groundranger
Recent · latest filing Sep 2025Residential

4920 Julian Alps

Bee Cave, TX 78738

6.8-kW rooftop solar system permitted at existing home

A 6.8-kW rooftop solar system for an existing home at 4920 Julian Alps was permitted on September 9, 2025. City of Austin electrical permit 2025-113255 EP is marked Final.

Summarized from City of Austin records · updated Sep 9, 2025

Projects
1
1 filings
Latest filing
Sep 9, 2025
since Sep 9, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 6.800 kw rooftop solar system for existing residential only

  1. AppliedSep 5, 2025
  2. IssuedSep 9, 2025
  3. WorkSep '25 – Mar '26
  4. Final inspectionNov 10, 2025

Passed final inspection Nov 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install new 6.800 kw rooftop solar system for existing residential only

    Install new 6.800 kw rooftop solar system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4920 Julian Alps

What is being built at 4920 Julian Alps?

A City of Austin permit records installation of a new 6.8-kW rooftop solar system for an existing residence. Permit 2025-113255 EP was filed September 9, 2025.

Is a new home being built at 4920 Julian Alps?

The permit describes a solar installation for an existing residence, not construction of a new home. The electrical permit is marked Final.

When was the solar permit for 4920 Julian Alps filed?

The permit was filed September 9, 2025. It is listed as City of Austin permit 2025-113255 EP.

What size solar system is planned at 4920 Julian Alps?

The permit describes a new 6.8-kW rooftop solar system at the existing residence.

What's being installed near Lake Travis ISD in Bee Cave?

At 4920 Julian Alps, about 466 meters from the Lake Travis ISD address listed in the records, a permit records a 6.8-kW rooftop solar installation for an existing home. The permit was filed September 9, 2025.

Also being built nearby

All of 78738

More solar installs in 78738.

Email me when a new permit is filed