Goldsmith Hall classrooms getting a 7,336-square-foot refresh

A refresh of three classrooms totaling 7,336 square feet is planned at Goldsmith Hall, 310 Inner Campus Dr. The project was registered with TDLR on March 5, 2026, and its status is listed as Inspection Complete. The scope includes new paint, ceiling tiles and grid, light fixtures and power receptacles, plus refinished wood floors and baseboards.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 5, 2026

Projects
2
2 filings
Latest filing
Mar 5, 2026
since Mar 28, 2025
Largest scope
7,336 sf
Estimated cost
$1.1M
state registration

Where this project stands

Inspected · closing out

GOL - Classrooms Refresh

7,336 sq ft · $1.1M est.

  1. RegisteredMar 5, 2026
  2. Plan review
  3. ConstructionMay '26 – Aug '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Refreshing (3) classrooms totaling 7,336 sq ft with new paint, ceiling tiles/grid, light fixtures, power receptacles, and refinishing the wood floors and baseboards. — goldsmith hall

    TDLR project registrationRenovation/AlterationInspection Complete7,336 sq ft$1.1M est.
    Tenant / owner
    Gol - Classrooms Refresh
    Design firm
    Pro
    Contact
    Pro
  2. Installation of ascension ada elevator lift to make 1.103&1.108 accessible from 1.101 in goldsmith hall. this will require modification of railing, installation of a platform extension, and lift installation. — goldsmith hall

    TDLR project registrationAdditions to Existing BuildingReview Complete1 sq ft$101K est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 310 Inner Campus Dr

What is being built at 310 Inner Campus Dr?

The TDLR registration describes a renovation of three Goldsmith Hall classrooms totaling 7,336 square feet. Work includes new paint, ceiling tiles and grid, light fixtures and power receptacles, and refinished wood floors and baseboards.

When was the Goldsmith Hall classroom renovation permitted?

The project was registered with TDLR on March 5, 2026. Its registration number is TABS2026014262, and its status is listed as Inspection Complete.

How much will the Goldsmith Hall classroom refresh cost?

The TDLR registration lists an applicant-estimated project cost of $1.1 million. This is an estimate, not a confirmed final cost.

How many classrooms are being refreshed at Goldsmith Hall?

The registration describes work in three classrooms, totaling 7,336 square feet.

What's happening near the Alessi Lab Renovation at 2305 Speedway?

At 310 Inner Campus Dr, about 119 meters away, a TDLR registration describes a refresh of three Goldsmith Hall classrooms. It was filed on March 5, 2026.

Was there also an accessibility project at Goldsmith Hall?

Yes. A separate TDLR registration filed March 28, 2025, describes installing an ADA lift to improve access to rooms 1.103 and 1.108 from room 1.101, with railing and platform modifications. Its registration number is TABS2025015319.