groundranger
Active · latest filing Nov 2026Commercial

1601 Miriam Ave

Austin, TX 78702

HVAC and water heater replacements at 1601 Miriam Ave

Recent City of Austin permits at 1601 Miriam Ave cover replacement of existing heating and air-conditioning systems and water heaters, rather than a new building. The latest filing, an active mechanical permit dated November 10, 2026, is for a complete central HVAC system replacement. A site plan for Chestnut Plaza Phase One was approved and released in 2008.

Summarized from City of Austin records · updated Nov 10, 2026

Projects
11
11 filings
Latest filing
Nov 10, 2026
since May 19, 2008
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacement of complete existing central heat and air system with or without duct work replacement of hvac system

  1. AppliedNov 6, 2026
  2. IssuedNov 10, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
5% through of the permit windowNov 10, 2026 → May 9, 2027

1 contact on this project · 1 phone number

Permit & project history

11 projects
  1. Replacement of complete existing central heat and air system with or without duct work replacement of hvac system

    Replacement of complete existing central heat and air system with or without duct work replacement of hvac system

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work install new 2-ton carrier performance series 17-seer2 two-speed electric ac & gas heating system

    Replacement of complete existing central heat and air system with or without duct work install new 2-ton carrier performance series 17-seer2 two-speed electric ac & gas heating system

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of an existing water heater replace 50-gallon gas water heater located in 2nd floor closet

    Replacement of an existing water heater replace 50-gallon gas water heater located in 2nd floor closet

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replacement of complete existing central heat and air system with or without duct work install new 2.5-ton goodman 14.3-seer cooling ac & gas heating system

    Replacement of complete existing central heat and air system with or without duct work install new 2.5-ton goodman 14.3-seer cooling ac & gas heating system

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Replacement of complete existing central heat and air system with or without duct work carrier 2 ton 16 seer2 single stage ecobee smart thermostat enhanced 4 filter base-honeywell equipment check: + condenser: 26sca524w003 + furnace: 58sc0b045m14--12 + coil: caamp2414ama + honeywell wifi programmable thermostat

    Replacement of complete existing central heat and air system with or without duct work carrier 2 ton 16 seer2 single stage ecobee smart thermostat enhanced 4 filter base-honeywell equipment check: + condenser: 26sca524w003 + furnace: 58sc0b045m14--12 + coil: caamp2414ama + honeywell wifi programmable thermostat

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Replacement of complete existing central heat and air system with or without duct work unit 108

    Replacement of complete existing central heat and air system with or without duct work unit 108

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. CHESTNUT PLAZA PHASE ONE

    Chestnut plaza phase one

    City of Austin casesite_planApproved and Released
    Record
    10090885
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1601 Miriam Ave

What is being built at 1601 Miriam Ave?

Recent permits describe replacements of existing HVAC systems and water heaters, not new construction. The latest is active mechanical permit 2026-146577 MP, filed November 10, 2026.

Is a new building planned at 1601 Miriam Ave?

The recent permit records provided do not show a new building project. They cover replacement work on existing heating, cooling, and water-heating systems.

What work is the November 2026 permit for at 1601 Miriam Ave?

Active permit 2026-146577 MP, filed November 10, 2026, covers replacement of the complete existing central heat and air system, with or without ductwork replacement.

Were there other HVAC permits at 1601 Miriam Ave in 2026?

Yes. Permits filed January 19, March 24, and June 22, 2026 also cover replacement of existing central heating and air-conditioning systems.

What is the Chestnut Plaza record for 1601 Miriam Ave?

The City of Austin approved and released a site plan named Chestnut Plaza Phase One on May 19, 2008. Recent filings at the address concern system replacements.

Also being built nearby

All of 78702
Email me when it passes final inspection