900 Thompson St
Austin, TX 78702
Austin approves Eastside ECHS turf site plan
A City of Austin site-plan case for Eastside ECHS turf at 900 Thompson St was approved on November 13, 2026. The record names the project “ESP- AISD - Eastside ECHS Turf (R1)” and lists its status as “CC Approved.”
Summarized from City of Austin records · updated Nov 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 13, 2026
- since Nov 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 900 Thompson St
What is being built at 900 Thompson St in Austin?
A City of Austin site-plan case is for Eastside ECHS turf. The case was approved on November 13, 2026.
When was the Eastside ECHS turf plan approved?
The City of Austin case was filed on November 13, 2026, and its status is listed as “CC Approved.” Case number: 13795395.
Is new turf planned at Eastside ECHS in Austin?
A City of Austin site-plan case named “ESP- AISD - Eastside ECHS Turf (R1)” indicates a turf project. The record does not provide a construction schedule.
What is planned near Rosewood Hall in Austin?
A site-plan case for Eastside ECHS turf is listed at 900 Thompson St, about 222 meters from Rosewood Hall at 2406 Rosewood Ave. The case was approved on November 13, 2026.
What City of Austin permits or cases are listed for 900 Thompson St?
The records include an Eastside ECHS turf site-plan case filed November 13, 2026, and a “New Polyurethane” site-plan case filed March 2, 2007. The turf case is listed as “CC Approved.”
Also being built nearby
All of 78702- 907 Thompson StJan 23, 2024Replacement of an existing water heaters (units 56045605 & 5606) · 84 m away
- 811 Thompson StJan 16, 2024Replacement of an existing water heater · 94 m away
- 803 Thompson StJan 16, 2024Replacement of an existing water heater · 128 m away
- 901 Neal StNov 16, 2026Repair driveway approach of 10 ft (2 driveways) and sidewalk repair of 5 lf sp-2018-0450cx.f1 2019 139205 000 00 ssi *** permit issued with inspectors and applicants request for correction work/punch list item only. no original ds found · 130 m away
- 705 Thompson StJan 16, 2024Replacement of an existing water heater · 153 m away
- 2401 Rosewood AveJan 16, 2024Replacement of an existing water heaters 1101-1106 · 172 m away
- 706 Bedford StJan 16, 2024Replacement of an existing water heater · 174 m away
- 916 Neal StDec 21, 2007Neal street subdivision (smart housing), (a resub of rosewood village sec 7) — neal street subdivision (smart housing); resubdivision · 187 m away
- 707 Bedford StJan 16, 2024Replacement of an existing water heater · 191 m away
- 1009 Glen Oaks CtDec 2, 2024Express: foundation repair · 206 m away
- 3013 Kuhlman AveApr 17, 2017Rosewood village sec 5 · 208 m away
- 904 Bedford StJan 24, 2024Replacement of an existing water heaters (units: 12011202120312041205&1206) · 221 m away