Active · latest filing Nov 2026Commercial

4544 S Lamar Blvd Sb

Austin, TX 78745

Theater and dance school finish-out on South Lamar

Austin permits filed Nov. 3 and Nov. 16, 2026, describe a phase 2.2 change of use and finish-out for a theater and dance school, with new exterior openings for glazing and shade canopies over exits. The permit description references a 150,000-square-foot project. Other recent permits cover rooftop solar and a sewer line repair.

Summarized from City of Austin records · updated Nov 18, 2026

Projects
60
60 filings
Latest filing
Nov 18, 2026
since Nov 13, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Sewer yard line repair from manhole to lift station

  1. AppliedNov 16, 2026
  2. IssuedNov 18, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
1% through of the permit windowNov 18, 2026 → May 17, 2027

1 contact on this project · 1 phone number

Permit & project history

60 projects
  1. Sewer yard line repair from manhole to lift station

    Sewer yard line repair from manhole to lift station

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Rooftop solar. rooftop solar backfed breaker interconnection. 2026-125643 da

    Rooftop solar. rooftop solar backfed breaker interconnection. 2026-125643 da

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. phase 2.2 (2025-052228pr) (150000 sq ft)

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Install internally illuminated sign cabinet reading luxora theater on the south elevation

    Install internally illuminated sign cabinet reading luxora theater on the south elevation

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Interior finish out to create a medical office

    Interior finish out to create a medical office

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. 7 day - minor interior renovations to an existing medical office. - ova

    7 day - minor interior renovations to an existing medical office. - ova

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. 7 day - minor interior renovations to an existing medical office. - ova

    7 day - minor interior renovations to an existing medical office. - ova

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. 7 day - minor interior renovations to an existing medical office. - ova

    7 day - minor interior renovations to an existing medical office. - ova

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Interior finish out to create a medical office

    Interior finish out to create a medical office

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Interior finish out to create a medical office

    Interior finish out to create a medical office

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Interior finish out to create a medical office

    Interior finish out to create a medical office

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    Eplan: commercial expedited review - [concurrent] change of use and finish out for theater and dance school in space previously retuned to shell in phase i scope includes new exterior openings for glazing and shade canopies over exits. (2025-052228pr) (150000 sq ft)

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Southwest dermatology

    Southwest dermatology

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Fabricate and install (1) set of ag channel letters with logo

    Fabricate and install (1) set of ag channel letters with logo

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Fabricate and install one set of aec channel letters on north elevation

    Fabricate and install one set of aec channel letters on north elevation

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Fabricate and install one set of aec channel letters on west facade

    Fabricate and install one set of aec channel letters on west facade

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Trucare east facade

    Trucare east facade

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  24. Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  26. Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  27. Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    Level 0: build out for new 1050 sq ft s-2 suite within existing storage

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  28. Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  29. Stair infill between floors 1 and lower level or basement

    Stair infill between floors 1 and lower level or basement

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  30. Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  31. Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  32. Interior remodel for clinic and office space

    Interior remodel for clinic and office space

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  33. Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    Change of use from admin/office to medical office interior remodel and exterior storefront extension. 2025 052580 da- pending

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  34. Level 1: finish-out for 16347 sq ft business: medical office (ambulatory surgery center) in existing suite. suite will have medical gas and access control

    Level 1: finish-out for 16347 sq ft business: medical office (ambulatory surgery center) in existing suite. suite will have medical gas and access control

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  35. Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  36. Halo lit fabricated letters in black aluminum reading austin retina associates on west elevation

    Halo lit fabricated letters in black aluminum reading austin retina associates on west elevation

    City of Austin permitElectrical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  37. Interior remodel for clinic and office space

    Interior remodel for clinic and office space

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  38. Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  39. Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  40. Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    Change of use from medical office to ambulatory surgical center: tenant finish out for an ambulatory surgical center. includes a canopy and awning component. 2025 039747 da - concurrent reviews

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

+ 20 older projects. See the full history with a free trial.

Sources: City of Austin

Questions about 4544 S Lamar Blvd Sb

What is being built at 4544 S Lamar Blvd in Austin?

Austin permits describe a change of use and finish-out for a theater and dance school. The permits were filed Nov. 3 and Nov. 16, 2026, and reference phase 2.2.

Is a theater opening at 4544 South Lamar?

A permit filed Oct. 23, 2026, covers an illuminated sign reading “Luxora Theater.” Separate permits describe a theater and dance school finish-out, but the records do not give an opening date.

What work is planned near 4544 South Lamar Center?

Permits at the address describe a theater and dance school finish-out, rooftop solar, and a sewer yard line repair. The finish-out permits were filed Nov. 3 and Nov. 16, 2026.

What does the theater and dance school project include?

The permit description calls for a change of use and finish-out, new exterior openings for glazing, and shade canopies over exits. It identifies the work as phase 2.2.

Is there medical office construction at 4544 S Lamar Blvd?

Austin permits filed in June and July 2026 describe an interior finish-out to create a medical office and minor renovations to an existing medical office.

Are there permits for solar panels at 4544 S Lamar Blvd?

Yes. An active building permit filed Nov. 13, 2026, describes rooftop solar and a backfed-breaker interconnection.

What is the latest permit at 4544 S Lamar Blvd?

The latest listed permit is an active plumbing permit filed Nov. 18, 2026, for a sewer yard line repair from a manhole to a lift station.