903 Cedar Gln
Austin, TX 78745
Austin home addition and remodel includes a new office
Austin permits filed April 30, 2026, describe an addition and remodel to the existing one-story single-family home at 903 Cedar Gln. The plans include a first-floor addition, interior remodeling, a new office and a rear patio. Related electrical, plumbing and mechanical permits were filed through June 26, 2026.
Summarized from City of Austin records · updated Jun 26, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 26, 2026
- since May 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
- AppliedApr 3, 2026
- IssuedJun 26, 2026
- WorkJun '26 – Aug '26
- Final inspectionAug 28, 2026
Passed final inspection Aug 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
6 projectsEplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
City of Austin permitMechanical PermitFinal- Record
- 2026-052963 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
City of Austin permitPlumbing PermitFinal- Record
- 2026-052963 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
City of Austin permitElectrical PermitFinal- Record
- 2026-052963 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
95 tunnel tunnel below the foundation to replace entire drain system and 35 trench for yard sewer replace. 3access holes - back back left
95 tunnel tunnel below the foundation to replace entire drain system and 35 trench for yard sewer replace. 3access holes - back back left
City of Austin permitPlumbing PermitActive- Record
- 2026-038627 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio
City of Austin permitBuilding PermitFinal- Record
- 2026-052963 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrading residential service main panel and austin energy approved meter from 100 amp to 200 amp replacing subpanel in garage updating grounding system and installing arc fault gfci breakers
Upgrading residential service main panel and austin energy approved meter from 100 amp to 200 amp replacing subpanel in garage updating grounding system and installing arc fault gfci breakers
City of Austin permitElectrical PermitFinal- Record
- 2025-057788 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 903 Cedar Gln
What is being built at 903 Cedar Gln in Austin?
Permits describe an addition and remodel to an existing one-story single-family home, including a new office and rear patio. The building permit, 2026-052963 BP, was filed April 30, 2026.
Is a new home being built at 903 Cedar Gln?
The permit records describe work on an existing single-family home, not construction of a new home. The plans include a first-floor addition and interior remodeling.
What does the remodel at 903 Cedar Gln include?
The permit description lists interior remodeling, a first-floor addition, a new office and a rear patio. Related electrical, plumbing and mechanical permits were filed from June 4 to June 26, 2026.
Is there plumbing work planned at 903 Cedar Gln?
Yes. A May 19, 2026, plumbing permit, 2026-038627 PP, describes replacing the drain system with tunneling below the foundation and trenching for the yard sewer.
What's being built near Time Village in Austin?
At 903 Cedar Gln, about 323 meters from Time Village according to the map data, permits describe an addition and remodel to an existing single-family home. The plans include a new office and rear patio.
When were permits filed for the 903 Cedar Gln remodel?
The building permit was filed April 30, 2026. Related electrical, plumbing and mechanical permits were filed between June 4 and June 26, 2026.
Also being built nearby
All of 78745- 901 Cedar GlnSep 16, 2025Upgrade ae meter socket and add a main breaker add ev charger · 24 m away
- 909 Cedar GlnNov 5, 2025French/hanson - 39-04815: install new 7.6 kw rooftop solar system to existing residential only using backfed breaker · 64 m away
- 805 Cedar GlnApr 25, 2024Replacement of an existing water heater · 66 m away
- 804 Cedar GlnDec 11, 2024Replace sewer line · 68 m away
- 1016 W Stassney LnJan 3, 2024Remove and replace deteriorating supports on building 2 stair landing · 111 m away
- 800 Cedar GlnJun 30, 2026Interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets · 112 m away
- 5417 Salem Walk DrApr 14, 2026Replacing sewer piping under home plus some of the sewer yard line · 115 m away
- 1000 Cedar GlnMar 4, 2025Installation of main panel upgrade of 225a and 125 a · 129 m away
- 5504 Salem Walk DrFeb 27, 2025Express: foundation repair - install 18 piers · 136 m away
- 5409 Salem Walk DrMay 14, 2026Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 5410 Salem Walk DrAug 6, 2026Express: tub to tub replacement in same exact location · 147 m away
- 1005 Cedar GlnApr 9, 2026Replacement of complete existing central heat and air system with or without duct work · 152 m away