10601 Bluff Bend Dr
Austin, TX 78753
Holy Word Church site-plan case filed in Austin
Austin records show a site-plan case for Holy Word Church at 10601 Bluff Bend Dr, filed July 16, 2026; its status is expired. A separate plumbing permit filed September 15, 2025, for a cutover from septic to city sewer is marked final.
Summarized from City of Austin records · updated Jul 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 16, 2026
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCutover from septic to city sewer only
- AppliedSep 12, 2025
- IssuedSep 15, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 23, 2025
Passed final inspection Oct 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCutover from septic to city sewer only
Cutover from septic to city sewer only
City of Austin permitPlumbing PermitFinal- Record
- 2025-116108 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10601 Bluff Bend Dr
What is being built at 10601 Bluff Bend Dr in Austin?
City records list a site-plan case named Holy Word Church, filed July 16, 2026. The case is marked expired, and the records provided do not specify construction details.
Is a new church being built at 10601 Bluff Bend Dr?
The City of Austin has a site-plan case for Holy Word Church at this address. Its status is expired, so the record does not confirm that a new church is being built.
What is the status of the Holy Word Church site plan in Austin?
The site-plan case, number 13094016, was filed July 16, 2026, and is marked expired.
Was a sewer permit filed for 10601 Bluff Bend Dr?
Yes. Plumbing permit 2025-116108 PP, filed September 15, 2025, is for a cutover from septic to city sewer and is marked final.
When were permits filed for 10601 Bluff Bend Dr?
The plumbing permit was filed September 15, 2025. The Holy Word Church site-plan case was filed July 16, 2026.
Also being built nearby
All of 78753- 10512 Walnut Bend DrJun 8, 2026Tunneling up to 85 feet of building waste drain line to replace existing cast iron with pvc · 103 m away
- 10607 Walnut Bend DrMar 25, 2026***emergency***install/replace 125 amp main breaker panel and meter can (overhead) · 124 m away
- 10605 Walnut Bend DrJan 28, 2026Express: foundation repair · 127 m away
- 1006 Hollybluff StSep 3, 2026Excavate 40 tunnel to repair main drain line under house · 136 m away
- 10601 Denell CirDec 3, 2024New pool prefabricated with concrete decking - no plumbing permit required · 144 m away
- 908 Hollybluff StDec 30, 2025Customer had a four tags 1 four water heater gas line leaking removed any rusted fittings and replaced it with new black iron fittings. fireplace was leaking as well that was tagged there was a copper line feeding fireplace trace that back into the furnace closet using a half inch nipple and a half inch cap. i capped off tee that was feeding copper gas line. put the whole house on test at meter using a 1 inch bell reducer to three-quarter put the pressure at 15 psi it held for 20 minutes pulling inspection for job as well to ensure there are no leaks on the system · 148 m away
- 1005 Hollybluff StMar 5, 2024Cutover from septic to city sewer only 2024-023243 ww · 167 m away
- 1001 Hollybluff StFeb 28, 2024Replacement of an existing water heater · 170 m away
- 10614 Denell CirNov 21, 2023Express: replacement of windows like for like · 191 m away
- 1101 Hollybluff StOct 29, 2024Repipe the clothes washer drain line thru the garage outside the right side of the house toward the front of the house. there we will run across the yard and connect to the existing sanitary sewer yard line. we will demolition and patch concrete in the garage as needed to run this new line. we will also cut out the kitchen cabinet bottom and back chip concrete enough to stub out a new waste line for the kitchen sink. we will repair the cabinet after inspections. we include the required engineer inspection and report · 212 m away
- 1006 E Applegate DrAug 7, 2026Tpole · 222 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 224 m away