11401-1/2 Escarpment Blvd
Austin, TX 78739
11401-1/2 Escarpment Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 11401-1/2 Escarpment Blvd, Austin, TX 78739. The most recent, filed April 10, 2008, covers: “Verizon wireless: escarpment”.
Compiled from City of Austin records · updated Apr 10, 2008
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2008
- since Apr 10, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 11401-1/2 Escarpment Blvd
What is being built at 11401-1/2 Escarpment Blvd?
The latest filing (City of Austin case 10079387, April 10, 2008) covers verizon wireless: escarpment.
How many permits and filings does 11401-1/2 Escarpment Blvd have?
1 filing across 1 project, from April 10, 2008 to April 10, 2008.
Is there other construction near 11401-1/2 Escarpment Blvd?
Yes. Nearby filings include 11401 Escarpment Blvd (replacement of existing stand-by generator automatic transfer switch on docking station on existing concrete pad, Jul 8, 2024); 6405 Aden Ln (replacement of panel from 100amp to 200 amp main panel, Aug 27, 2024); 6409 Aden Ln (plug for tankless, Apr 15, 2024).
How do I get alerts for new permits at 11401-1/2 Escarpment Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78739- 11401 Escarpment BlvdJul 8, 2024Replacement of existing stand-by generator automatic transfer switch on docking station on existing concrete pad · 80 m away
- 6405 Aden LnAug 27, 2024Replacement of panel from 100amp to 200 amp main panel · 145 m away
- 6409 Aden LnApr 15, 2024Plug for tankless · 149 m away
- 6413 Aden LnMar 25, 2026In-ground pool with spa and concrete decking · 156 m away
- 11409 Maggiore DrJul 11, 2024Replaced prv in yard · 181 m away
- 11401 Maggiore DrAug 31, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout: replace existing 4-ton horizontal gas split system (furnace coil condenser) like-for-like; no structural change · 199 m away
- 11300 Tracton LnJun 18, 2026We will be replacing the electrical panel and meter-can. we will install a ground system as well. *pec customer per ec contractor · 209 m away
- 6420 Aden LnOct 28, 2025Rebuild underground electrical service. pedernales electric co-op is the service provider · 221 m away
- 11321 Aden CtMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 255 m away
- 6125 Mordred LnFeb 21, 2024Replacement of an existing 50 gallon gas water heater in garage · 256 m away
- 11238 Tracton LnNov 17, 2025Replacement of complete existing central heat and air system with or without duct work · 255 m away
- 6121 Mordred LnJul 23, 2025200 amp main service upgrade by removing current meter can and adding new 200 amp meter can followed by a 200 amp panel grounding rods and surge protection · 273 m away