Permit filed for EV charging station circuit
A permit indicates a circuit is being installed for an electric-vehicle charging station at 13006 Tantivy Dr. The City of Austin issued the electrical permit on November 10, 2026.
Summarized from City of Austin records · updated Nov 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2026
- since Nov 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underway(malik asad) - installation of circuit for elec. vehicle charging station - esip
- AppliedOct 19, 2026
- IssuedNov 10, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project
Permit & project history
1 project(malik asad) - installation of circuit for elec. vehicle charging station - esip
(malik asad) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitActive- Record
- 2026-137527 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13006 Tantivy Dr
What is being built at 13006 Tantivy Dr?
A City of Austin electrical permit indicates a circuit is being installed for an electric-vehicle charging station. The permit was filed November 10, 2026.
Is an EV charger being installed at 13006 Tantivy Dr?
The permit describes installation of a circuit for an electric-vehicle charging station. It does not specify whether the charging station itself is included.
When was the permit filed for 13006 Tantivy Dr?
The City of Austin permit was filed November 10, 2026. Its number is 2026-137527 EP.
What is permit 2026-137527 EP for?
It is an active electrical permit for installing a circuit for an electric-vehicle charging station at 13006 Tantivy Dr.
Is the EV charging project near Pond Springs Elementary?
Yes. Pond Springs Elementary is listed 184 meters from 13006 Tantivy Dr, where a permit was filed for a circuit for an electric-vehicle charging station.
Also being built nearby
All of 78729- 13004 Tantivy DrApr 25, 2024Upgrade service for tesla charger. going to 200a service instead of 125a. underground fed · 14 m away
- 13000 Tantivy DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 7720 Elkhorn Mountain TrlSep 26, 2024Install 40 gal water heater · 57 m away
- 13018 Partridge Bend DrFeb 29, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 13016 Partridge Bend DrApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 7721 Elkhorn Mountain TrlSep 9, 2024Coa has requested homeowner to pull electrical permit to proceed with electrical of greenhouse we will be adding service outlets for greenhouse providing a dedicated circuit for this area no electrical work to be performed to the existing electrical panel · 112 m away
- 8106 Tallyho TrlFeb 12, 2026Replacement of complete existing central heat and air system with or without duct work installing a single stage 3.5 ton gas unit 454b · 119 m away
- 13005 Huntwood CvMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 8002 Tantara CtJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 8108 Tallyho TrlApr 24, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 7801 Elkhorn Mountain TrlNov 11, 2024Ev charger install · 150 m away
- 8109 Tallyho TrlJan 12, 2026Replacing 50 feet of 1 inch water line from the water meter to the house due to a water leak · 153 m away