7715 Chevy Chase Dr
Austin, TX 78752
Site plan filed for Kia Central Austin in Austin
A site plan case named Kia Central Austin was filed at 7715 Chevy Chase Dr on November 12, 2026. The City of Austin lists the case as In Review; the record does not describe the proposed work in more detail.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLike for like change out of condenser and air handler with no duct work for an individual unit in building 4. unit 201
- AppliedJan 17, 2024
- IssuedJan 23, 2024
- WorkJan '24 – Jul '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsLike for like change out of condenser and air handler with no duct work for an individual unit in building 4. unit 201
Like for like change out of condenser and air handler with no duct work for an individual unit in building 4. unit 201
City of Austin permitMechanical PermitFinal- Record
- 2024-006085 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7715 Chevy Chase Dr
What is being proposed at 7715 Chevy Chase Dr?
A City of Austin site plan case named Kia Central Austin was filed for the address. The case, number 13673960, is In Review.
When was the Kia Central Austin site plan filed?
The City of Austin case was filed on November 12, 2026.
Has the Kia Central Austin site plan been approved?
The case status is In Review, so the record does not show it as approved.
Is Kia Central Austin under construction?
The record is a site plan case in review and does not provide construction details.
What is being planned near Taasa Expansion at Chase Park One?
A site plan case named Kia Central Austin was filed at 7715 Chevy Chase Dr, about 79 meters from Taasa Expansion at Chase Park One at 7700 Chevy Chase Drive. The case is In Review.
How large is the Kia Central Austin project?
The City of Austin case record does not list a project size or estimated cost.
Also being built nearby
All of 78752- 7591 Chevy Chase DrJan 23, 2024Like for like change out of condenser and air handler with no duct work · 68 m away
- 7700 Chevy Chase DrMar 30, 2026Interior expansion of a second generation office space two suites becoming one · 79 m away
- 7700 Chevy Chase Drive · Cilp Austin I LLCFeb 11, 2026Taasa expansion at chase park one — renovation/alteration — interior alteration of an existing business suite · 79 m away
- 7600 Chevy Chase Drive · Chase Park Bldg 2Aug 14, 2026Chase park spec suite 101 — renovation/alteration — interior remodel to existing admin/bus office · 86 m away
- 7600 Chevy Chase DrOct 29, 2026Interior remodel to existing admn/bus office · 86 m away
- 7589 Chevy Chase DrMar 4, 2024Like for like change out of condenser and air handler with no duct work. building 3 unit 105 · 87 m away
- 7597 Chevy Chase DrMar 24, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 7599 Chevy Chase DrMar 24, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 7595 Chevy Chase DrAug 27, 2026Remove existing water-heating equipment and install a new rinnai hybrid water-heating system in the existing location. reconnect the existing gas supply to the new unit as-is. install new water shutoff valves thermostatic mixing valve and new copper water piping serving the new heater. install new temperature and pressure relief valve discharge piping new drain pan with pan drain and condensate neutralizer. connect system to existing building plumbing and place into operation in accordance with manufacturer requirements and applicable city of austin plumbing and mechanical codes · 91 m away
- 7585 Chevy Chase DrApr 21, 2026Replacing commercial water heater 100 gallon with a 100 gallon rinnai commercial water heater - replacing leaking copper pipes in water heater rooms and insulation pipe that is newly installed with commercial grade approved insulation. pre existing copper is not currently insulated and customer does not want it insulated until it is replaced · 99 m away
- 7587 Chevy Chase DrJan 23, 2024Building 2; unit 103 and unit 202 like for like change out of condenser and air handler with no duct work · 114 m away
- 7598 Chevy Chase DrApr 21, 2026Replacing commercial water heater 100 gallon with a 100 gallon rinnai commercial water heater - replacing leaking copper pipes in water heater rooms and insulation pipe that is newly installed with commercial grade approved insulation. pre existing copper is not currently insulated and customer does not want it insulated until it is replaced. 0 · 117 m away