5904 Jacqueline Ln
Austin, TX 78724
New 200-amp electrical service pole permitted
A standalone 200-amp electrical service pole is planned to provide power to the property at 5904 Jacqueline Ln. The City of Austin issued an active electrical permit for the work on November 10, 2026.
Summarized from City of Austin records · updated Nov 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2026
- since Nov 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstall new standalone 200-amp electrical service pole to provide power to the property. scope includes installation of treated service pole 200a meter socket main disconnect grounding electrode system service entrance conductors utility attachment point and all associated equipment in compliance with current nec and local utility requirements
- AppliedNov 5, 2026
- IssuedNov 10, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new standalone 200-amp electrical service pole to provide power to the property. scope includes installation of treated service pole 200a meter socket main disconnect grounding electrode system service entrance conductors utility attachment point and all associated equipment in compliance with current nec and local utility requirements
Install new standalone 200-amp electrical service pole to provide power to the property. scope includes installation of treated service pole 200a meter socket main disconnect grounding electrode system service entrance conductors utility attachment point and all associated equipment in compliance with current nec and local utility requirements
City of Austin permitElectrical PermitActive- Record
- 2026-146556 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5904 Jacqueline Ln
What is being built at 5904 Jacqueline Ln?
A City of Austin permit covers installation of a standalone 200-amp electrical service pole and related equipment. It does not describe a new building.
What does Austin permit 2026-146556 EP cover?
The permit covers a treated service pole, 200-amp meter socket, main disconnect, grounding system, service conductors and associated equipment.
When was the electrical work at 5904 Jacqueline Ln permitted?
The City of Austin permit was filed on November 10, 2026.
How large is the planned electrical service?
The permit describes a 200-amp electrical service.
Is a new home being built at 5904 Jacqueline Ln?
The available permit record describes electrical service installation, not home construction.
Is the electrical permit for 5904 Jacqueline Ln active?
Yes. Permit 2026-146556 EP is listed as active.
Also being built nearby
All of 78724- 6009 Jacqueline LnFeb 3, 2026Upgrade outdoor electrical service only · 169 m away
- 6001 Jfk DrNov 27, 2023Install meter loop for mobile home · 174 m away
- 5707 Jacqueline LnAug 1, 2024New panel and meter · 190 m away
- 6005 Jfk DrSep 12, 2024Upgrade existing single metered main to 2-200a metered mains with 2 main panelboards · 196 m away
- 5704 Jacqueline LnJun 8, 2026Etj-emergency-replace meter loop (called out to contractor work is already done will need to upload espa prior to final) · 202 m away
- 6111 Wideleaf DrAug 7, 2024Roof top solar install · 238 m away
- 15206 Wideleaf CvJul 10, 2024Auxiliary permit needed - solar permit is pulled with travis county - install residential roof mounted solar photovoltaic system: 7.380 kw dc roof mount solar pv system - 18 hanwha q cells q.peak duo blk ml-g10+ 410w pv modules with - 18 enphase iq8plus-72-2-us microinverters · 279 m away
- 15415 Trumpet DrNov 12, 2024Applying for a the sign intake for 15415 dr. service rack to be reviewed to install for 4 200amp meter sockets they will be serving 4 150 amp breaker enclosure. (service only) theres one existing meter but its moving to the service rack so at the end of the project were gonna have a rack with 5 meters 15415 trumpet dr 15415 trumpet dr 1 2 1a 1b · 284 m away
- 5615 Jfk DrNov 16, 202314.985kw dc roof mount solar pv system with 37 q cell q.peak duo blk ml-g10+ 405w 37 enphase iq8plus-72-m-us micro inverter main panel upgrade required 225a main panel · 314 m away
- 5801 Wideleaf DrApr 23, 2008Forest bluff section 4 (plat vacation) · 358 m away
- 6107 Melody LnFeb 3, 2026Upgrade outdoor electrical service only · 375 m away
- 15112 Bullbrier RdFeb 2, 2024Solar array · 378 m away