6688 N Central Expy
Dallas, TX 75206 · Lre - Stair Addition, Enhabit 12th Floor + 3 more
Suite renovation for a cafe, bar and lounge at 6688 N Central Expy
Dallas permits filed Nov. 13, 2026, describe an interior renovation converting a suite into a cafe, bar and lounge, along with exterior patio renovations and landscaping. Related permits cover plumbing and electrical work for a remodel of existing office space and its patio. Separate September permits cover removal of an abandoned backflow assembly in the parking garage.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 16, 2026
- Projects
- 17
- 17 filings
- Latest filing
- Nov 16, 2026
- since Nov 13, 2026
- Largest scope
- —
- Estimated cost
- $1.5M
- state registration
Permit & project history
17 projectsRed flag was a porker room" - interior renovation of suite converting to cafe bar and lounge, with exterior patio renovations and landscaping
Red flag was a porker room" - interior renovation of suite converting to cafe bar and lounge, with exterior patio renovations and landscaping
City of Dallas permitCommercial Alteration Addition PermitRemodel of the existing office space and exterior patio. new electrical devices, lighting, and electrical service panel
Remodel of the existing office space and exterior patio. new electrical devices, lighting, and electrical service panel
City of Dallas permitCommercial Electrical PermitWe will be removing the now abandoned backflow assembly in the g2 level of the parking garage. this assembly is no longer in use and used to supply water to a decorative fountain that is no longer there, but the building keeps getting notice of needed test since the assembly is still installed. i have supplied the co for this building, and this job is for the building and not a tenant with a suite number this is for the building itself.co# 1708011012
We will be removing the now abandoned backflow assembly in the g2 level of the parking garage. this assembly is no longer in use and used to supply water to a decorative fountain that is no longer there, but the building keeps getting notice of needed test since the assembly is still installed. i have supplied the co for this building, and this job is for the building and not a tenant with a suite number this is for the building itself.co# 1708011012
City of Dallas permitCommercial Plumbing PermitRemove the abandoned, no longer needed backflow assembly in g2 parking garage that use to feed a water feature that has been removed
Remove the abandoned, no longer needed backflow assembly in g2 parking garage that use to feed a water feature that has been removed
City of Dallas permitCommercial Plumbing PermitStair addition between two existing floors in an existing high-rise building — energy square 3
TDLR project registrationRenovation/AlterationProject Closed300 sq ft$450K est.- Project #
- TABS2024026045
- Tenant / owner
- Lre - Stair Addition
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — energy square 3
TDLR project registrationNew ConstructionProject Closed16,514 sq ft$1.5M est.- Project #
- TABS2023026449
- Tenant / owner
- Enhabit 12th Floor
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — energy square 3
TDLR project registrationNew ConstructionProject Closed16,536 sq ft$1.3M est.- Project #
- TABS2023026444
- Tenant / owner
- Enhabit 11th Floor
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — energy square 3
TDLR project registrationNew ConstructionProject Closed9,726 sq ft$850K est.- Project #
- TABS2023026437
- Tenant / owner
- Enhabit 9th Floor
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — energy square 3
TDLR project registrationNew ConstructionProject Closed16,051 sq ft$1.5M est.- Project #
- TABS2023026456
- Tenant / owner
- Enhabit 13th Floor
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 6688 N Central Expy
What is being built at 6688 N Central Expy?
Dallas permit descriptions filed Nov. 13, 2026, indicate a suite is being converted into a cafe, bar and lounge. The work also includes exterior patio renovations and landscaping.
Is a new cafe, bar or lounge opening at 6688 N Central Expy?
A Nov. 13, 2026, alteration permit describes converting a suite into a cafe, bar and lounge. The permit record does not give an opening date.
When were permits filed for the renovation at 6688 N Central Expy?
The cafe, bar and lounge renovation permits were filed Nov. 13, 2026. The City of Dallas records include alteration, plumbing and electrical permits.
Does the renovation at 6688 N Central Expy include a patio?
Yes. The alteration permit describes exterior patio renovations and landscaping, and an electrical permit covers a remodel of existing office space and the exterior patio.
What work is planned in the parking garage at 6688 N Central Expy?
Two City of Dallas plumbing permits filed in September 2026 describe removing an abandoned backflow assembly in the G2 level of the parking garage. The assembly had served a water feature that was removed.
Also being built nearby
All of 75206- 6688 North Central Expressway · Energy Square LLCSep 24, 2025Energy square iii amenities — renovation/alteration — 7,400 sq ft renovation of a cafe on the 1st floor of an existing office building
- 5603 Milton StOct 12, 2020Install 3 new un-manned cabinets / video kiosks, four dot antennas, underground fiber vault power · 101 m away
- 5649 Milton Street · US Energy Square, LLCApr 5, 2024Welch architecture — renovation/alteration — 1,101 sq ft of tenant improvement · 124 m away
- 5646 Milton StJun 23, 2026Relocate gas meter · 130 m away
- 5646 Milton Street · US Energy Square, LLCFeb 11, 2025Swa group — renovation/alteration — renovation of existing b occupancy office space on level 1. all building core elements to remain. tenant improvement work entails new non-bearing partitions, millwork, ceiling/lighting, doors/frames, power/communication and new finishes · 130 m away
- 5646 Milton Strett · US Energy Square, LLCApr 13, 2026On partners — renovation/alteration — 3,309 sq ft of tenant improvement · 130 m away
- 5111 Greenville Avenue · Westwood FinancialJul 12, 2024Activate games - highland park — renovation/alteration — tenant improvement project involves 10,426 sq ft within an existing building. the proposed work involves constructing game rooms, restrooms, new partitions, ceilings, lighting, hvac, and finishes · 194 m away
- 5111 Greenville Ave · Westwood FinancialJul 23, 2025Repair sewer line · 194 m away
- 4930 Greenville AveJul 27, 2026Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect · 199 m away
- 4925 Greenville AveFeb 23, 2026Adding stage power & vendor power next to stage · 207 m away
- 4925 Greenville Avenue · US Energy Square, LLCJul 7, 2025Arco / murray expansion — renovation/alteration — interior renovation of existing office space in a high rise building · 207 m away
- 4925 Greenville Avenue · US Energy Square LLCNov 19, 2025Five states energy — renovation/alteration — renovation of existing 8,604 square foot interior office space · 207 m away