groundranger
Active · latest filing Nov 2026Commercial

1341 Crampton St

Dallas, TX 75207

Remodel prepares building for wholesale tortilla factory

A remodel at 1341 Crampton St is intended to prepare the building for a wholesale tortilla factory, according to a commercial alteration permit filed Nov. 10, 2026 (COM-ALT-ADD-26-002444). The work description includes upgrades to plumbing, electrical, mechanical and building systems, including a vent hood and grease interceptors.

Summarized from City of Dallas records · updated Nov 13, 2026

Projects
9
9 filings
Latest filing
Nov 13, 2026
since Nov 13, 2026
Largest scope
—
Listed value
—

Permit & project history

9 projects
  1. Alt-add plumbing remodel

    Alt-add plumbing remodel

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-004396
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Upgrade existing electrical service to 400 amps, 3-phase, including new meter, disconnects, electrical panels, feeders, branch circuits, receptacles, lighting fixtures, emergency lighting, exit signs, and power connections for kitchen equipment and hvac units. remove and replace existing electrical components as needed

    Upgrade existing electrical service to 400 amps, 3-phase, including new meter, disconnects, electrical panels, feeders, branch circuits, receptacles, lighting fixtures, emergency lighting, exit signs, and power connections for kitchen equipment and hvac units. remove and replace existing electrical components as needed

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005607
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Bu zo el pl me he remodel to make ready to be able to open wholesale tortilla factory. we will be upgrading plumbing, electrical, mechanical, and building. we will install venting hood, grease interceptors and all plumbing related to that installation including but not limited to floor sinks, handsinks, three compartment sinks, mop sinks, floor drains. we will also remodel the the building. all remodel aspects are listed on the attached plans

    Bu zo el pl me he remodel to make ready to be able to open wholesale tortilla factory. we will be upgrading plumbing, electrical, mechanical, and building. we will install venting hood, grease interceptors and all plumbing related to that installation including but not limited to floor sinks, handsinks, three compartment sinks, mop sinks, floor drains. we will also remodel the the building. all remodel aspects are listed on the attached plans

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002444
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Ste: a service upgrade

    Ste: a service upgrade

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001264
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Pressure gas test in unit b

    Pressure gas test in unit b

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002393
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Pressure gas test for unit a

    Pressure gas test for unit a

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002392
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Service upgrade

    Service upgrade

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001108
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Suite # bservice upgrade

    Suite # bservice upgrade

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001266
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Ste b service upgrade

    Ste b service upgrade

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001118
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1341 Crampton St

What is being built at 1341 Crampton St?

A City of Dallas permit describes a remodel to prepare the building to open a wholesale tortilla factory. The permit was filed Nov. 10, 2026, under number COM-ALT-ADD-26-002444.

Is a tortilla factory planned for 1341 Crampton St?

A Nov. 10, 2026, alteration permit says the remodel is to make the building ready to open a wholesale tortilla factory. The permit does not provide an opening date.

What work is planned at 1341 Crampton St?

The permit description includes building, plumbing, electrical and mechanical remodeling, plus a vent hood, grease interceptors and related plumbing fixtures. It is permit COM-ALT-ADD-26-002444, filed Nov. 10, 2026.

When were permits filed for 1341 Crampton St?

The latest listed permit was filed Nov. 13, 2026, for an additional plumbing remodel (COM-PLM-26-004396). The alteration permit describing the wholesale tortilla factory remodel was filed Nov. 10, 2026.

Is a restaurant opening at 1341 Crampton St?

The permit details describe a remodel to prepare the building for a wholesale tortilla factory, not a named restaurant. They do not identify a restaurant tenant.

Also being built nearby

All of 75207
Get alerts for 1341 Crampton St