr renovation?
The third-floor scope includes minor demolition, new partitions, ceilings, millwork and finishes, along with modifications to mechanical, electrical and plumbing systems. The second-floor scopes include new furniture, related system updates and limited wall modifications.
Also being built nearby
All of 75207- 150 Turtle Creek BlvdNov 17, 2026Electrical tenant finish-out for l'atelier paris showroom-demolishing existing lighting and devises and installing new led and emergency egress fixtures. -relocating track lighting, -adding lighting controls-new receptacles and floor feeds-connecting the restroom exhuast fan · 162 m away
- 150 Turtle Creek Blvd · C/O Asana Partners LP ColumbiaJul 16, 2025Dawson agency — renovation/alteration — cabinetry, paint, carpet, tile, dividing walls · 162 m away
- 1800 Irving BlvdFeb 12, 2026Perform gas pressure test · 172 m away
- 167 Turtle Creek Blvd · City Of DallasFeb 18, 2026Traffic signal at three intersections — renovation/alteration — 3 intersection signal improvements consisting of signal replacement, ramp replacement, concrete paving and pavement markings (approx. 4,000 sq ft) · 179 m away
- 139 Turtle Creek Blvd · N13group, LLCApr 22, 2026Remodel plumbing, tankless water heater. adding three bf devices · 182 m away
- 1815 Levee StNov 4, 2025Gas test · 188 m away
- 120 Turtle Creek BlvdOct 23, 2026Relocate gas main line · 194 m away
- 1745 Levee StJan 21, 2021Install fence · 194 m away
- 1821 Levee StJan 12, 2021To complete work permit 1701111072 · 195 m away
- 175 Oak Lawn AveNov 3, 2026Install a walk-in cooler* type 1 vent hood · 205 m away
- 175 Oak Lawn · O & S Realty, LLCJun 17, 2026Melodian jazz lounge — renovation/alteration — interior remodel of an existing office warehouse for a new restaurant, including a new accessible route ramp · 205 m away
- 1729 Irving Blvd · Wkp1729 LLCMay 7, 2026Gas test · 206 m away
More demolitions in 75207, warehouses & industrial in 75207, offices in 75207.