9701 Timber Ridge Pass
Austin, TX 78733
Backup battery system permitted at 9701 Timber Ridge Pass
An active City of Austin electrical permit indicates a backup battery system and an additional meter socket are being installed at 9701 Timber Ridge Pass. The permit, 2026-140137 EP, was filed on November 12, 2026.
Summarized from City of Austin records · updated Nov 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 12, 2026
- since Nov 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj base: installing a backup battery system and additional meter socket. austin energy customer
- AppliedOct 23, 2026
- IssuedNov 12, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj base: installing a backup battery system and additional meter socket. austin energy customer
Etj base: installing a backup battery system and additional meter socket. austin energy customer
City of Austin permitElectrical PermitActive- Record
- 2026-140137 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9701 Timber Ridge Pass
What is being installed at 9701 Timber Ridge Pass?
A City of Austin electrical permit describes installation of a backup battery system and an additional meter socket.
When was the permit for 9701 Timber Ridge Pass filed?
Permit 2026-140137 EP was filed on November 12, 2026.
Is the electrical permit for 9701 Timber Ridge Pass active?
Yes. The City of Austin record lists permit 2026-140137 EP as active.
Does the project at 9701 Timber Ridge Pass include a backup battery?
Yes. The permit description says a backup battery system is being installed.
What electrical work is permitted at 9701 Timber Ridge Pass?
The permit covers a backup battery system and an additional meter socket. The record identifies the customer as an Austin Energy customer.
Also being built nearby
All of 78733- 9705 Timber Ridge PassJul 31, 2026Owner its going to remove old siding for new sidingelectrical services its attach to the wall i make suggestion to owner to get meter service upgrade to 200 amps because old meter looks old and not to nec standars · 57 m away
- 9704 Timber Ridge PassJan 11, 2024Request to disconnect. install tesla backup gateway. overhead. ae. meter can not replaced - no espa · 66 m away
- 9700 Timber Ridge PassOct 14, 2025Tree knocked down power lines going to a permanent overhead service pole service pole also got knocked down. repair service pole upgrade meter socket to todays ae approval meter socket ground service · 67 m away
- 103 Westward CvJan 6, 2026Install 200amp oh service · 98 m away
- 102 Westward CvMay 29, 2024Rebuild electrical service. customer wants to rebuild electrical service because current electrical service is old · 135 m away
- 9604 Southward CvMar 13, 2024Replace old panel with current panel · 199 m away
- 9810 Timber Ridge PassFeb 14, 2024Ruffino install new _5.475__kw rooftop solar system to existing residential only using backfed breaker · 254 m away
- 202 S Tumbleweed TrlMay 23, 2025Nema three exterior 24 circuit subpanel replacement removing replacement existing panel and while were there and install a two pole 30 amp gfi breaker feeding car charger · 260 m away
- 101 S Lake Hills DrMay 4, 2026Install new energy storage system to existing single family residence. overhead ae · 271 m away
- 101 Lake Hills DrFeb 17, 2022101 n lake hills amended plat · 271 m away
- 107 S Lake Hills DrApr 9, 2024Installation of residential solar pv system only · 321 m away
- 200 N Lake Hills DrMar 2, 2024T pole · 367 m away