groundranger
Active · latest filing Nov 2026Commercial

1305 Waller St

Austin, TX 78702

Permits filed to permanently close a shower window

Building and plumbing permits indicate work to remove an existing window inside a shower and close the opening permanently at 1305 Waller St. The building permit was filed November 3, 2026, and the plumbing permit was filed November 11, 2026; both are listed as active.

Summarized from City of Austin records · updated Nov 11, 2026

Projects
4
4 filings
Latest filing
Nov 11, 2026
since Feb 3, 2009
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed

  1. AppliedSep 23, 2026
  2. IssuedNov 11, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
5% through of the permit windowNov 11, 2026 → May 3, 2027

1 contact on this project

Permit & project history

4 projects
  1. To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed

    To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed

    To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Rivian wall ev charger: install a new 60-amp circuit in the 200-amp subpanel and route wiring right of the panel to the interior side wall of the garage to the interior right ball of the garage. hardwire the rivian wall charger and configure to draw up to 48 amps continuous route wire behind the wall per customer instruction-- however if you notice obstructions cat inhibit this wire like other wire plumbing wall joist please stop what you are doing and alert tree house. a preference of the customer but we will not sacrifice damaging existing infrastructure for this

    Rivian wall ev charger: install a new 60-amp circuit in the 200-amp subpanel and route wiring right of the panel to the interior side wall of the garage to the interior right ball of the garage. hardwire the rivian wall charger and configure to draw up to 48 amps continuous route wire behind the wall per customer instruction-- however if you notice obstructions cat inhibit this wire like other wire plumbing wall joist please stop what you are doing and alert tree house. a preference of the customer but we will not sacrifice damaging existing infrastructure for this

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. JOSEPH LIMERICK SUBDIVISION OF OUTLOT 41, DIVISION "B", AMENDED PLAT OF LOTS 35

    Joseph limerick subdivision of outlot 41, division "b", amended plat of lots 35 & 36

    City of Austin casesubdivisionApproved
    Record
    257005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1305 Waller St

What is being built at 1305 Waller St?

The latest permits indicate an existing shower window will be removed and the opening closed permanently. They do not describe a new building.

What work do the permits at 1305 Waller St cover?

The permit descriptions cover removing a window inside a shower and permanently closing it. The records include building permit 2026-131607 BP and plumbing permit 2026-131607 PP.

When were permits filed for 1305 Waller St?

The building permit was filed November 3, 2026, and the plumbing permit was filed November 11, 2026. Both are listed as active.

Is a new building planned at 1305 Waller St?

The recent permit descriptions indicate work on an existing shower, not construction of a new building.

Was an EV charger permitted at 1305 Waller St?

An electrical permit filed July 7, 2026, covers a new circuit and a hardwired Rivian wall charger in the garage. The permit is listed as final.

What is the subdivision history for 1305 Waller St?

An amended plat case for the Joseph Limerick subdivision was approved February 3, 2009. The case record refers to Outlot 41, Division B, and Lots 35 and 36.

Also being built nearby

All of 78702
Email me when it passes final inspection