623 West 38th Street
Austin, TX 78705 · Sunflower Bank Suite 300 Finish-Out, Sunflower Bank Suite 105 Renovation
Sunflower Bank renovating two suites in Austin office building
Sunflower Bank is renovating suites 105 and 300 in the existing multi-tenant office building at 623 West 38th Street. TDLR registrations were filed December 9, 2025, for suite 105 and July 17, 2026, for suite 300; the suite 300 registration lists 3,537 square feet.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 17, 2026
- since Dec 9, 2025
- Largest scope
- 3,537 sf
- Estimated cost
- $468K
- state registration
Where this project stands
Finishing up · inspection nextSunflower Bank Suite 300 Finish-Out
3,537 sq ft · $468K est.
- RegisteredJul 17, 2026
- Plan review
- ConstructionAug '26 – Nov '26
- Inspectednow
- Closed
Scheduled to finish Nov 2, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsInterior renovation of an existing office building — sunflower bank
TDLR project registrationRenovation/AlterationReview Complete3,537 sq ft$468K est.- Project #
- TABS2026025533
- Tenant / owner
- Sunflower Bank Suite 300 Finish-Out
- Design firm
- Pro
- Contact
- Pro
Interior renovation of an existing office building. — sunflower bank
TDLR project registrationRenovation/AlterationInspection Complete1,929 sq ft$75K est.- Project #
- TABS2026007583
- Tenant / owner
- Sunflower Bank Suite 105 Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 623 West 38th Street
What is being built at 623 West 38th Street in Austin?
TDLR registrations indicate interior renovations of two suites for Sunflower Bank in an existing multi-tenant office building. They do not describe a new building.
Is Sunflower Bank renovating space at 623 West 38th Street?
Yes. Registrations describe renovations to suites 105 and 300. The suite 105 project was filed December 9, 2025, and the suite 300 project was filed July 17, 2026.
How large is the Sunflower Bank Suite 300 renovation?
The TDLR registration lists 3,537 square feet for the suite 300 finish-out. It was filed July 17, 2026.
When was the Suite 105 renovation at 623 West 38th Street filed?
The TDLR registration for Sunflower Bank Suite 105 Renovation was filed December 9, 2025. It lists an interior renovation of an existing office building.
Is the whole building at 623 West 38th Street for Sunflower Bank?
The records identify Sunflower Bank renovations in suites 105 and 300 of a multi-tenant office building. They do not say the whole building is occupied by the bank.
Also being built nearby
All of 78705- 623 W 38th StAug 19, 2026Remodel admin office · 58 m away
- 3706 Guadalupe StApr 19, 2024Installation of a new channel letter sign for tt foot massage. north elevation · 102 m away
- 3711 Guadalupe StAug 26, 2024Change of use from restaurant to pet services with finish out needs revision due to adding med gas room spoke with robert and robert checked in with chris p. and confirmed that needs revision for one hour rated med gas room. charles a · 159 m away
- 3701 Guadalupe StApr 28, 2025Tenant infill of existing vacant unit change of use from personal services to restaurant-limited for a coffee shop · 166 m away
- 711 W 38th StOct 1, 2026We are fixing an ae meter enclosure on a 175amp 120/208v 3phase service. we have to have it permitted because the ae is going to have to shut down this building/transformer · 171 m away
- 700 W 35th StJun 15, 2026Replace interior hot and cold water lines with uponor pex pipe · 194 m away
- 3511 Guadalupe StAug 15, 2025Install (1) illuminated channel cabinet onto north elevation reading grease monkey · 200 m away
- 704 W 35th StAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 206 m away
- 3815 Guadalupe StNov 10, 2026Replacement of complete existing central heat and air system with or without duct work 2 ton kaden single-stage gas system · 211 m away
- 3501 Guadalupe StJan 7, 2025Constructing 3 interior non-structural walls on the north side of the building to create a storage room · 214 m away
- 619 W 35th StMay 5, 2025Express: remove and replace 8 existing windows like for like. no remodel · 226 m away
- 710 W 35th StFeb 8, 2024Connected water heater vent to draft hood. removed combustible material at top of closet. installed combustion air vents in closet · 236 m away
More offices in 78705.