12816 Hacienda Ridge
Bee Cave, TX 78738
10.32 kW rooftop solar system permitted in Bee Cave
A 10.32 kW rooftop solar system is being installed at an existing residence at 12816 Hacienda Ridge in Bee Cave. The City of Austin electrical permit, 2025-081266 EP, was filed on July 2, 2025, and is listed as final.
Summarized from City of Austin records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 10.320 kw rooftop solar system for existing residential only
- AppliedJun 30, 2025
- IssuedJul 2, 2025
- WorkJul '25 – Dec '25
- Final inspectionJul 25, 2025
Passed final inspection Jul 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new 10.320 kw rooftop solar system for existing residential only
Install new 10.320 kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-081266 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12816 Hacienda Ridge
What is being built at 12816 Hacienda Ridge?
The permit describes installation of a 10.32 kW rooftop solar system at an existing residence.
When was the solar permit filed for 12816 Hacienda Ridge?
The City of Austin permit was filed on July 2, 2025.
What is the permit number for the solar installation?
The electrical permit number is 2025-081266 EP. Its status is listed as final.
Is this solar system for a new home?
No. The permit description specifies a rooftop solar installation for an existing residence.
How large is the rooftop solar system at 12816 Hacienda Ridge?
The permit describes a 10.32 kW system.
How much will the solar installation cost?
The permit record does not report a project valuation or cost.
Also being built nearby
All of 78738- 12812 Hacienda RidgeNov 9, 2026Etj- shut off to replace main breaker · 43 m away
- 12821 Hacienda RidgeMar 1, 2024Installation of a generator and automatic transfer switch. requires a temporary disconnect · 84 m away
- 12913 Hacienda RidgeSep 17, 2024Temp loop for a new construction of a pool house located in etj · 152 m away
- 12920 Hacienda RidgeJul 21, 2026We will be installing 4 circuits to an existing sub-panel and replacing outlets and switches in a small utility room and replacing light fixtures in the same room. moving the dryer and washer to a new location in the same utility room. customer serviced by austin energy · 264 m away
- 5017 Great Divide DrMar 28, 2025Request to disconnect were installing a 24.36 kw solar system 4 tesla pw 3 batteries and dg pv meter. we need to disconnect to install the pws and 150amp gateway · 273 m away
- 4816 Pecan ChaseSep 20, 2024New service in etj 600 amp service · 422 m away
- 4713 Pecan ChaseMay 20, 2025Etj temp contruction loop ref · 430 m away
- 5304 Great Divide DrFeb 17, 2025Build overhead 350 amp single phase electrical service on a rack · 515 m away
- 5308 Great Divide DrSep 3, 2026200amp panel meter base and riser replacement adding grounding rods and surge protection. austin electric in the electrical provider · 541 m away
- 4909 Great Divide DrJan 22, 2025Install new 12.325kw rooftop solar system for existing residential only · 542 m away
- 12624 Side Oats DrFeb 5, 2025Etj new service for sfr · 549 m away
More solar installs in 78738.